SARTHAK ASSOCIATES OFFICE NO C 7, THIRD FLOOR, PROZONE TRADE CENTRE, PROZONE MALL, AURANGABAD _ 431006 Annexure A FORM 1 ISee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 08-01-2024 To, NAVBHARAT BUILDERS, PLOT NO 54, NS 1 CIDCO, SHIVAJI NAGAR, AURANGABAD .02 Sublect: Certificate of Percentage of Completion of Construction Work of LABH APARTMENTShaving MahaRERA Registration Number P51500052867 being developed by NAVBHARAT BUILDERS Sir, l/ WeM/s.SARTHAK ASSOCIATES have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of LABH APARTMENTS having MahaRERA Registration Number P51500052867 being developed by NAVBHARAT BU ILDERS Based on the Site Inspection, with respect to the Layout / each BuildingANing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-8. TABLE.A FOR BUILDING OF LABH APARTMENTS S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100o/o 2. Basements (if anv) Podiums (if anv) 4. Plinth 1OlYo 5. Stilt Floor 100% 6 Slab of Super Structure 100o/o 7 lnternal Walls, lnterna! Plaster, Floorings, Doors, 600/o windows within Flats / Premises 8. Sanitarv Fittinqs within Flats / Premises 20o/o SARTHAK ASSOCIATES OFFICE NO C-7, THIRD FIOOR, PROZONE TRADE CENTRE, PROZONE MALL, AURANGABAD _ 431006 9. Staircases, Lift Wells & Lobbies at each Floor Level 50o/o Overhead and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, 50% Completion of Terraces, with waterproofing of the Buildinq / Winq 11. lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 70% and Equipment's as per CFO NOC, Electrical Fittings, lvlechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activrtv TABLE.B Common Areas (lnternal & External Development Works) in respect of the Registered Project FOR BUILDING OF LABH APARTMENTS S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (2\ (3) (4) (5) 1 lnternal Roads & Footpaths NO N.A. 2 Water Supply YES 50% FROM BORE-WELL Sewerage (Chamber, Lines, YES 50Yo DRAINAGE LINE Septic Tank, STP) TILL CORPORATION LINE 4 Strom Water Drains NO N,A, 5. Landsca pinq & Tree Plantinq NO N,A, 6. Street Liqhtinq NO N,A, 7. Communitv Buildinqs NO N,A, 8 Treatment & Disposal of NO N,A, Sewaqe and Sullaqe Water o Solid Waste IVlanagement & NO N,A, Disposal 10 Water Conservation / Rain YES 00% RAIN WATER Water Harvesting HARVESTING AS PER NORMS 11 Enerqy Manaqement NO N,A, 12 Fire Protection & Fire Safety NO N,A, requirements t 13 14. Electncal Meter Room, Sub- Station, Receivinq Station Others (Option to Add more) YES NO 00% SEPARET METER AREA N.A, SARTHAK ASSOCIATES OFFICE NO C,7, THIRD FLOOR, PROZONE TRADE CENTRE, PROZONE MALL. AURANGABAD _ 431006 Yours faithfully, FoT SARTHAK ASSOCIATES * \ r"'-la Signature & Name (lN BLOCK Surveyor / Architect License Number ( ) Agreed & Accepted by: Signature of Promoter Name:NAVBHARAT BUILDERS Date:08-01-2024