NITIN SHIVAJIGAIKWAD DOE CIVL ENGINEER FORA-2 EWGINERS AAE Desgaat aouTt-Pot Wise Date 30/Os/2124 The Stic FEaites ZNE FcrGoira Ohembs Near Churia Pra Pump Atalat a Auatgta VH4313 Subije Cericatef Csimouresfor Deveicgmert of StickSiidhi tavirg WataPERA Registration NhTCer 5150S98 erg deseped by Shick Fezities Sir INitm SthajGakNa hae uderzke 2sgert of cetfimg Estimated Cost for having WahPERA egs aor NurtEr 51520050908 oiy picabie f roe Fegistration being deveioped by Strick Feaites 2. We have strae eost f Ci MEP anc alie: woris reoured for compietion of the aames ac rorate aopieton of interal & tenal woris of the project 2s per sefctors metioredir atadmet of saie Or estiated oost caiculations are based on the Zaizie mate aaiatie O sforte proje Soer reference by the Deveioper / Consutarits The Scthesle of ies ac aatty regLired for the etire work 2s caiiclated by uantity surveyor gpoited by Deveicper Engineer. the ssumprion to the cos of material labour and other inputs mad by deelcper. znd the site inspectiom carried out byus to 2scertain / confirm the above anahysis 2 We estiate Total Estiated Cost of completion o the sforesaiid project under reference at Rs 70658579-(Toal of Tabie Aand B at the time of Registration The estimated Total Cost of Project is wi refererces tothe C)L MUP and Alied works reguired for completion of the apartments and Proportionate compiczsio of intenal etemal wcoris As per specifications mentioned in agreement of saie znd For the purpose of citraiing ocouption certicate / completion certiƱicate for the Builicingis) / Wingls) r Layout/ Plotted Deveiopment from the being the Planning Authority under ahose jurissiction the tresaid projet is being impiemented 4. The Estimates Cost incurred till date is calculated t Rs 2,18,24,410/- (Total of Tabie Aand B) the amout of Estimated Cost incurred is calculated on the basis of input materials/services used and uit cost of this items 5. The Balance Cost of Completion of the Chvi, MEP and Allied works for completion of the zpartments and Completion of internal & eternal works, s per specifications mentioned in agregment of sale, of the Project is estimated at Rs 488,44,269/- (Total of Table Aand B) DCE CVL ENGNEER NITIN SHIVAJIGAIKWAD DCE CIVIL ENGINEER Office :Mhada Colony N2 Cideo Chhatrapati Sambhaji Nagar (MS)-431005 Email : nitingaikwad2l2@gmail.com :Mob. :9158686838. 6.Icertify that the Cost of the Civil, MEP and allied work for the apartments and proportionate and internal &Extremal works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date others certificate is as given in (Table Aand B) below: TABLE-A Building Wing/ Layout / Plotted Development bearing Number Gut No. 718, Chikhalthana, Near ChaudhariColony, Aurabngabad called "Shlok Siddhi" (To be prepared separately for each building /Wing / layout /Plotted Development of the Real Estate Project) Sr.no Particulars Amount (in Rs.) 1 Total estimated Cost of the Building/Wing /Layout/ Plotted 5,72,05,089 Development as on date of Registration is 2 Cost increed as on date of certificate 1,79,45,730 3 Work done in Percentage (as Percentage of the estimated cost) 22.48% 4 Balance Cost to be incurred** (Based on Estimated Cost) 3,92,59,359 5 Cost Incurred on Additional /Extra items not included in the Estimalsd Cost (Table -C) TABLE-B Internal &External DevelopmentWorks in Respect of the Registered Phase Sr Particulars Amount (in Rs.) No 1 Total Estimated Cost of the Internal and External Development 1,34,63,590 Works including amenities and Facilities in 2 Cost incurred as on date of certificate 38,78,680 3 Work done in Percentage (as Percentage of the estimated cost) 28.81% 4 Balance Cost to be incurred** (Based on Estimated Cost) 95,84,910 5 Cost Incurred on Additional /Extra items not included in the Estimated Cost (Table -C) Yours Faithfully, Agreed Sptedby: REA Engineer Sighature of Promoter Nitin Shivaji Gaikwad Name: Ca Navneet Bhartiy DCE Civil Engineer Date:18/07/2024 Date:30/06/2024 Note: 3AJI GAIKVAD DCE CIVIL ENGINEER NITIN SHIVAJIGAIKWAD DCE CIVIL ENGINEER Offiee :Mhuda Colony N2 Cideo Chbutraputi Sapbbaji Nugar (M S)-431005 Eail pitingaikwad22@gmail.com :Mob. 9150686438. 1 The scope of work Is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. Quantity 2. (-) Quantity survey can be done by office of Engineer or can be done by an independent of Surveyor. whose certificate of quantity calculated can be relled upon by the Engineer. caseIn the independent quantity surveyor being appointed by Developer, the name has to be mentioned ofat the the name place marked (") and in case quantity are being calculated by office of Engineer,should be mentioned person in the office of Engineer, who is responsible for the quantity calculated at the place marked (") estimated Cost (1) 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total of cost etc. As this an and Actual Cost incurred (2) due to deviation in quantity required / escalation Estate Project will estimated cost, any deviation in quantity required for development of the Real result in amendment of the cost incurred to be incurred. exhaustive 5. All components of work with specifications are indicative and not material 6. Please specify if there are any deviations qualifications. Example: Any deviations in input used from specifications in agreement of sale. TABLE-C List of Extra/Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr.no Particulars Amount (In Rs.) 1 WTCAJI GAKVIAD DCE CVL ENGINEER