D H I SAJ J AD ARcH rrREMclr [See Regulation 3! ARC HITECT'S CERTIFICATE from (ro be suomitteo at the time il;f;il'""i1#;l"lX5*lect and for withdrawar of Monev "f DATE: 30-09-2025 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad - 431001 ' Homes having subject: certificate of Percentage of completion of construction work of Happy being developed by Gayatri Ashok Mule' MahaRERA Registration Number P51500051755 Sir, l/WeSajjadA.KLodhihaveundertakenassignmentasArchitect/LicensedSurveyorofcertifying MahaRERA Registration Number percentage of completion of construction work of having Homes' P51500051755 being developed by Happy project r certify Based on Site inspection with respect to Layout / each of the aforesaid Rear Estate of that as on the date of this certificate, the e"r."ni.g" of work done for each of the building/wing of the work is as pei Table A herein below' Percentage i' the Real Estate project under MahaRERA in Talle B ' executed with respect to each of the activitf of the entire phase is detailed I: ' TABTE-A , i, , : TO 06 (To be prepared separately for each Layout / Building Wing Number ROW HOUSE NO 01 Layout ins/Wine of The Proj ) Percentage of Actual Work I Tasks / ActivitY Done (2) lr 1 (As on date of this Certificate) Basement's (if anY) Podiums (if anY) Stilt Floor Slabs of SuPer Structdre lnternal walls, lnternrf pf"t"t, Eoorings' l) doors and windows within Flats/Premises ntti n gs wit h i n tlglEglgryI --' SA'IAD A.K. LODHI cA/os/37094 Mobile : +91 9960507662 2nd floor, Above Chintamani Sweets, E-mail : architectsajjadlodhi@yahoo'co'ir rrr^^r Daliaa f-,nmmissioner OffiCe. ,2/Ar^mril nnn Floor level und Water Tanks / ExternalplumbinganOfffffffffffffffftplaster,elevation, of the completion of terraces with waterproofing Fittings and Equipment as per cFo Noc, Electrical f]tt'lt1-Ti11t"1 ilil;;;,-;Lpr'. n." to conditions of environment/cRz NoC.Finishingtoentrancetobby/s.plinthprotection, Compound paving of areas appurtenant to Building/Wing' may be required to Wall and all other requirements as complete project as per specifications in agreement of Sale. AnY other activities' for each HOUSE NO 07 TO 12 (To be prePared seParatelY Layout Buitding Wing Number ROW / Layout building/Wing of Thq 1o F"r."n-t"g" of Actual Work Done (As on date of this Certificate) Basement's (if anY) Podiums (if anY) Slabs of SuPer Structure ' l) doors and windows within Flats/Premises i ies at each Floor level Overhead.ndUn@ laster' elevation' of the completion of terraces with waterproofing ting Fittings and Equipment as per cFo Noc, Ele.ctrical tltli19.lT:111t1 compliance to conditions of environment/CRZ "qripr"nt, NoC.Finishing,toentrancelobby/s.plinthprotection, Compound paving of areas appurtenant to Building/Wing' may be required to Wall and all other requirements as in agreement of complete project as per specifications SA]TAD A.K. LODHtr cA/051370$4 (To be prepared separately for each Layout / Building Wing Number ROW HOUSE NO 13 TO 18 Lavout buildi ine of The Proj Tasks / ActivitY Percentage of Actual Work Z Sr Done No (2) (As on date of this (1) Certificate) (3) Excavation LOO% L. 2. Basement's (if anY) 3. Podiums (if anY) 4. Plinth too% Stilt Floor o% 5. 6. Slabs of SuPer Structure LO)% 7. Irt""rrl *.lls, lnternal Plaster, Floorings, l) dogrs and 95% rrrindnrrr< ruif hin Flats/Premises 8 Sanitary Fittings within the Flat/Premises 7s% 9 StaircasesJifts' \ruells and Lobbies at each Floor level 9s% rlrrorho:d and I lndprsrottnd Water Tanks 10 External plumbing and external plaster, elevation, 70% completion of terraces with waterproofing of the Building/wing. tt lrttrllat'r. "f L',ftt. water pumps, Fire Fitting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing' Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. (To be prepared separately for each Layout / Building Wing Number ROW HOUSE NO 19 TO 24 t hr rildi of The Pro Tasks / Activity Percentage of Actual Work Sr Done No (2) (As on date of this (1) Certificate) (3) Excavation LO0% 1.. 2. Basem6t" (tf any) 3. Podiums (if anY) 4. Plinth L00% 5. Stilt Floor Slabs of SuPer Structure LO)% 6. 7. l"tettt.l ,rrllt Internal Plaster, Floorings, l) doors and 9s% rrrindnrrrc ruithin Flats/Premises Sanitarv Fittines within the Flat/Premises 75% 8 9 Staircases. lifts' Wells and Lobbies at each Floor level 85% orrarhpad and I lndersround Water Tanks External plumbing and external plaster, elevation, 70% 10 lnk"! completion of terraces with waterproofing of the Building/wing. tt lnstallation of Lifts, water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number HAPPY APARTMENT (To be prepared separately for each Layout buildine/Wine of The Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) L. Excavation o% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and 0% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 1.1 lnstallation of Lifts. water pumps, Fire Fitting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. SAJJAD A.K. LODI{T cAlosl3Tos4 TABtE.B Areas (lnternal and External Development Works) ln respect of the Registered Number Sr Common areas and facilities Proposed Percentage Details No (Yes/lIo) of Actual (1) l2l (3) Work (s) Done (As on date of the Certificate) (4) 1,. lnternal Roads & Footpaths NO 2. Water Supply YES 0 3. Sewerage (Chamber, lines, Septic Tank, STp). YES 0 4. Storm Water Drains NO 5. Landscaping & Tree planting YES 0 6. Street Lighting NO 7. Community Buildings NO 8 Treatment and disposal of sewage and sullage water. NO 9 Solid Waste management & Disposal NO 10 Water conservation / Rain water harvesting YES 0 11. Energy management. NO 1,2 fire protection and lire Safety requirements YES 13 Electrical meter room, sub-station, receiving station. NO 1,4 Lifts YES 0 Yours Faithfully, \ ----\----- Signature & Name (tN BLOCK LETTERS) of L.S/ Architect (License No. .............) SAJIAD A.K. LODHI cAl0sl37094 Agreed and Accepted by: GayatriAshok Mule Name: Date: