DHI SAJJAD ARcHTTEcT FORM { [See Regulation 3l ARCHITECT'S CERTIFICATE of Money from (To be submitted at the time of Registration of ongoing Project and for withdrawal Designated Account) DATE: 31-12-2024 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad - 431 001. subject: certificate of Percentage of completion of construction work of Happy Homes having MahaRERA Registration Number P51500051755 being developed by GayatriAshok Mule' Sir, t/ We Sajjad A.K Lodhi have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of Completion of Construction Work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes' Real Estate Project I certify Based on site inspection with respect to Layout / each of the aforesaid that as on the date of this certificate, the Percentage of Work done for each of the building/wing of of the Work the Real Estate project under MahaRERA is as per Table A herein below. Percentage executed with respect to each of the activity of the entire phase is detailed in Table B .1 TABLE.A ]i. Layout / Auilding Wing Number ROW HOUSE NO 01 TO 06 (To be prepared separately for each rut buildi of The t Tasks / Rctivity Percentage of Actual Work Sr (2) Done No (As on date of this (1) Certificate) (3) 1. Excavation 700% 2. Basement's (if anY) 3. Podiums (if any) Plinth 1,OO% 4. 5. stilt Floor Slabs of Super Structure LOO% 6. 7. tnt.t*t *.lls, Internhl Plaster, Floorings, l) doors and 80% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o%. SAJJAD A.K. LODHI cA/0s/37094 Mobile: +91 9960507664 2nd floor, Above Chintamani Sweets, E-mail : architectsajjadlodhi@yahoo'co'in Near Police Commissioner Office, architectsajjadlod hi 1 23@gmail'com Mill Corner signal, Chh. Sambhajinagar (Aurangabad) at eJch Floor level I Orerf,"aO an E-t"t*rplrrnbrgand-externalplaster'elevation' of the completion of terraces with waterproofing tings and Equipment as per cFo Noc, Electrical'ltli9,i:T::1[t-1 il;ffi ili,."[ o'o "t" to conditions of environment/cRZ plinth protection, NoC. Finishing to entrance tobby/s. Compound paving of areas appurtenant to Building/Wing' Wallandallotherrequirementsasmayberequiredtoof completeproject specifications in agreement "-i"' Sale. AnY other activities' ROW HOUSE NO 07 TO t2 (To be prepared separately for each Layout / guilding Wing Number Lavout building/Wine of The Project) P"t.""trg" of Actual Work Tasks / Activity Done (2) (As on date of this Certificate) Excavation Bisement's (if anY) PoOirms (if anY) Slabs of SuPer Structure gs' l) doors and lnternal walls, lnterr windows within Flatstlgrntsg: i s at each Floor level OverfteaO an aster' elevation' External Plumbing anc of the completion of terraces with waterproofing Building/win& ng Fittings and Equipment as per cFo Noc, Electrical-tltl'19.l-:T::?[tg ililil,:;l oro.." to conditions of envi ronment/cRZ plinth protection' NOC. Finishing to entrance lobby/s' Compound paving of areas appurtenant to Building/Wine' Wallandallotherrequirementsasmayberequiredtoof completeproject ,'-i"' specifications in agreement Sale. AnY other activities' + SA IAD A.K. LODHI Layout / Building Wing Number ROW HOUSE NO 13 TO 18 (To be prepared separately for each Layout buildinglWing of The project) Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 1. Excavation LO0% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth LOO% 5. Stilt Floor o% 6. Slabs of Super Structure 80% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and s5% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases, lifts' Wells and Lobbies at each Floor level 75% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 11 lnstallation of Lifts. water pumps, Fire Fitting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout /Building Wing Number ROW HOUSE NO 19 TO 24 (To be prepared separately for each a building/Wi of The Pro Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) t. Excavation L00% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 700% 5. Stilt Floor 6. Slabs of Super Structure 60% 7. lnternal walls,. lnternal. Plaster, Floorings, l) doors and 2s% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% SATTAD A.K. LODHI eA/05/37094 completion of terraces with waterproofing of the Buildine/wine. LT lnstallation of Lifts, water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC" Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number HAPPY APARTMENT (To be prepared separately for each Layout build ofThe Proi trLt Sr Tasks / Activity Percentage of Actual Work Done No l2l (1) (As on date of this Certificate) (3) L. Excavation o% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor 0% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks L0 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 1.L lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. SAIIAD A'K. LODHI cA/05/37094 7 ;t , TABLE-B Common Areas (lnternal and External Development Works) tn respect of the Registered Pro Number Sr Common areas and facilities Proposed Percentage Details No (Yes/wo) of Actual (1) (3) Work l2l (s) Done (As on date of the Certificate) (4) L. lnternal Roads & Footpaths NO 2. Water Supply YES 0 3. Sewerage (Chamber, lines, Septic Tank, STp). YES 0 4. Storm Water Drains NO 5. Landscaping & Tree Planting YES 0 6. Street Lighting NO 7. Community Buildings NO B Treatment and disposal of sewage and sullage water. NO 9 Solid Waste management & Disposal NO 10 Water conservation / Rain water harvesting YES 0 1,L Energy management. NO 12 fire protection and lire Safety requirements YES 13 Electrical meter room, sub-station, receiving station. NO L4 Lifts YES 0 Yours Faithfully, Signature & Name (lN BLOCK LETTERS) of L.S/ Architect (License No. .............) SAJIAD A.K, LODHI cAl05137094 Agreed and Accepted by: GayatriAshok Mule Name: Date: