DHI SAJJAD ARCHITECT FORM 1 [see Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE: 30-09-2024 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad -431001. Subject: Certificate of Percentage of Completion of Construction Work of Happy Homes having MahaRERA Registration Number P51500051755 being developed by Gayatri Ashok Mule. Sir, l/ We Sajjad A.K Lodhi have undertaken assignment as Architect llicensed Surveyor of certifying Percentage of Completion of Construction Work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes. Based on Site inspection with respect to Layout / each of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. Percentage o.f, tle woak executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A ,l t '' Layout / Building Wing Number ROW HOUSE NO 01 TO 06 (To be prepared separately for each Layout build of The Sr Tasks / Activity Percentage of Actual Work No (21 Done (1) (As on date of this Certificate) (3) L. Excavation 100% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 1.00% 5. Stilt Floor 6. Slabs of Super Structure too% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and 6s% windows within Flats/Premises B Sanitary Fittings within the Flat/Premises 0% SAIJAD A,K. LODHI cA/os/37094 2nd floor, Above Chintamani Sweets, Mobile: +91 9960507664 rt^^- Daliaa /1^mmiocianar fiffina E-mail : architectsaijadlodhi@yahoo.co.in 9 Staircases. lifts' Wells and Lobbies at each Floor level 95% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 7 completion of terraces with waterproofing of the o% Building/wing. 1,1 lnstallation of Lifts, Water pumps, Fire Fitting Fittihgs and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 07 TO t2 (To be prepared separately for each building/Wi of The Proiec Sr Tasks / Activity Percentage of Actual Work No (21 Done (1) (As on date of this Certificate) (3) L, Excavation 100% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 1.OO% 5. Stilt Floor 6. Slabs of Super Structure too% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and 65% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 9s% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. 1,1 lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to, entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. ' SAJJAfrK. LODHI cAla5l37094 Layout / Building wing Number Row HousE No 13 To 18 (To be prepared separately for each ut buildi ing of The ) Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 1,. Excavation L00% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth LO0% 5. Stilt Floor o% 6. Slabs of Super Structure 70% 7. lnternal walls, lnternal plaster, Floorings, l) doors and 40% windows within Flats/Premises 8 Sanitary Fittings within the Flat/premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 70% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 1,L lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 19 TO 24 (To be prepared separately for each buildi ofThe Project) Sr Tasks / Activity Percentage of Actual Work No tzl Done (1) (As on date of this Certificate) (3) t. Excavation 1.OO% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth L00% 5. Stilt Floor 6. Slabs of Super Structure 3s% 7. lnternal walls, lnternal Plaster, Floorings, l) doors aM o% windows within Flats/Premises B Sanitary Fittings within the Flat/Premises 0% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% SAJTAD A.K. LODHI cA|05137094 completion of terraces with@ Building/wine. lnstallation of Lifts, water pu@ Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirement, ,, ,ry be required to complete project as per specification, in .gr""rent of Sale. Any other activities. N-umber HAppy A,ARTMENT (ro be prepared i:],:y:i,:,ylY:*_y,iq separatety for each Layout Tasks / Activity Percentage of Actual Work (21 Done (As on date of this Certificate) Basement's (if any) Podiums (if any) Stilt Floor Slabs of Super Structure lnternal walls, lnternal elasteffi windows within Flats/premises Sanitary Fittings within ttre ftaVFremises Staircases. tifts' Weil Overhead and Underground Water Tanks Externa I p um b ing a nd externa t pGste,; I Ef eratiorL completion of terraces with waterproofing of the lnstallation of Lifts. water pr,.np@ Equipment as per cFo Noc, Erectricar fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be requiied to complete project as per specifications in agreement of Sale. Any other activities. --' SAJIAD A.K. LODHI cAl0s/370e4 TABLE-B Common Areas (lnternal and External Development ,/ Works) tn respect of the Registered Phe rse Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (21 (3) Work (s) Done (As on date of the Certificate) (4) 1,. rnrernat Koaos & l-ootpaths NO 2. water supply YES 0 3. YES 0 4. Storm Water Drains NO 5. Lirnqscaptng & tree planting YES 0 6" rrreer Lrgnltng NO 7" Community Buildings - NO 8 r ano otsposat of sewage and sullage water. NO 9 rouq vvasre management & Disposal NO 10 Waterconserraffi - -'- ---"'o YES 0 t1 Energy management. NO 12 fireprotectionaffi YES 13 rcat merer room, sub_station, receivins station NO 1,4 Lifts YES 0 - Yours Faithfully, - \- Signature & Name (tN BLOCK LETTERS) of L.S/ Architect (License No. .............) SAIIAD A.K. LODHI cA/os/37094 Agreed and Accepted by: GayatriAshok Mule Name: Date: