DHI SAJJAD ARc FORM 1 [See Regulation 3l ARC HITECT'S CERTTFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account) DATE: 30-06-2024 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad - 431 001. subject: certificate of Percentage of completion of construction work of Happy Homes having MahaRERA Registration Number P51500051755 being developed by GayatriAshok Mule. Sir, l/ We Sajjad A.K Lodhi have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes. Based on site inspection with respect to Layout / each of the aforesaid Real Estate project I certifiT that as on the date of this certificate, the Percentage of work done for each of the building/wing of the Real Estate Project under MahaRERA is as per Table A herein below. percentage of executedwithrespecttoeachoftheactivityoftheentirephaseisdetailedinTabneB1, ''ttre ] ' work ''- TABTE-A : ,: 1, / Layout Building wing Number Row HousE No 01 To 06 (To be prepared separately for each ut building/Wing of The project Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 1. Excavation 1,00% 2. Basement's (if any) 3. Podiums (if ahV) , 4. Plinth 1,OO% 5. Stilt Floor 6. )lat)s oT 5uper 5tructure 1,00% 7. -rnrernat walls, lnternal plaster, Floorings, l) doors and 20% windows within Flats/premises )antrary Fttttngs within the Flat/premises 8 o% t' - SAJJAD A.K. TODHI cA/0s/370s4 2nd floor, Above Chintamani Sweets, Mobile:+91 9960507664 Near Police Commissioner Office, E-mail : architectsajjadlodhi@yahoo.co. in Mill Corner sional. Chh. Sambhaiinaoar (Auranoahactl 9 Staircases. lifts' Wells and Lobbie, ,t-Er.t-fto* t"*t 9Oo/o Overhead and Underground Water Tanks 10 External plumbing and externat ptastEi etevation, o% completion of terraces with waterproofing of the Building/wing. 1,1 lnstallation of Lifts, Water pumps, F@ o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 07 TO 12 (To be prepared separately for each Layout building/Wing of The project) Sr Tasks / Rctivity Percentage of Actual Work No ll2l Done (1) (As on date of this Certificate) T Excavation 1.00% (3) 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 1.00% 5. Stilt Floor 6. Slabs of Super Structure 1,00% 7. lnternal walls, lnternal plaster, Floorings, t) doori and 20% windows within Flats/premises 8 Sanitary Fittings within the Flat/premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 8s% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 1,1 lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to. entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. . SAIIAD A.K. LODHI 'cA/os/37}94 Layout / Building Wing Number ROW HOUSE NO 13 TO 18 (To be prepared separately for each Layout buildi /wtn of The Sr Tasks / Rctivity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) t. Excavation 10a% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth LOO% 5. Stilt Floor o% 6. Slabs of Super Structure 55% 7. lnternal walls, lnternal Plaster, Floorings, l) dobrs and LO% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 50% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. TL lnstallation of Lifts. water pumps, Fire Fitting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 19 TO 24 (To be prepared separately for each Layout build ng of The trLt Sr Tasks / Activity Percentage of Actual Work No (21 Done (1) (As on date of this Certificate) (3) 1. Excavation LOO% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 45% 5. Stilt Floor 6. Slabs of Super Structure LO% 7. lnternal walls, lnternal. Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% SAJJAD n.(, t donr cAl05l370s4 completionof- ,r with waterproofing Buildinp/wino of thE lnstallation of l:I::::: equipment, i,^ l:,:i" rvoi, compliance Ja,,., iri*,r,, mecha er to condition, J;:;;;;ffffi1 n ica I NOC. Finishing to e_:trance "f pfinth protection, loOOVZs. paving of areas appurtenant to Buildingi;ing. Compound Wall and all other r comprete r.,"o,, TJJ':[#ffi"['rr t:rH;[i :? Sale. Any other activities. Layout / Building Wing Number HAPPY APARTMENT buildi (To be prepared separately ofThe project) for each Layout Percentage ofnffi yyoa Done (As on date of this Certificate) Basement's (if any) Podiums (if any) StaUs otSupErStruauE lnternal *.t windows within Flats/premises sanitaryrittin@ Staircases. litt 9yerhead.and Underground Water Tanks ExternalpturO completion of terraces with waterproofiniof tf.,e Buildins/wino lnstallation of Noc Ereciri.ririt,i,sr, mechanicar :::fl::: equipment, 11per,lFo compliance to condition, NOC. Finishing to entrance ;;:;;;;ilIffi1 lobby/s."f plinth protection, paving of areas appurtenant to Buiidingi;ing. Compound Wall and all other requiremen" complete project as per ., ,'rV be required to specification, in ,gru"rent Sale. Any other activities. of L SAIJAD A.K, LODHI c4105137094 TABTE-B Common Areas (lnternal and External Development Works) in respect of Registered Number Sr Common areas and facilities Proposed Percentage Details No (Yes/wo) of Actual (1) (21 (3) Work (s) Done (As on date of the Certificate) (4) 1.. lnternal Roads & Footpaths NO 2. Water Supply YES 0 3. Sewerage (Chamber, lines, Septic Tank, STP). YES 0 4. Storm Water Drains NO 5. Landscaping & Tree Planting YES 0 6. Street Lighting NO 7. Community Buildings NO 8 Treatment and disposal of sewage and sullage water. NO 9 Solid Waste management & Disposal NO 10 Water conservation / Rain water harvesting YES 0 1,L Energy management. NO 12 fire protection and lire Safety requirements YES 13 Electrical meter room, sub-station, receiving station. NO L4 Lifts YES 0 Yours Faithfully, \ Signature & Name (lN BLOCK LETTERS) of L.S/ Architect (License No. .............) SAIIAD A.K. LODHI cA/os/37094 Agreed and Accepted by: GayatriAshok Mule Name: Date: