[See Regulation 3l ARC HITECT'S CERTIFICATE Money from (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Designated Account) DATE: 31-03-2024 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad -431001. Subject: certificate of Percentage of completion of construction work of Happy Homes having Mule. MahaRERA Registration Number P51500051755 being developed by GayatriAshok Sir, as Architect /Licensed Surveyor of certifying U We Sajjad A.K Lodhi have undertaken assignment percentage of Completion of Construction Work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes' Based on Site inspection with respect to Layout / each of the aforesaid Real Estate Project I certifli building/Wing of that as on the date of this certificate, the Percentage of Work done for each of the the Real Estate project under MahaRERA is as per Table A herein below. Percentage of lhe {cirk in table B executed with respect to each of the activity of the entire phase is detailed TABLE-A Layout / Building wing Number Row HousE No 01 To 06 (To be prepared separately for each Lavot rt buildine/Wine of The Proiect Tasks / Rctivity Percentage of Actual Work Sr (2) Done l ,No 1l (As on date of this I r. (1) Certificate) (3) 1. Excavation 100% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth LOO% 5. Stilt Floor 6. StrUt of Super Structure 60% 7. lnte*rl walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% SAIJAD--' A.K; LODHI cA1*5137A94 Mobile : +91 996050766 2nd floor, Above Chintamani Sweets, E-mail : architectsaiiadlodhi@yahoo'co'i Lr^^- n^ti^^ iammiccinnar Officc 9 Staircases. lifts' Wells and Lobbies at each Floor level 45% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, a% completion of terraces with waterproofing of the 7 Building/wing. 1,1 lnstallation of Lifts. water pumps, Fire Fitting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 07 TO t2 (To be prepared separately for each Layout of The Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 1,. Excavation too% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 100% 5. Stilt Floor 6. Slabs of Super Structure 60% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 4s% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 11 lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all othei requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. --\ SATJAD A,K. LODHI cAl05l37a94 / Layout Building wing Number Row HousE No 13 To 18 (To be prepared separately Layout building/Wing of The project) for each Tasks / Activity Percentage of Actuat Work (21 Done (As on date of this Certificate) Excavation Basement's (if any) Podiums (if any) Slabs of Super Structure lnternal walls, lnternal elasteffi windows with in Flats/premises lgl,tlry Fittings within tfre Hat/Rrem[es Staircases. lifts'Wells anO ionffi Overhead and Underground Water Tanks External plumbing and externat ptaste., efevatiort completion of terraces with waterproofing of the Buildine/wine. lnstallation of Lifts. water prrp@ Equipment as per cFo Noc, Erectrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building wing Number Row HousE No 19 To 24 (To be prepared separately for each Layout building/Wing of The project) Tasks / Activity Percentage of Actual Work l2l Done (As on date of this Certificate) Basement's (if any) Podiums (if any) Slabs of Super Structure lnternal walls, lnternal elasteffi windows with in .Flats/prernises Sanitary Fittings within the flat/pl.smises Staircases. lifts' Wells , Overhead and Underground Water Tanks Exte rna I pl u m bing a nd externa t ptaste rJGvatio r,, sAJTAD a.[.-ioour cqla5fi7C94 completion of terraces with waterproofing of the Building/wing. TL lnstallation of Lifts, water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number HAPPY APARTMENT (To be prepared separately for each Layo ut building/Wing of The Project) Sr Tasks / Raivity Percentage of Actual Work No t2l Done (1) (As on date of this Certificate) (3) 7. Excavation 0% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases. lifts' Wells and Lobbies at each Floor level 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. t1 Installation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. $AIIAD A,K. LODHX CA/0trt;1tr14 TABI.E-B Areas (lnternal and External Development Works) tn respect the Registered Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (21 (3) Work (s) Done (As on date of the Certificate) (41 1,. nudus 6( rootpatnS NO 2. Water Supply YES 0 3. (prarorroo /aL \vr rqilil..rEt, ililes, )epuc I anK, 5 rp). YES 0 4. Slnrm \A/ NO 5. Landscaping & Tree etrnffi YES 0 6. Street Lighting NO 7. communityguildffi NO 8 Treatment and dis NO 9 solidwastemanageffi NO 10 Water conseruati YES 0 7t L2 - trre protection and lire Safety r.equirements- NO YES 13 Electrical meter r NO t4 Lifts YES 0 - Yours Faithfully, Signature & Name (tN BLOCK LETTERS) of L.S/ Architect (License No. .............) SAJJAD A.K. LODHI cA/0s/37094 Agreed and Accepted by: GayatriAshok Mule Name: Date: