DHI SAJJAD ARCHITECT FORM { [See Regulation 3l ARC HITECT'S CERTIFICATE (To be submitted at the time of Registration of and for withdrawal of Money from [:tf[#,i]ect DATE: 31-12-2023 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad -431001. Subject: Certificate of Percentage of Completion of Construction Work of Happy Homes having MahaRERA Registration Number P51500051755 being developed by GayatriAshok Mule. Sir, t/ We Sajjad A.K Lodhi have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes. Based on Site inspection with respect to Layout / each of the aforesaid Real Estate Project I certifli that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. Percentage.of,the Vuork executed with respect to each of the activity of the entire phase is detailed in T-able B TABLE-A Layout / guilding Wing Number ROW HOUSE NO 01 TO 06 (To be prepared separately for each Layout building/Wing of The Pro Sr Tasks / ectivity Percentage of Actual Work Done .No l2l (As on date of this (1) Certificate) (31 1,. Excavation 1.00% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 700% 5. Stilt Floor 5. Slabs of Super Structure 3s% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Prem ises 8 Sanitary Fittings within the Flat/Premises o% . SAJJAD A.K. IODHI cAl0sfi7A94 2nd floor, Above Chintamani Sweets, Near Police Commissioner Office, E-mai r : a,.cn ite#??Xi';lfl reii,f,l"t313i Mill Corner signal, Chh. Sambhajinagar (Aurangabad) architectsajjadlodhi 1 23@gmail.cor ffibbies at each Floor level Overhead and Undergrounq]ryqlglfenlr E-ternal plr.rmb',"g and external plaster, elevation' completion of terraces with waterproofing of the l"ttrllrti,r" Litts. wrt"r pumps, Fire Fitting Fittings and "f Equipment as per CFO NOC, Electrical fittings' mechanical equipment, compliance to conditions of environmentlCRZ NOC. Finishing to entrance lobby/s' plinth protection' paving of areas appurtenant to Building/Wing' Compound to Wall and all other requirements as may be required of complete project as per specifications in agreement Sale. AnY other activities. NO 07 TO L2 (To be prepared separately for each Layout / Building wing Number Row HousE iercentage of Actual Work Tasks / ActivitY Done (2) (As on date of this Certificate) Basement's (if anY) Podiums (if anY) Slabs of SuPer Structure lnternal walls, lnternrt pt.tt"iFloorings' l) doors and windows within Flats/Premises yrnitary fittings within the Flat/lretn't9: bies at each Floor level Overhead a nd U ndergroqlqlryglelf{ks E-t"*.1 plr.*brg and external plaster, elevation' completion of terraces with waterproofing of the lt sGllat',on of L'ftat,.t"t p,'"p", Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings' mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing do entrance lobby/s' plinth protection' paving of areas appurtenant to Building/Wing' Compound Wallandallotherrequirementsasmayberequiredto of complete project as per specifications in agreement Sale. AnY othe.r activities. SA]IAD A.K. LODHI - cA/os 137A94 Layout / Building Wing Number ROW HOUSE NO 13 TO 18 (To be prepared separately for each ut build ofThe Project Sr Tasks / Activity Percentage of Actua! Work No (21 Done (1) (As on date of this Certificate) (3) L. Excavation 20% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 5. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. 1T lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 19 TO 24 (To be prepared separately for each buildi ing of The trLt, Sr Tasks / ectivity Percentage of Actual Work No (21 Done (1) (As on date of this Certificate) (3) 1. Excavation 20% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structure 0% 7. lnternal walls,. lnternal' Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% \ SAJIAD A'(. LODHI cAl0sl37a94 completion of terraces with@ Buildine/wine. lnstallation of Lifts, water num@ Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compriance to conditions of environment/cRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specification, in .gr""rent of Sale. Any other activities. Layout / Building wing Number HAppy A,ARTMENT (To be prepared separately building/Wing of The project) for each Layout Tasks / Activity Percentage of Actual Work Done (As on date of this Certificate) Basement's (if any) Podiums (if any) Slabs of Super Structure lnternal *alls, lntet windows within Flats/premises lgl,ulv Fittings within tfre rtat/premEes Staircases. titts' W Overhead and Underground Water Tanks Externalplumbing uno @ completion of terraces with waterproofing of the lnstallation of Lifts. waterpum@ Equipment as per CFO NOC, Etectrical fittings, mechanical equipment, compliance to conditions of environment/cRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be requiied to complete project as per specification, in ,gr""rent of Sale. Any other activities. SAJJAD A.K. LODHI cA/05/37094 TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (3) Work (s) l2l Done (As on date of the Certificate) (4) t. lnternal Roads & Footpaths NO 2. Water Supply YES 0 3. Sewerage (Chamber, lines, Septic Tank, STP). YES 0 4. Storm Water Drains NO 5. Landscaping & Tree Planting YES 0 6. Street Lighting NO 7. Community Buildings NO B Treatment and disposal of sewage and sullage water. NO 9 Solid Waste management & Disposal NO 10 Water conservation / Rain water harvesting YES 0 LL Energy management. NO L2 fire protection and lire Safety requirements YES 13 Electrical meter room, sub-station, receiving station. NO 1,4 Lifts YES 0 Yours Faithfully, Signature & Name (lN BLOCK LETTERS) of L.S/ Architect (License No. .............) SA]IAD A.K. LODHS cA/os137094 Agreed and Accepted by: GayatriAshok Mule Name: Date: