DHI SAJJAD ARcHTTEcT FORM 1 [See Regulation 3l ARGHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE: 30-09-2023 To, GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalan Nagar, Aurangabad -431001. Subject: Certificate of Percentage of Completion of Construction Work of Happy Homes having MahaRERA Registration Number P51500051755 being developed by Gayatri Ashok Mule. Sir, l/ We Sajjad A.K Lodhi have undertaken assignment as Architect /Licensed Surveyor of certifying percentage of Completion of Construction Work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes. Based on Site inspection with respect to Layout / each of the aforesaid Real Estate Project I certifli that as on the date of this certificate, the Percentage of Work done for each of the building/Wj1g.of the Real Estate Project under MahaRERA is as per Table A herein below. Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE-A ii Layout / Building Wing Number ROW HOUSE NO 01 TO 06 (To be prepared separately for each Layout bui ofThe Projecl Sr Tasks / Activity Percentage of Actual Work (2) Done No (As on date of this (1) Certificate) (3) 1. Excavation 1,OO% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 20% 5. Stilt Floor 6. Slabs of Super Structure L0% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% \ SAJJAD A.K. LODHI cA/0s137094 Mobile: +91 996050766 2nd floor, Above Chintamani Sweets, E-mail : architectsajjadodhi@yahoo'co'i Near Police Commissioner Office, architectsajjadlodhi 1 23@gmail'cor Q^,-i-.l-!aiinonar /-Arrrannahad\ ch Floor levei Tanks Overhead and Underground Water I aster' elevation' I of the completion of terraces with waterproofing Fitting Fittings and Equipment as per cFo NoC, Electrical tltl'l*,i,^T:111t1 ilffi;;;,;[or'.n." to conditions of environment/cRz NoC.Finishingtoentrancetobby/s.plinthprotection, Compound paving of areas appurtenant to Building/Wing' may be required to Wall and all other requirements as of complete project as per specifications in agreement Sale. AnY other activities' prePared seParatelY for each ROW HOUSE NO 07 TO 12 (To be Layout / Building Wing Number Layout building/Wing of The Proj P"r*rt"g" Actual Work "f Done (As on date of this Certificate) Basement's (if anY) Podiums (if anY) Slabs of SuPer Structure lnternal walls, lntern;l Tla;A Floorings' l) doors and wi ndows with i n Flqlrern5gg Sr.'t*y F'itt'*gt *ith lth" IEVI"''t9: i s'Wellsand Cuui"t ,t ach Floor level ttttttttttttttttt"t.lift Overhead and Underground Water Tafu E-t"t.al plr*brg and external plaster' elevation' of the completion of terraces with waterproofing Building/win ting Fittings and iquipr"nt as per CFO NOC, Electrical fittings' '::1i?:t"1 compliance to conditions of environment/CRZ "quiprn"nt, plinth protection' NOC. Finishing to entrance lobby/s' Compound paving of areas appurtenant to Building/Wing' Wallandallotherrequirementsasmayberequiredtoof in agreement complete project as per specifications Sale. AnY oth'er activities' SATTAD CA/( Layout / Building Wing Number ROW HOUSE NO 13 TO 18 (To be prepared separately for each !q19ut building/Wing of The Sr Tasks / Activity Percentage of Actual Work No (21 Done (1) (As on date of this Certificate) T Excavation o% (3) 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor 0% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal plaster, Floorings, t) doors and o% windows within Flats/premises 8 Sanitary Fittings within the Flat/premises o% 9 Staircases, lifts' Wells and Lobbies at each Floor level o% Overhead and Vnderground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. 1,L lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 19 TO 24 (To be prepared separately for each t building/Wing of The project) Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 7. Excavation o% 2. Basement's (if any) 3. Podiums (if any) 4. PIinth o% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls,.lnternal'plaster, Floorings, l) doors and o% windows within Flats/fremises 8 Sanitary Fittings within the Flat/premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor levei o% Overhead and Ulderground Water Tanks 10 External plumbing and external plaster, elevation, o% SAJJAD A. Floorlr cA/05137094 completion of terraces with waterproofing of the Building/wing. t7 lnstallation of Lifts, water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number HAPPY APARTMENT (To be prepared separately for each Layout buildin of The Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 1,. Excavation o% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and 0% windows within Flats/Premises B Sanitary Fittings within the Flat/Premises 0% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. LL lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. SAJJAD A,K. LODHT cAlasfi7094 TABTE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (3) Work (s) l2l Done (As on date of the Certificate) (4) L. lnternal Roads & Footpaths NO 2. Water Supply YES 0 3. Sewerage (Chamber, lines, Septic Tank, STP). YES 0 4. Storm Water Drains NO 5. Landscaping & Tree Planting YES 0 6. Street Lighting NO 7. Community Buildings NO 8 Treatment and disposal of sewage and sullage water. NO 9 Solid Waste management & Disposal NO L0 Water conservation / Rain water harvesting YES 0 1,1, Energy management. NO 1.2 fire protection and lire Safety requirements YES 13 Electrical meter room, sub-station, receiving station. NO 1,4 Lifts YES 0 Yours Faithfully, Signature & Name (lN BLOCK LETTERS) of L.S/ Architect (License No. .............) L SAJJAD A.K. LODHI cA/0s137094 Agreed and Accepted Qv, GayatriAshok Mule Name: Date: