DHI SAJJAD ARc FORM 1 [See Regulation 3l ARCHITECT'S GERTIFICATE (To be submitted at the time of Registration of ongoing project ror. withdrawal of Money from Designated Account) "ro To, DATE: 30-06-2023 GayatriAshok Mule Flat No.9, Samta Darshan, Samta Nagar, Jalna Nagar, Aurangabad - 431001. subiect: certificate of Percentage of completion of construction work of Happy Homes having MahaRERA Registration Number P51500051755 being developed by GayatriAshok Mule. Sir, l/ we sajjad A'K Lodhi have undertaken assignment as Architect /Licensed surveyor of certifying Percentage of completion of construction work of having MahaRERA Registration Number P51500051755 being developed by Happy Homes. Based on site inspection with respect to Layout / each of the aforesaid Real Estate project that as on the date of this certificate, the Percentage I certify of work done for each of the building/wing the Real Estate Project under MahaRERA is as per of Table A herein below. percentage of the executed with respect to each of the activity of the entire phase is aetaieJ i" iuli"'i' , , -" trvork TABTE-A 1I ] ] Layout / Building Wing Number ROW HOUSE NO 01 TO 05 (To be prepared Layout buildi separately for each ofThe Project) Tasks / Activity Percentage of Actual Work {21 Done (As on date of this Certificate) Excavation Basement's (if any) Podiums (if any) Plinth Slabs of Super Structure lnternal walls, lnternat windows within Flats/premises SAJJAD A.K. LODHX al0sfi7As4 2nd floor, Above Chintamani Sweets, Near Police Commissioner Office. 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. LL lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / guilding Wing Number ROW HOUSE NO 07 TO t2 (To be prepared separately for each Layout build ns of The ) Sr Tasks / ectivity Percentage of Actual Work Done No l2l (As on date of this (1) Certificate) (3) L. Excavation 50% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth 20% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. tt lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. SmraofK. LoDHr cA/05/37094 Layout / Building Wing Number ROW HOUSE NO 13 TO 18 (To be prepared separately for each Lavout bui ofThe Proi Sr Tasks / Activity Percentage of Actual Work No (2) Done (1) (As on date of this Certificate) (3) L. Excavation o% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% completion of terraces with waterproofing of the Building/wing. tl lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number ROW HOUSE NO 19 TO 24 (To be prepared separately for each buildine/Wine of The ect Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) L. Excavation o% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structufe o% 7. lnternal walls, lnternal Plaster, Floorings, l) doors and o% windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level o% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, o% SAJJAD A.re Lbonr completion of terraces with waterproofing of the Building/wing. 11. lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Layout / Building Wing Number HAPPY APARTMENT (To be prepared separately for each Layout building/Wing of The proiect) Project Sr Tasks / Activity Percentage of Actual Work No l2l Done (1) (As on date of this Certificate) (3) 1,. Excavation 0% 2. Basement's (if any) 3. Podiums (if any) 4. Plinth o% 5. Stilt Floor o% 6. Slabs of Super Structure o% 7. lnternal walls, lnternal plaster, Floorings, t) doors anO o% windows within Flats/premises 8 Sanitary Fittings within the Flat/premises o% 9 Staircases. lifts' Wells and Lobbies at each Floor level 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. tt lnstallation of Lifts. water pumps, Fire Fitting Fittings and o% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. SAI'AD A.K. LODHI cA/os137094 TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Pra Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No) of Actual (1) (3) Work (s) l2l Done (As on date of the Certificate) (4) t. lnternal Roads & Footpaths NO 2. Water Supply YES 0 3. Sewerage (Chamber, lines, Septic Tank, STP). YES 0 4. Storm Water Drains NO 5. Landscaping & Tree Planting YES 0 6. Street Lighting NO 7. Community Buildings NO 8 Treatment and disposal of sewage and sullage water. NO 9 Solid Waste management & Disposal NO 10 water conservation / Rain water harvesting YES 0 LL Energy management. NO 12 fire protection and lire Safety requirements YES t3 Electrical meter room, sub-station, receiving station. NO t4 Lifts YES 0 Yours Faithfully, Signature & Name (lN BLOCK LETTERS) of L.S/ Architect (License Nq .............) \. SAJJAD A,K.ftbHI cA|0s137094 Agreed and Accepted by: GayatriAshok Mule Name: Date: