Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 10-01-2025 To, The Shakti Lifespaces Pvt Ltd (Formally known as Credence Creators Pvt Ltd.). Office no 4, 5 th Floor, ABC East, Beside Prozone Mall, MIDC Chikalthana, Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of <> having MahaRERA Registration Number P51500050787 being Developed by Shakti Lifespaces Pvt Ltd (Formally known as Credence Creators Pvt Ltd.) Sir, I / We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of << Happy Homes Happy Street Wing A >> having MahaRERA Registration Number P51500033289 being Developed by Shakti Lifespaces Pvt Ltd (Formally known as Credence Creators Pvt Ltd.) Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number __ (to be prepared separately for each Layout/Building/Wing of Project) S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% Up to 31st Dec 2024 2. Basements (if any) 100% Up to 31st Dec 2024 3. Podiums (if any) NOT APPLICABLE 4. Plinth 100% Up to 31st Dec 2024 5. Stilt Floor 100% Up to 31st Dec 2024 6. Slab of Super Structure 100% Up to 31st Dec 2024 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 90% Up to 31st Dec 2024 within Flats / Premises 8. Sanitary Fittings within Flats / Premises 80% Up to 31st Dec 2024 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 80% Up to 31st Dec 2024 and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion 80% Up to 31st Dec 2024 of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 75% Up to 31st Dec 2024 Equipment’s as per CFO NOC, Electrical Fittings, Mechanical Equipment’s, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number S. No. Common Areas & Facilities Proposed Percentage of actual Work Done Details (Yes / NO) (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths 100% Up to 31st Dec 2024 2. Water Supply ------ 98% Up to 31st Dec 2024 ------ 3. Sewerage (Chamber, Lines, Septic ------ 80% Up to 31st Dec 2024 ------ Tank, STP) 4. Strom Water Drains ------ NA ------ 5. Landscaping & Tree Planting 10% Up to 31st Dec 2024 ------ 6. Street Lighting ------ NA ------ 7. Community Buildings ------ NA ------ 8. Treatment & Disposal of Sewage and ------ NA ------ Sullage Water 9. Solid Waste Management & Disposal ------ NA ------ 10. Water Conservation / Rain Water ------ 80% Up to 31st Dec 2024 ------ Harvesting 11. Energy Management ------ NA ------ 12. Fire Protection & Fire Safety ------ 05% Up to 31st Dec 2024 ------ requirements 13. Electrical Meter Room, Sub-Station, ------ NA ------ Receiving Station 14. Others (Option to Add more) ------ NA ------ Agreed & Accepted by: Signature of Promoter Name: Chh. Sambhajinagar Date: 10-01-2025