PARMESHWAR GOVIND GAWATI Arch. Antrexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:02-0'1-2025 To, BALAJI INFRA, PLOT NO 2, AMBIKA NAGAR, NEAR JALGAON ROAD, CHHATRAPATI SAMBHAJINAGAR43lOOS Subject: Certificate of Percentage of Completion of Construction Work of SHIV PARK-2having MahaRERA Registration No. P51500051760bein9 developed by BALAJI INFRA Sir, I / WeArch. MT.PARMESHWAR GOVIND GAWALlhave undertaken assignment as Architect i Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SHIV PARK-2 having MahaRERA Registration No. P51500051760bein9 developed by BAL{JI INFRA Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingMing of the Real Estate Project under MahaRERA is as per Table-A1-A9 herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A ForProject Shiv Park - 2 Al Building S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100% a X number of Basement(s) and Plinth J X number of Podiums 4 Stilt Floor 100o/o q 100% X number of Slabs of Super Structure PARMESHWAR GOVIND GAWATI Arch. 6 lnternal walls, lnternal Plaster, Floorings within 100o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100% within the FlaUPremises R Staircases, Lifts Wells and Lobbies at each Floor 100% level connecting Staircases and Lifts, Overhead and Underqround Water Tanks. I The external plumbing and external plaster, 100o/o elevation, completion of terraces with waterproofinq of the Buildi '10 lnstallation of lifts, water pumps, Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment iCRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingA/r'ing, Compound Wall and all other requirements as may be reguired to TABLE.A F Shiv Park - 2 A2 Build S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) 12\ (3) 1 Excavation 100Yo a X number of Basement(s) and Plinth 100o/o ?. X number of Podiums 4 Stilt Floor 40o/o 5 X number of Slabs of Super Structure 0% o lnternal walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlauPremises, Electrical 0% Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor 0o/o level connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, 0o/o elevation, completion of terraces with waterproofing of the Building^/ving PARMESHWAR GOVIND GAWALI Arch. lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fitlings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A F Shiv Park - 2 A3 Buildin D, Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0% 2 X number of Basement(s) and Plinth 3 X number of Podiums 4 Stilt Floor lYo E X number of Slabs of Super Structure ooa 6 lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0% Fittinqs within the FlaUPremises B Staircases, Lifts Wells and Lobbies at each Floor o% level connecting Staircases and Lifts, Overhead and Underqround Water Tanks. o The exte|nal plumbing and external plaster, 00k elevation, completion of terraces with waterproofinq of the Building^lr'ing 10 lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate PARMESHWAR GOVIND GAWALI Arch. TABLE-A F Shiv Park - 2 A4 Build S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0% 2 X number of Basement(s) and Plinth J X number of Podiums 4 Stilt Floor 0o/o 4 X number of Slabs of Super Structure 0% b lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlauPremises, Electrical OYo Fittinqs within the FlaUPremises B Staircases, Lifts Wells and Lobbies at each Floor lYo level connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, lYo elevation, ' completion of terraces with waterproofing of the BuildingANinq 10 lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A ForP Shiv Park - 2 A5 Buildi s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2\ (3) 1 Excavation 0To L X number of Basement(s) and Plinth PARMESHWAR GOVIND GAWALI Arch. 2 X number of Podiums I Stilt Floor 0o/o E X number of Slabs of Super Structure lYo 6 lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0% Fittings within the FlaVPremises Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks I The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing 10 lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A F Shiv Park - 2 AG Buildi s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) I Excavation ook 2 X number of Basement(s) and Plinth J X number of Podiums 4 Stilt Floor 0%o q X number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaVPremises, Electrical 00h Fittinqs within the FlaUPremises B Staircases, Lifts Wells and Lobbies at each Floor 0o/o level connecting Staircases and Lifts, Overhead and Underground Water Tanks- The external plumbing and external plaster, 0% PARMESHWAR GOVIND GAWALI Arch. elevation, completion of terraces with waterproofing of the BuildingMing 10 lnstallation of lifts, water pumps, Fire Fighting 0o/o Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A ForP Shiv Park - 2 Bl Buildi S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100Yo 2 X number of Basement(s) and Plinth 100o/o J X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 19Qo/o b lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of lhe FlaUPrem ises 7 Sanitary Fittings within the FlaVPremises, Electrical 100% Fittinqs within the FlaUPremises B Staircases, Lifts Wells and Lobbies at each Floor 100% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, 100o/o elevation, completion of terraces with waterproofing of the BuildingA/y'ing 10 lnstallation of lifts, water pumps, Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to PARMESHWAR GOVIND GAWALI Arch. Obtain Occu Certificate TABLE-A F Shiv Park - 2 82 Buildi S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) I Excavation 100% 2 X number of Basement(s) and Plinth 100% ? X number of Podiums 4 Stilt Floor E X number of Slabs of Super Structure 100% 6 lnternal walls, lnternal Plaster, Floorings within 100o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100% Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor 100% level connecting Staircases and Lifts, Overhead and Underdround Water Tanks. 9 The external plumbing and external plaster, 1O0o/o elevation, completion of terraces with . waterproofinq of the BuildinqAlVinq '10 lnstallation of lifts, water pumps, Fire Fighting 100o/o Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certiflcate TABLE-A ForProject Shiv Park - 2 83 Building S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate PARMESHWAR GOVIND GAWATI Arch. (1) (21 (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure lOOo/o b lnternal walls, lnternal Plaster, Floorings within 100o/o Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100Yo Fittings within the FlaUPremises o Staircases, Lifts Wells and Lobbies at each Floor 100o/o level connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and external plaster, 1000/ elevation, completion of terraces with waterproofinq of the Building^/ving 10 lnstallation of lifts, water pumps, Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving ofareas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion CetllEqle TABLE-B Common Areas (lnternal & External Development Works) in respect of ForNew Project Shiv Park - 2- A & B Buildings s. Common Areas & Facilities Proposed Percentage Details No. (Yes / of actual NO) Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. lnternal Roads & Footpaths YES 20% Cement Roads 2. Water Supply YES 60% From Bore-well 3. Sewerage (Chamber, Lines, YES 20Yo Drainage Line & Septic Septic Tank, STP) Tank 4. Strom Water Drains NO N.A. E Landscapinq & Tree Planting YES 20o/o As Per Norms 6. Street Lighting YES 20% Skeet Liqht in PARMESHWAR GOVIND GAWALI Arch. theproiect 7. Community Buildings NO N.A. 8. Treatment & Disposal of NO N,A. Sewage and Sullage Water 9. Solid Waste Management & NO N.A. Disposal 10. Water Conservation / Rain YES 00% Rain Water Harvesting Water Harvesting 11. Energy Management NO N.A. 't2. Fire Protection & Fire SafetY NO N.A. requirements 13. Electrical Meter Room, Sub- NO N.A, Station, Receiving Station 14. Aggregate area of recreational YES 00% Open Space Open Space 15. Others (Option to Add more) NO N.A. Yours faithfully, ffiE-) o,"n,o*R*,H# License Number Agreed & Accepted by: W Signature of Promoter Name:BALAJI INFRA f Date:02-01-2025