PARMESHWAR GOVIND GAWALI Arch. Annerure A FORM 1 ISee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale: '12-'10-2024 To, BALAJI INFRA, PLOT NO 2, AMBIKA NAGAR, NEAR JALGAON ROAD, CHHATRAPATI SAMBHAJINAGAR.43lOOS Subject: Certificate of Percentage of Completion of Construction Work of SHIV PARK-2having MahaRERA Registration No. P5150005'l760being developed by BALAJI INFRA Sir, I / WeArch. MT.PARMESHWAR GOVIND GAWALlhave undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SHIV PARK-2 having MahaRERA Registration No. P51500051760bein9 developed by BAL$JI INFRA Based on the Site lnspection, with respect to the Layout / each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Vving of the Real Estate Project under MahaRERA is as per Table-A'l-Ag herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A ForProject Shiv Park - 2 Al Building S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth J X number of Podiums 4 Stilt Floor 100% q 100% X number of Slabs of Super Structure PARMESHWAR GOVIND GAWATI Arch. A lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaVPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100o/o Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor lOOo/o level connecting Staircases and Lifts, Overhead and Underqround Water Tanks. o The external plumbing and external plaster, 100% elevation, completion of terraces with wateroroofinq of the BuildinslVVinq 10 lnstallation of lifts, water pumps, Fire Fighting 100o/o Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A F ShivPark-2A2 S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 100o/o 2 X number of Basement(s) and Plinth 45% 1 X number of Podiums Stilt Floor 20o/o E X number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0o/o Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor 0o/o level connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, 0o/o elevation, completion of terraces with waterproofino of the BuildinqMinq '10 lnstallation of lifts, water pumps, Fire Fiohting 0o/o PARMESHWAR GOVIND GAWATI Arch. Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingA/Ving, Compound Wall and all other requirements as may be required to Obtain Occuoation /Comoletion Certificate TABLE-A F Shiv Park - 2 A3 Buildin G Tasks / Activity Percentage of Actual No. Work Done (As on date of the Gertificate) (1) (2t (3) 1 Excavatlon 0% 2 X number of Basement(s) and Plinth .) X number of Podiums 4 Stilt Floor A X number of Slabs of Super Structure 0o/o b lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 0o/o Fittings within the FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. I The external plumbing and exte.nal plaster, 0To elevation, completion of terraces with waterproofing of the Buildinq^r'\/ing 10 lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electr,cal fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate PARMESHWAR GOVIND GAWATI Arch. TABLE.A F ShivPark-2A4 s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) t2t (3) 1 Excavation 0% 2 X number of Basement(s) and Plinth J X number of Podiums 4 Stilt Floor 0% A X number of Slabs of Super Structure 0o/o 6 lnternal walls, Internal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the FlaUPremises t, Staircases, Lifts Wells and Lobbies at each Floor 0o/o level connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Buildingruing '10 lnstallation of lifts, water pumps, Fire Flghting 0o/o Fittings and Equipment as per CFO NOC, Electrical fittings to Commbn Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A ForP Shiv Park - 2 A5 Buildi s. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0% 2 X number of Basement(s) and Plinth J X number of Podiums PARMESHWAR GOVIND GAWALI Arch. 4 Stilt Floor 0% 5 X number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the FlaUPremises '7 Sanitary Fittings within the FlaUPremises, Electrical 0o/o Fittinqs within the FlaUPremises I Staircases, Lifts Wells and Lobbies at each Floor 0o/o level connecting Stailcases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, 0%o elevation, completion of terraces with waterproofing of the Building^/ving ,tn lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A ForP Shiv Park - 2 A6 Buildi S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0%o 2 X number of Basement(s) and Plinth ., X number of Podiums 4 Stilt Floor 0% 5 X number of Slabs of Super Structure 0% 6 lnternal walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the FlaUPremises, Electrical 0%o Fittinqs within the FlaUPremises 8 Staircases, Lifts Wells and Lobbies at each Floor 0o/o level connecting Staircases and Lifts, Overhead and Underqround Water Tanks. The external plumbing and external plaster, 0% elevation, completion of terraces with PARMESHWAR GOVIND GAWALI Arch. waterproofinq of the BuildingAlVinq 10 lnstallation of lifts, water pumps, Fire Fighting 004 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingANing, Compound Wall and all other requirements as may be required to Oblain Occupation /Completion Certificate TABLE.A ForP Shiv Park - 2 Bl Buildi S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 X number of Basement(s) and Plinth 100Y0 X number of Podiums 4 Stilt Floor X number of Slabs of Super Structure 100o/o 6 lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100o/o Fittinqs within the FlaUPremises Staircases, Lifts Wells and Lobbies at each Floor 100Y0 level connecting Staircases and Lifts, Overhead and Underground Water Tanks. o The external plumbing and external plaster, 100% elevation, completion of terraces with waterproofing of the Building^/ving 10 lnstallation of lifts, water pumps, Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate PARMESHWAR GOVIND GAWATI Arch. TABLE.A ForP ShivPark-282 S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 100o/o 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor 5 X number of Slabs of Super Structure 100% b lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fiftings within the FlaUPremises, Electrical 100% Fittings within the FlauPremises o Staircases, Lifts Wells and Lobbies at each Floor 100%o level connecting Staircases and Lifts, Overhead and Underqround Water Tanks I The external plumbing and external plaster, 1000 elevation, completion of terraces with waterproofinq of the Building/Wing 10 - Fire Fighting lnstallation of lifts, water pumps, 100% Fittings and Equipment as per CFO NOC' Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A ForProject Shiv Park - 2 83 Building S. Tasks / Activity Percentage of Actual No. Work Done on date of the PARMESHWAR GOVIND GAWATI Arch. Certificate) (1) (2t (3) 1 Excavation 1O0o/o 2 X number of Basement(s) and Plinth 100T0 X number of Podiums 4 Stilt Floor q X number of Slabs of Super Structqle 100o/o b lnternal walls, lnternal Plaster, Floorings within 100% Flats/Premises, Doors and Windows to each of the FlaUPremises 7 Sanitary Fittings within the FlaUPremises, Electrical 100% Fittings within the FlaUPremises l, Staircases, Lifts Wells and Lobbies at each Floor 100% level connecting Staircases and Lifts, Overhead and Underground Water Tanks I The external plumbing and external plaster, 100% elevation, completion of terraces with waterproofing of the Building/Wing 10 lnstallation of lifts, water pumps, Fire Fighting - 100Y0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingANing, Compound Wall and all oiher requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B Common Areas (lnternal & External Development Works) in respect of ForNew Project Shiv Park - 2 - A & B Buildings S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / actual Work Done NO) (As on date of Gertificate) (1) (2) (3) (4) (s) 1. lnternal Roads & Footpaths YES 10% Cement Roads 2. Water Supply YES 5Qo/o From Bore-well 3. Sewerage (Chamber, Lines, YES 10% Drainage Line & Septic Tank, STP) Septic Tank 4. Strom Water Drains NO N,A. 5. Landscaping & Tree Planting YES 20o/o As Per Norms 6. Street Lighting YES 10o/o Street Light in theproiect PARMESHWAR GOVIND GAWALI Arch. 7. Community Buildinqs NO N.A. 8. Treatment & Disposal of NO N.A. Sewaqe and Sullaqe Water 9. Solid Waste Management & NO N.A. Disposal 10. Water Conservation / Rain YES 00o/o Rain Water Water Harvestinq Harvestinq 11. Energy Management NO N.A. 12. Fire Protection & Fire Safety NO N.A. requirements 13. Electrical Meter Room, Sub- NO N.A. Station, Receivinq Station 14. Aggregate area of recreational YES 00o/o Open Space Open Space 15. Others (Option to Add more) NO N.A. Yours faithfully, zf\ (d,N- \€aolz Arch. PARMESHWAR GOVIND GAWALI License Number Agreed & Accepted by: /',^l $#X Signature of PromotBr Name:BALAJI INFRA Dale:'l2-1O-2024