ANNEXURE A FORM-2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor’s Certificate) Date:31/03/2024 To, M/S. AADINATH PROPERTIES, Thru Its Partners shri. Pravin Mangilal Katariya, shri Rushabh Pravin Katariya, And Shri Pratik Pravin Katariya. Plot No 32,32A, Sector Fl, Cidco N-4 Tq. Dist. Chh Sambhajinagar – 431001 Quality Assurance Certificate Certificate no _01 for the Quarter Ending 2023-24 Subject : Certificate for quality of materials used and quality of construction and workmanship for the work of AADINATH GLORIA having MahaRERA Registration Number P51500050856 developed by M/S. AADINATH PROPERTIES Thru Its Partners shri. Pravin Mangilal Katariya, shri Rushabh Pravin Katariya, And Shri Pratik Pravin Katariya. Sir, I / We ATUL JADHAV have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No. 1 Whether soil investigations of the site has been conducted before the structural design and soil Yes - - parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been appointed for the Yes Name: MR. NG project? KARKHANE License No: AMC – 59/89 Mobile: 9823028081 3 Whether the inspection registers, site order book and No - quality control test registers are maintained at the site properly and endorsed by the Engineer–in- Charge? 3 Whether all the work is being carried out under Yes - supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4. Whether remedial measures are undertaken to prevent Yes - dampness and leakages ? If yes, provide details 5. Whether safety precautions are undertaken during Yes - construction activities for all type of workers ? 4. Miscellaneous Sr. Parameters Yes No Remarks No. 1 Whether third party quality inspection is being carried out No - on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken for No - the soil? 3 Whether fire-fighting arrangements has been undertaken No - under supervision of fire consultant? 4 Whether proper signages have been installed on site/ No - completed building as per requirement? 5 Whether precautions are undertaken to avoid air pollution No during construction? Please specify. 6 Whether records of all test reports / results have been No - properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned building No - plans, utility drawings, various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/ cost effective/ green technology has been No - used for improving quality/energy efficiency? Please specify Yours Faithfully, Signature of Engineer (Site Supervisor) Name: Atul Jadhav Qualification (Civil Engineer) License No: ZP-840/2019 Place: Chh Sambhajinagar Agreed and accepted by Signature of Promoter Name : Pravin Katariya Date: 31/03/2024