/. Annexure A FORM 1 ISee Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 16-10-2023 To, BALAJ! INFRA, PLOT NO 2, AMBIKA NAGAR, NEAR JALGAON ROAD, CHHATRAPATT SAMBHAJINAGAR-431008 Subject: Certificate of Percentage of Completion of Construction Work of SHIV PARK-2 having MahaRERA Registration No. P51500053337 being developed by BAIAJI INFRA. (JUNE - OCT 2023 QTR) Sir, I / We Arch. Mr. PARMESHWAR GOVIND GAWALI have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of SHIV PARK-2 having MahaRERA Registration No. P51500053337 being developed by BALAJI INFRA. Based on the Site lnspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A1-A9 herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A For Project Shiv Park - 2 A1 Building S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) l2l (3) L Excavation LO}% 2 X number of Basement(s) and Plinth LOO% 3 X number of Podiums 4 Stilt Floor 100% 5 X number of Slabs of Super Structure LO0% 6 lnternal walls, lnternal Plaster, Floorings within 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical o0% Fittines within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks' 9 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/Wing lnstallation of lifts, water pumps, Fire Fighting Fittings oo% 10 and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A For Project Shiv Park - 2 A2 Building S. No. Tasks / Activity Percentage of Actua! Work Done (As on date of the Certificate) (1) (2) (3) LOO% 1 Excavation X number of Basement(s) and Plinth 700% ? 3 X number of Podiums LOO% 4 Stilt Floor LOO% 5 X number of Slabs of Super Structure 6 lnternal walls, lnternal Plaster, Floorings within 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks' The external plumbing and external plaster, elevation, o0% 9 completion of terraces with waterproofing of the Buildine/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 00% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A For Project Shiv Park - 2 A3 Building S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) L Excavation L00% 2 X number of Basement(s) and Plinth LOO% 3 X number of Podiums 4 Stilt Floor LOO% 5 X number of Slabs of Super Structure t00% I 6 lnternal walls, lnternal Plaster, Floorings within o0% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, o0% completion of terraces with waterproofing of the Buildins/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 00% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABtE.A For Project Shiv Park - 2 A4 Building S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Cenificate) (1) l2l (3) L Excavation L00% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor L00% 5 X number of Slabs of Super Structure L00% 6 lnternal walls, lnternal Plaster, Floorings within oo% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level o0% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproof ing of the I Building/Wing 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 00% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) l2l (3) 7 Excavation LO0% 2 X number of Basement(s) and Plinth L00% 3 X number of Podiums 4 Stilt Floor LOO% 5 X number of Slabs of Super Structure LOO% 6 lnternal wa lls, lnterna I Plaster, F loorings with in 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical o0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level o0% connecting Staircases and Lifts, Overhead and U nderground Water Tanks. 9 The external plumbing and external plaster, elevation, oo% completion of terraces with waterproofing of the Buildine/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 00% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A For Project Shiv Park - 2 AG Building S. No. Tasks / Rctivity Percentage of Actual Work Done (As on date of the Certificate) (11 l2l (3) 1 Excavation 700% 2 X number of Basement(s) and Plinth 100% 3 X number of Podiums 4 Stilt Floor lOOo/o 5 X number of Slabs of Super Structure LOO% 6 lnternal walls, lnternal Plaster, Floorings within 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 1 Sanitary Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, oo% completion of terraces with waterproofing of the Building/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings 00% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Com pletion Certificate TABtE.A For Project Shiv Park -2BL Building S. No. Tasks / Rctivity Percentage of Actua! Work Done (As on date of the Certificate) (1) (2) (3) L Excavation oo% 2 X number of Basement(s) and Plinth OOo/o 3 X number of Podiums 00% 4 Stilt Floor oo% 5 X number of Slabs of Super Structure 00% 6 lnternal walls, lnternal Plaster, Floorings within oo% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/Wing L0 lnstallation of lifts, water pumps, Fire Fighting Fittings 00% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABtE.A For Project Shiv Park - 2 82 Building S. No. Tasks / Rctivity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) L Excavation o0% 2 X number of Basement(s) and Plinth 00% 3 X number of Podiums 00% 4 Stilt Floor 00% 5 X number of Slabs of Super Structure oo% 6 lnternal walls, lnternal Plaster, Floorings within o0% Flats/Premises, Doors and Windows to each of the Flat/Premises a 7 Sanitary Fittings within the Flat/Premises, Electrical o0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lo.bbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, o0% completion of terraces with waterproofing of the Buildine/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings o0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.A For Project Shiv Park - 2 83 Building S. No. Tasks / Rctivity Percentage of Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation 00% 2 X number of Basement(s) and Plinth 00% 3 X number of Podiums oo% 4 Stilt Floor oo% 5 X number of Slabs of Super Structure o0% 6 lnternal walls, lnternal Plaster, Floorings within O0o/o Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanita'ry Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Undersround Water Tanks, 9 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the I Buildine/Wine 10 lnstallation of lifts, water pumps, Fire Fighting Fittings o0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, .mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (lnternal & External Development Works) in respect of For New Project Shiv Park -2- A & B Buildings S. No. Common Areas & Facilities Proposed Percentage of actual Details (Yes / No) Work Done (As on date of Certificate) (1) l2l (3) (4) (s) 1 lnternal Roads & Footpaths YES 30% Cement Roads 2 Water Supplv YES s0% From Borewell 3. Sewerage (Chamber, Lines, YES 00% Drainage Line & Septic Tank, STP) Septic Tank 4. Strom Water Drains NO N.A, 5 Landscaping & Tree Plantine YES OOo/o As Per Norms 6 Street Lighting YES 00% Street Light in the project 7. Community Buildings NO N.A. 8 Treatment & Disposal of Sewage NO N.A. and Sullage Water 9. Solid Waste Management & NO N.A. Disposal 10 Water Conservation / Rain Water YES oo% Rain Water Harvesting Ha rvesting 11. Energy Management NO N,A. 72 Fire Protection & Fire Safety NO N.A. requirements 13 Electrical Meter Room, Sub- NO N.A. Station, Receiving Station L4. Aggregate area of recreational YES o0% Open Space Open Space t 15. Others (Option to Add more) NO N,A. Yours faithfully, Arch. PARMESHWAR GOVIND GAWALI License Number Name: BAIAJI INFRA Date:15-10-2023