Aurangabad Metropolitan Regional Development Authority APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Permit No - 162480 Permit No. : AMRDA/B/2023/APL/00217 Proposal Code : AMRDA-22-100148 Date : 21/02/2023 Building Name : A1(Mixed) Floors : GROUND FLOOR Building Name : A2(Mixed) Floors : GROUND FLOOR Building Name : A3(Mixed) Floors : GROUND FLOOR Building Name : A4(Mixed) Floors : GROUND FLOOR Building Name : A5(Mixed) Floors : GROUND FLOOR Building Name : A6(Mixed) Floors : GROUND FLOOR Building Name : B1(Mixed) Floors : GROUND FLOOR ,FIRST Building Name : B2(Mixed) Floors : GROUND FLOOR ,FIRST FLOOR Building Name : B3(Mixed) Floors : GROUND GLOOR ,FIRST FLOOR To, i)SHREE BALAJI INFRA THROUGH PARTNER CHANDRAKANT AMBADAS KARPE, PANDHARINATH SONAJI GADEKAR, SATISH TEJRAO JADHAV, SANTOSH PANDITRAO IDHATE, SHREE RUTUJA DEVELOPERS THROUGH PARTNER RAJU PRABHU KAKDE, REKHA RAJU KAKDE, GUT NO.372 PART ,MAUJE .PALSI,TQ DIST.AURANGABAD ii) Parmeshwar Gavali (Engineer) Sir/Madam, With reference to your application No AMRDA202200283, dated 12-01-2023 for the grant of sanction of Commencement Certificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966 read with - , to carry out development work / Building on Plot No 01, Revenue S.No. / Khasra no. / Gut no 372 Part, City Survey No , Mouje Palsi situated at Road / Street , Society . The Commencement Certificate / Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of UDCPR. If any permission is required to be obtained from any department of the state or central government under the provisions of any other laws / rules , it shall be binding on the owner/ developer to obtain such permission from the concerned authority. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road widening land is to be handed over to the authority in the lieu of DEVELOPMENT RIGHTS if any, then necessary possession receipt, registered transfer deed alongwith change in name on record of rights shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water ,where ever applicable shall be completed prior to completion certificate and design, drawing with completion certificate shall be submitted along with the application for occupancy certificate. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. Authority will not supply water for construction. 13. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for storm water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. 14. The owner/developer shall submit the completion certificate from the service consultant for completion of the septic tank or proper connection to the sewerage system of the authority or sewage treatment plant (where ever necessary) 15. Before Plinth completion Sanction for the Final layout should be taken by this authority with Demarcated TILR sheet From concerned authority and Sanad as per MLRC-1966 Sec 42-C From concerned authority. Signature Not Verified Digitally signed by RAVINDRA 1/2 NAMDEORAO JAYABHAYE Date: 2023.02.22 16:26:50 IST Reason: Approved Certificate Location: Aurangabad Metropolitan Regional Development Authority Aurangabad Metropolitan Regional Development Authority APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Permit No - 162480 Permit No. : AMRDA/B/2023/APL/00217 Proposal Code : AMRDA-22-100148 Date : 21/02/2023 Metropolitan Planner, Aurangabad Metropolitan Regional Development Authority, Scan QR code for verification of authenticity. 2/2