Atul. D. Iadhav B.E. [Crvil Engineering) t Consulting Civil Engineer a Governnlent Registered Engineer Plot no 33,N-4, Behind High court, Naya Nagar, Aurangabad (MH)- 431001 Date .1410412023 FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE To, M/S AADINATH PROPERTIES THRU ITS PARTNERS SHRI PRAVIN MANGILAL KATARIYA, PRATIK PRAVIN KARARIYA, AND RUSHABH PRAVIN KATARIYA Subject: Certificate of Cost lncurred for Development of Construction Work of RESIDENTIAL APPARTMENT BUILDING "AADINATH GLORIA" of the Project [RERA Registration Number-APPLIEDI situated on CTS NO 15296/12, PLOT NO 36, SITUATED AT SANDESH NAGAR, GARKHEDA, CHH SAMBHAJINAGAR DISTRICT. SAMBHAJINAGAR PIN 431 OO,I, Registration Number - ( APPLIED ) Sir l/ We M/S AADINATH PROPERTIES PARTNERS SHRI PRAVIN MANGILAL KATARIYA, PRATIK PRAVIN KARARIYA, AND RUSHABH PRAVIN KATARIYA have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, PLOT NO 36, SURVEY.NO '15296112 , demarcated by its boundaries, CTS No :15294146, Part of Survey No 7 to the North. 9Meter Wide road, to the South. PLOT NO.37, CTS NO 15296/25 to the East. Plot no 35, CTS NO:15296/11 to the West of SANDESH NAGAR, GARKHEDA, CHH SAMBHAJTNAGAR. DISTRICT CHH SAMBHAJINAGAR PIN 431OOl, admeasuring 264.30sq.mts. area being developed by M/S AADINATH PROPERTIES PARTNERS SHRI PRAVIN MANGILAL KATARIYA, PRATIK PRAVIN KARARIYA, AND RUSHABH PRAVIN KATARIYA 1. Following lechnical professionals are appointed by Owner / Promoter: - i) M/s/Shri.AMRISH JOSHI as Architect, ii) M/s /ShTiN.G.KARKHANE as Structural Consultant iii) M/s /Shri R.K. DHANDE as Quantity Surveyor ffi 2. We have estimated the cost of lhe completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the building (s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and ffi quantity for the entire work as calculated by Shri R.K. DHANDE quantity Surveyor" appointed by Developer/Engineer, and the assumption of the cost of material, labor and iI: I ! other inputs made by developer, and the site inspection carried out by us. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project l under reference as Rs.3,50,00,000/- (Rupees Three crore Fifty Lakh Only) The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Chh Sambhajinagar Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. t. The Estimated Cost lncurred till date is calculated at --NlL -- The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. A. The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) of the subject prolect to obtain Occupation Certificate / Completion Certificate from Chh Sambhajinagar Municipal Corporation is estimated at Rs .3,50,00,000/- r. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below TABLE . A 5' \ Particulr's Amounts 1 Total Estimated cost of the building / wing as on 14104/2023 Rs .3,50,00,000/- date of Registration is 2 Cost lncurred as on 14/0412023 (based on the Estimated cost) ---NtL--*-* 3 Work done in Percentage o% (as Percentage ofthe estimated cost) 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs .3,50,00,00O/- Sr. No. Particulars :l":r.f i Cost lncurred on Additional / Extra ltems as on L4/0412023 ------N tt.---.. 5. not included in the Estimated Cost (Annexure-A) Yours Faithfully Itt[. lAoitlv coxsTRUcTloH (ATuLJADHAV) \$- t'Fro)tid0r signature of Engineer (License No/ ZP - 840 12019) * Note I . The scope of rvork is to complete entire Real Estate Project as per dralvings approved from time to time so as to obtain Occupation Certificate /Completion Certilicate. 2. (*) Quantity survey can be done by office of'Engineer or can be done bl an independent Quantity Surveyor. whose certificate of quantity calculated can be relied upon by the Errgineer. In case of independent quantity surveyor being appointed b1, Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated b1 office of Engineer. the namc o1'the person in the office of Engineer. who is responsible for the quantity calculated should be rnentioned at the place rnalked (* ). 3. The estimated cost includes all labor. material. equipment and machiner-v- requiled tr.r carr) out entire work. 4. As this is an estimated cost, any deviation in quantity required tbr development of the Real estale Project will result in amendment ofthe cost incurredfto be incurred. 5. All components ofwork with specilications are indicative and not exhaustive. Annexure A, List of Extra / Additional Iterrs executed with Cost (Which were not part of the original Estimate of Total Cost)