R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA CONTACT: +91 7875558825, e-mail : jbandassociate1 @gmail.com J3. ASSOCIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM 1 (See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: 31/12/2024 To, VADevelopers, A-306,Citius, space olympia, sut Girni chowk, Garkheda Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of "ARYAN HILLS" Plot No-45 TO 50, Gut No-347/1 situated at satara Aurangabad having MahaRERARegistration Number (P51500050782 ) being Developed by Shri- Deepak Gangadhar Aher. And Shri - Prakash Gangadhar Aher through GPA VA Developers partner Shri. Vishal Rajaram Jadhav and other Sir, /We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of "ARYAN HILLS" Plot No-45 TO 50, Gut No-347/1, situated at satara Aurangabad having MahaRERA Registration Number (P51500050782) being developed by Shri - Deepak Gangadhar Aher. And Shri - Prakash Gangadhar Aher through GPA VA Developers partner Shri. Vishal Rajaram Jadhav and other. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for eachof the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. SADHAL A.J.LA.M.C.A Reg.No. \CAI10/40967 RCHS TABLE-A (Building A1 TO A11) S Tasks I Activity Percentage of Actual Work No. Done (As on date of the (1) Certificate) (2) (3) 1 Excavation 100 %. 2 Basements (if any) 3 Podiums (if any) 4. Plinth 100 % 5. Stilt Floor 6. Slab of Super Structure 100 % 7. Internal Walls, Internal Plaster, Floorings, Doors, 20 % windows within Flats / Premises ßlo 8 Sanitary Fittings within Flats / Premises 9 Staircases, Lift Wells & Lobbies at each Floor Level 25% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 25 % Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings0 and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity ADHA ALLAM.C.A Reg.No. CAIA0/48967 TABLE-A (Building B1 TO B11) S Tasks / Activity Percentage of Actual Work No. Done (As on date of the (1) Certificate) (2) (3) 1 Excavation 100 %. 2. Basements (if any) 3 Podiums (if any) 4 Plinth 100 % 5 Stilt Floor 6 Slab of Super Structure 100 % 7 Internal Walls, Internal Plaster, Floorings, Doors, 100 % windows within Flats / Premises Sanitary Fittings within Flats / Premises 100 % 9 Staircases, Lift Wells & Lobbies at each Floor Level 100 % Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 100% Completion of Terraces, with waterproofing of the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings Applicable points completed and Equipments as per CFO NOC, Electrical Fittings, 100 % Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (lInternal &External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage of Details No. (Yes / No) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No cidco Approved layout 2 WaterSupply Yes 70 % Bore well 3. Sewerage (Chamber Lines, Yes 100 % Septic tank Septic Tank, STP) 4. Strom VWater Drains No NA SADHAL A.lA M. C.A Reg.No. CA/10/48967, 4RCH HIT 5 Landscaping &Tree Planting YES 0 As per Amc norms 6 Street Lighting No NA 7 Community Buildings No NA - 8 Treatment & Disposal of Sewage No NA and Sullage Water Solid Waste Management & No NA Disposal 10. Water Conservation / Rain Water Yes 50 % NA Harvesting 11. Energy Management No NA 12. Fire Protection & Fire Safety No NA requirements 13. Electrical Meter Room, Sub- No 0 NA Station, Receiving Station 14. Others (Option to Add more) No NA SADHAL A.J..A.M.C.A Yours faithfully, Reg.No. CAI10148967 Signature &Name (inblock letters) Architect Jadhav RS License Number Agreed &Accepted by: Signature of Promoter Name: VA Developers Date:31/12/2024