R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA CONTACT: +91 7875558825, e-mail : jbandassociate1@gmail.Com 4.3.ASSOEIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 31/12/2023 To, VADevelopers, A-306,Citius, space olympia, sut Girni chowk, Garkheda Aurangabad Certificate of Percentage of Completion of Construction Work of "ARYAN HILLS" Subject: Plot No-45 TO 50, Gut No-347IM situated at satara Aurangabad having MahaRERA Registration Number (P51500050782 ) being Developed by Gangadhar Aher through Shri - Deepak Gangadhar Aher. And Shri - Prakash GPA V A Developers partner Shri. Vishal Rajaram Jadhav and other Sir, |/We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of "ARYAN HILLS" Plot No-45 TO 50, Gut No-347/1, situated at satara Aurangabad having MahaRERA Registration Number (P51500050782) being developed by Shri - Deepak Gangadhar Aher. And Shri - Prakash Gangadhar Aher through GPA VA Developers partner Shri. Vishal Rajaram Jadhav and other. Based on the Site Inspection, with respect to the Layout / each BuildingWing of the aforesaid for Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done herein each of the BuildingWing of the Real Estate Project under MahaRERA is as per Table-A below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. SADHAL A..JA.M.C.AU Reg.No. CA/10/48967 TABLE-A (Building A1 TO A11) Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100 %. 2 Basements (if any) 3 Podiums (if any) olololooooo 4 Plinth 5 Stilt Floor 6 Slab of Super Structure 7 Internal Walls, Internal Plaster, Floorings, Doors, windows within Flats / Premises 8 Sanitary Fittings within Flats / Premises Staircases, Lift Wells & Lobbies at each Floor Level0 Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation,0 Completion of Terraces, with waterproofing of the Building/Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings0 and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment CRZ NOC, Finishing to Entrance Lobbyls, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity 3ADHAL TAJLA.M.C.A Reg.No. CAI1014CI67 ITEG TABLE-A ( Building B1 TO B11) Percentage of Actual Work S. Tasks / Activity No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100%. 0 2 Basements (if any) 0 3 Podiums (if any) 4 Plinth 100 % 5 Stilt Floor 0 100 % 6. Slab of Super Structure 7. Internal Walls, Internal Plaster, Floorings, Doors, 80 % windows within Flats /Premises 8. Sanitary Fittings within FIlats / Premises 50 % 9. Staircases, Lift Wells & Lobbies at each Floor Level 50 % Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 50% Completion of Terraces, with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings Applicable points completed 11. and Equipments as per CFO NOC, Electrical Fittings, 20% Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B / Common Areas (lnternal & External Development Works) in respect of the Registered Phase Project Number Common Areas & Facilities Proposed Percentage of Details No. (Yes / NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No cidco Approved layout Yes 50% Bore well 2 Water Supply AMC chamber line 3 Sewerage (Chamber Lines, Yes Septic Tank, STP) 4 Strom Water Drains No A.JLA.M.CA Reg.No. CAI10/48967 5 As per Amc norms Landscaping &Tree Planting YES 6 Street Lighting No 7 Community Buildings No 8 Treatment & Disposal of Sewage No and Sullage Water 9. Solid Waste Management & No Disposal 10. Water Conservation / Rain WaterYes 0 Harvesting 11. Energy Management No 12. Fire Protection & Fire Safety No requirements 13. Electrical Meter Room, Sub- No Station, Receiving Station 14. Others (Option to Add more) No 3ADHAD A.LILA.M.C.A. Reg.No. Yours faithfully, CAI1Ö/48967) Signature & Name (in block letters) Architect Jadhav RS License Number Agreed &Accepted by: Signature of Promoter Name: VA Developers Date:31/12/2023