N.G. Karkhane B.E. (Hons.) (Pilani), M.Tech., (llT, Mum.), F.I.E., F.I.V., MISSE, MWWA, MAcl (USA) •:. Consulting Civil Engineer .:. Structural Designer •:. Government Registered Property Valuer (CAT I-474) •> Structural Auditor, .a Chartered Engineer(F-111017-5) (M) 9823028081 'MOGRA' Rana Nagar, Opp. Hotel Atithi, Jalna Road, Aurangabad -431 003. E-mail: ngkarkhane@gmail.com FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date :08/01/2025 The INDRAYANI HEIGHTS Subject : Certificate of cost Incurred for Development of [Project Name] for Construction of Residential building ( MahaRERA Registration Number) situated on the Plot bearing C.N. No./CTS No./Survey No./Final Plot No.2o|-A, GUT NO. 69/1 demarcated by its boundaries ( latitude and longitude of the endpoints)_to the North • GUT NOITKHEDA Village to the South ------Aurangabad Taluka to the East GUT NOAurangabad District a) to the West PIN of431008 Division GUT NO. 595 admeasuring sq.mts area being developed by INDRAYANI HEIGHTS Ref : MahaRERA Registration Number P51500050815 Sir, I/ WeEr. N.G. KARKIIANE have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, beingResidential Building(s)/ •situated on the plot bearing C.N.No./CTS No./Survey No.167/2/ Final.Plot No.15 of Village ITKHEDA Taluka Aurangabad. District `INDRAYANI Aurangabad DEVELOPERS PIN 431008 ( Promoter admeasuring |NDRAYANI 595 sq.mts area being developed by HEIGHTS). 1.Following technical professionals area appointed by O.wner / Promoter : a) M/s /Shri/ Smt Ar. Santosh Adhav. As L.S. / Architect b) M/s /Shri Er.N.G. KARKIIANE As Structural Consultant. c) M/s /Shri Er. N.G. KARKIIANE As MEP Cosultant. 2. We have est.imated the cost of the completion to obtain occupation Certificate / Completion Certificate, of the civil, MEP .and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by us appointed by Developer /Engineer, and the assumption of the cost of material, labor and other inputs made by developer and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completioh of the building(s) of the aforesaid project under reference as 47654035 /- ( Total of Table A and 8). The estimated Total cost of project is with reference to the civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Aurangabad municipal corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 284405566/-Total of Table A and 8 ). Theamountofestimatedcostlncurrediscalculatedonthebaseofamountoftotalestimatedcost. 5.Thebalancecostofcompletionofthecivil,MEPandAIliedworksofthebuilding(s)ofthesubject project to obtain occupation certificate / completion certificate from Aurangabad Muncipal Corporation (Planning Authority) is estimated at 19245469/-( Total of Table A and 8 ). 6. I certify th'at the cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and 8 below TAI3LE A Building /Wing bearing Number_ or called (to be prepared separately for each Building /Wing of the Real Estate project) Particulars Amounts (2) (3) Total Estimated cost of the building/wing Rs.47654035/- as on 06/01/2018 date of Registration is Cost incuned as on Rs 28405566/- (based on the Estimated cost) Work done in Percentage 59.610/o (as Percentage of the estimated cost ) Balance Cost to be Incurred Rs 19248469/- ®ased on Estimated Cost) Cost Incurred on Additional Alxtra Items 0.00 asOn not included in the Estimated Cost (Annexure A) TABLE 8 (to be prepared for the entire registered phase of the Real Estate Project) Particulars Amo u nts (2) (3) Total Estimated cost of the Internal andExternal 47654035/- Development Works including amenities and Facilities in the layout as On date of Registration is Cost incurred as on 28405566/- (based on the Estimatedcost). Work done in Percentage 59.61% (as Percentage of the estimated cost). Balance Cost to be Incurred 19248469/- (Based on Estimated Cost). Cost Incurred on Additional fflxtra Items 0.00 asen_ _ _ _ nct±nclud.ed.in the Estimated Cost (An-nexure A). Er. N. G. KARK=IANE INDRAYANI DEVELOPERS (Partner's Signature) Lfa.,!¥T:A``.`tiJ:I"/:.i }7 ,P.`;r ,I `: ` '``jr`,'J `+dt`z - *_=6&rEgi®a. * Note : 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the RealEstateprojectwillresultinamendmentofthecostincurred/tobeincurred. 5. AIl components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional Items executed with Cost (which were not part of the original Estimate of Total Cost) TABLE - C S. No. List of Extra / Additional / Deleted Items 1. I Amount(inRS.) i 2.