MANOJ KALA & ASSOCIATES B301, 302 Space Olympia, SutgirniChowk, KALA Garkheda, Chh. Sambhaji Nagar 431005 Contact: +91 9637005781 | architecture@mkaa.co.in FORM 1 (See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: - 10-10-2025 To, Saffron Associates, ChhatrapatiSambhajinagar (Aurangabad). Subject: Certificate of Percentage of Completion of Construction Work of Saffron Landmark having MahaRERA Registration Number P51500048247 being developed bySaffron Associates. Sir, Ihave undertaken assignment as Architect of Certifying Percentage of Completion of Construction Work of Saffron Landmark having MahaRERA Registration Number P51500048247 being developed by Saffron Associates. Based on the Site Inspection,with respect to the Layout / each BuildingWing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingWing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the actiity of entire Phase is detailed in Table-B. Date: 10/10/2025 Yours Faithfully, MANOJ KALA KAL Architect |Reg. No. CA/96/19597 Architect Manoj Kala RegNo: CA/96/19597 MANOJ KALA & ASSOCIATES B301, 302 Space Olympia, Sutgirni Chowk, KAL Garkheda, Chh. SambhajiNagar 431005 Contact: +91 9637005781| architecture @mkaa.co.in TABLE-A Layout | Building / Wing Number (to be prepared separately for each LayoutBuilding/Wing of Project) S Tasks I Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2 Basements (if any) 100% 3. Podiums (if any) No 4. Plinth 100% 5 Ground Floor 100% 6 Slab of Super Structure 80% 7. Internal Walls, nternal Plaster, Floorings, Doors, 47% windows within Flats /Premises 8. Sanitary Fittings within Flats /Premises Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building /Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobbyls, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Date: 10/10/2025 Yours Faithfully, MANOJ KALA KALA Architect Reg. No. CA/96/19597 Architect Manoj Kala RegNo:CA/96/19597 2|Page MANOJ KALA & ASSOCIATES B 301, 302 Space Olympia, Sutgirni Chowk, KAL Garkheda, Chh. Sambhaji Nagar 431005 Contact: +91 9637O05781| architecture@mkaa.co.in TABLE-B Common Areas (Internal &External Development Works) inrespect of the Registered Phase / Project Number Common Areas & Facilities Proposed Percentage of Details No. (Yes /NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths YES 40% Road Base (Foundation) Partially Completed. 2 Water Supply YES Not yet started 3 Sewerage (Chamber, Lines, YES Not yet started Septic Tank, STP) 4 Strom Water Drains NO Not yet started 5 Landscaping &Tree Planting YES 50% As per landscaping drawing 6 Street Lighting YES Not yet started 7. Community Buildings NO NA 8 Treatment 8 Disposal of NO NA Sewage and Sludge Water 9 Solid Waste Management &NO NA Disposal 10. Water Conservation / Rain YES Not yet started Water Harvesting 11. Energy Management YES Not yet started 12. Fire Protection & Fire Safety YES 10% Partially Completed. requirements 13. Electrical Meter Room, Sub- YES Not yet started Station, Receiving Station 14. Others (Option to Add more) NA Date: 10/10/2025 Yours Faithfully, Agreed &Accepted ko ASOC City Pride MANOJ KALA Aurangabad T0 KALAArchitect Architect Reg. No. CA/96/1959 Signature of PromotersABAO Manoj Kala Name: Saffron Associates. RegNo:CA/96/19597 Date: 10/10/2025 3|Page