ABHISHEK +91 89837 31781 BAKLIWAL abhishekbakliwal2126@gmail.com CIVILENGINEER Raja Bazar, Chh. Sambhajinagar (Aurangabad) 431o01 Annexure - B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:05/01/2025 To, The Saffron Associates, Chatrapati Sambhajinagar Aurangabad. Subject: Certificate of Cost Incurred for Development of Saffron Landmarks having Maha RERA Registration Number P51500048247 being Developed by Saffron Associates. Sir, 1. We have undertaken assignment of Certifying Estimated Cost for Saffron Landmarks having Maha RERA Registration Number P51500048247 being Developed by Saffron Associates. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants.The Schedule of Items &Quantity required for the entire work as calculated by Rajesh cost Vargantwar Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the carried out by us of material, labour &other inputs made by the Developer, and the Site Inspection to ascertain / confirm the above analysis given to us. reference 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under The estimated Total Cost at Rs. 80,00,00,000/- (Total of Table A & B) at the time of Registration. of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale &for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) /Wing(s) / Layout / Plotted Development from the MAHARERA being the Planning Authority under whose jurisdiction the aforesaidProject is being implemented. 4. The Estimated Cost incurred tilldate is calculates to Rs. 29,94,05,934/- (Total of Tatble A&B). The Amount of Estimated Cost Incurred is calculated. on the basis of input. materials./.services. used & unit cost of these items. 5. The Balance Cost of completion of the Civil, MEP &Allied Works for completion of Apartments & proportionate completion of internal & externalworks, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated Rs. 50,05,94,066/- (Total of Table A&B). 6. ICertify that the cost of Civil, MEP &Allied Work for apartments &proportionate internal &external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A&B below: TABLE- A Building- Saffron Landmarks S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building / Wing / Layout / Plotted 80,00,00,000/ Development as on date of Registration is 2 Cost incurred as on date of Certificate 29,94,05,934/ 3. Work Done in Percentage (as Percentage of Estimated 37.42% Cost) 4 Balance Cost to be incurred ** (based on Estimated 50,05,94,066/ Cost) 5 Cost incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) TABLE - B Internal & External Development Works in respect of Registered Phase S. No. Particulars Amount (in Rs.) 1 Total Estimated Cost of Internal & External Development 80,00,00,000/ Works including amenities &facilities in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate 29,94,05,934/ 3 Work Done in Percentage (as Percentage of Estimated 37.42% Cost) 4 Balance Cost to be incurred ** (based on Estimated 50,05,94,066/ Cost) 5 Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) ABHISHEK BAKLIWAL CivilEngineer Yours faithfully, ABHISHEK BAKLIWAL CIVIL ENGINEER Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act) Agreed &Accepted by: a y Pride Aurangabad T00 Signature of PromoterNGABNS Name: Saffron AsSociates Date: 05/01/2025 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time time as per specifications mentioned in the Agreement to Sale. by an independent 2. (") Quantity Survey can be done by the office of Engineer or can be done In Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on byy Engineer. name has to be case of independent quantity surveyor being appointed by Developer, the mentioned at the place marked (*) &in case quantity are being calculated by office of Engineer, the quantity calculated the name of person in the office of Engineer, who is responsible for should be mentioned at the place marked ("). Total Estimated Cost (1) 3. ("*) Balance Cost to be incurred (4) may vary from difference between cost etc. As this & actual Cost incurred (2) due to deviation quantity required /escalation of Estate Project isan Estimated Cost any deviation quantity required for the Development of Real will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative ¬ exhaustive deviation in input 5. Please specify if there are any deviations / qualifications. Example: Any material used from specifications in Agreement of Sale. TABLE-C List of Extra / Additional/ Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) 1. 2.