ABHISHEK 491 89837 31781 BAKLIWAL abhishekbakliwal2126@gmail.com CIVILENGINEER Raja Bazar, Chh. Sambhajinagar (Aurangabad) 431001 AnneKure - B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:07/07/2023 To, The Saffron Associates, Chatrapati Sambhajinagar Aurangabad. Certificate of Cost Incurred for Development of Saffron Landmarks having Maha RERA Subject: Registration Number P51500048247 being Developed by Saffron Associates. Sir, having Maha 1. We have undertaken assignment of Certifying Estimated Cost for Saffron Landmarks RERA Registration Number P51500048247 being Developed by Saffron Associates. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments &proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Developers / Drawings/Plans made available to us for the Project under Reference by the Consultants. The Schedule of Items &Quantity required for the entire work as calculated by Rajesh Vargantwar Quantity Surveyor appointed by the Developer/Engineer, the assumption of the cost of material, labour &other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 80,00,00,000/- (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Alied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale &for the purpose of obtaining 0ccupation Certificate / Completion the Building(s) / Wing(s) /Layout /Plotted Development from the Certificate for MAHARERA being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs. 14.56,74,406/- (Total of Table A &B). The Amount of Estimated Cost Incurred is calculated on the basis of input materials. unit cost of these items. services used & The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 65,43,25,594 /- (Total of Table A&B). 5. TCertify that the cost of Civil, MEP &Allied Work for apartments &proportionate internal &external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as Completed on the date of this certificate is as given in Table A & B below: TABLE- A Building- Saffron Landmarks S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building / Wing/ Layout / Plotted 80,00,00,000/ Development as on date of Registration is 2 Cost incurred as on date of Certificate 14,56,74,406/ 3. Work Done in Percentage (as Percentage of Estimated 18.20% Cost) 4 Balance Cost to be incurred ** ((based on Estimated 65,43,25,594 / Cost) 5 Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) TABLE- B Internal & External Development Works in respect of Registered Phase S. No. Particulars Amount (in Rs.) 1 Total Estimated Cost of Internal &External Development 80,00,00,000/ Works including amenities &facilities in the Layout as on date of Registration is Cost incurred as on date of Certificate 14,56,74,406/ 3 Work Done in Percentage (as Percentage of Estimated 18.20% Cost) 4 Balance Cost to be incurred ** (based on Estimated 65,43,25,594 / Cost) 5 Cost incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) ABHISHEK BAKLIWAL Civil Engineer Yours faithfully, ABHISHEK BAKLIWAL CIVIL ENGINEER Signature &Name (IN BLOCK LETTERS) with Stamp of Engineer [Not less than Bachelor's Degree Holder or equialent as per Section 2() of the Act) Agreed &Accepted by: Cty Pride O 1.a) Aurangabad Signatúre of Promoter Name: Saffron Associates KMGABNS Date: 07/07/2023 Note 1. The scopeof work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certifcate of Quantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) &in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (*") Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) &actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative not exhaustive 5. Please specify if there are any deviations /qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE-C List of Extra / Additional/Deleted Items con sidered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) 1. 2.