! FORM-2A [See MahaRERA order no. 5 of 2018] ENGTNEER',S CERTTFTCATE FOR qUALtW ASSURANCE (site su pervisor's certificate) Financialyear 2023-24 To Sh lok Realty Shop No. 1 & 2, Shubh Labh Regehcy, Ranjeet Nagar, Kalda Corner, Sh reya Naga r, Aurangabad-43 1001 Qua liW Assura nce Certificate Subiect : Certificate for quality of materials used and quality of Construction and workmanship for the Work of Renuka Nagari having MahaRERA Registration Number P51500050288 being developed by Shlok Realty Sir, I Nitin Chaudhari have undertaken an assignment of supervision of this real estate project. Our Responsibility: - I am responsible for carrying out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. 1. lnput Materials, Fixtures and Fittings I hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary fittings etc. and amenities to be provided by the Promoter in the said Project, building and the Apartment as are as per specifications mentioned in Agreement of Sale. For those items, where no specifications have been mentioned in agreement of sale. the materials, Fixtures and Fittings used conform to the relevant BIS Standards / BIS National Building codes or as per industry standards. ) 2. Workmanship - | hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Structural engineer: - Promoters has engaged structural engineer Mr. Sachin Dinkarrao Sinjirkar The structural design of buildings in this project has been done under his supervision The formwork and concrete mix design has been done as per lS 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 4. Preservation of records: - Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. 5. Please specify materials or any other item of work which were not conforming to the specifications as mentioned in the Agreement for sale: Yo u rs Fa ithfu Ily, Signature of Engineer (Site Supervisor) Name : Nitin Chaudha ri Phone no :9309929724 Place :Aurangabad Agreed and Accepted by Signature of Partner: Name: Mangesh R. Palaskar Date:25/A4/2024