FORM-2A (See Regulation 3 of the Maharashtra Real Estate (Regulation and Development) Regulations, 2017) ENGINEER’S CERTIFICATE (To be issued by a Registered Engineer on their Letterhead) To, The Maharashtra Real Estate Regulatory Authority, Mumbai. Subject: Engineer’s Certificate for Percentage of Completion of Construction Work of the Project — Kashi Gopal Park Project Registration No.: P51500050284 1. Details of Engineer Name of Engineer: Chaitanya S. Bhalerao RERA Registration No.: DDMCB/R/2024/APL/01814 Address: Bhagya Nagar, Near Baba Petrol Pump, Chht. Sambhajinagar 2. Certificate This is to certify that I have inspected the site of the above project and have verified the stage-wise progress of the construction work based on the approved plans and sanctioned drawings. The percentage of construction completed up to date _______ is as follows: Sr. No. Description of Work Work Completed (%) 1 Excavation / Foundation Completed 2 Plinth 3 RCC Structure 4 Brickwork 5 Plastering / Flooring 6 Finishing / MEP Works Total Construction Work Completed: ___________% 3. Declaration I certify that the above information is true and correct to the best of my knowledge and belief, and the progress of the construction work is as per the approved plans. Date: 28.10.2025 Place: Chht. Sambhajinagar (Aurangabad) Signature & Stamp of Engineer (Name, Qualification, RERA Registration No.)