I Er. Ravi Kavrani Annexurc B FORM 2 [see Rqulation 3] ENGINEER'S CERTIFICATE Cl-o be submifted at the tirre of Regisbation of Qrgoing Project and forwithdrawal of Moneyftom Designated Account-Pmject Wise) Date: 13.10.2025 To, PREETANSH DEVELOPERS Aurangabad, MAHARASHTRA'Ai 001 Subiect Certificate of Cost lncund for Development of I{NGS CITY having MahaRERA Registration Number P51500041t8&4 (Only Applicable after project Registartion) being developed by PREETANSH OEVELOPERS Sir, l/We Ravikumar Gopaldas Kavrani have of Certifying Estimated Cost for KINGS GITY having MahaRERA Registration Number P51500041i884 (Only Applicable after project Registration, being developed by PREETANSH DEVELOPERS ) 2.We have Estimated the cost of Givil, MEP and allied works required for completion of the aparbnents and proportionate completion oJ intemal & extemal works of the project as per specffications mentioned in agreements of sale. Our estimated cost calculations are bassd on tre drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyof appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection canied out by us to ascertain / confirm the above analysis given to us. ,. ,, 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 250000000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of intemal & external works,asJrer specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) AMng(s/ Layout /Plotted Development from the CIDCO being the Planning Authority under whose judsidiction the aforesaid prcjec't is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 250000000.00 (Total of Table A and B).The amount of Estimated Cost incuned is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Alied vvorks for completion of the apartments and proportionate Complition of intemal & extemal works, as per specffication mentioned in agreement of sale, of the Page 1 of4 Project is estimated at Rs 0.00 (Total of Table A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :A/NA Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 83000000.00 Plotted Development as on date of Registration is 2 83000000.00 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 100.00 4 Balance Cost to be Incurred**(Based on Estimated Cost) 0 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plotted Development bearing Number :B/NA Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 82000000.00 Plotted Development as on date of Registration is 2 82000000.00 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 100.00 4 Balance Cost to be Incurred**(Based on Estimated Cost) 0 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Building/ Wing /Layout Plotted Development bearing Number :C/NA Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building/Wing/Layout 83000000.00 Plotted Development as on date of Registration is 2 83000000.00 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 100.00 4 Balance Cost to be Incurred**(Based on Estimated Cost) 0 5 Cost Incurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Page 2 of 4 F Table B lntemal and Extemal Development Works in respect of the Registered Phase Sr. No. Particulars Amount (ln Rs.) {1t 1 Total Estimated Cost of the yoqt 2000000.00 Plotted Development as on on is 2 Cost incuned as on date of certificate 2000000.00 3 Work done in Percentaqe (as oercentaoe of the estimated cost) 100.00 4 Balance Cost to be lncuned**(Based on Estimated Cost) 0 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost ffablc -C) . KAVRANI A||lIIIY Et.|GIiIEIR RAV|KUMAR GopA d0(Alfith/rt/20231 APL104782 Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. STATE/R/20231APU04782 (if applicable) Date of Certificate: Agreed and Accepted Signature of Promoter Name: PREETANSH Date: 13.10.2025 1.The scope of work is to complete Registered Real Estate Project as per drawings approved ftom time to time and as per specifications mentionedin agreement of sale. 2.(-) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(**) Balance Cost to be incuned (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incuned. 4.All components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of4 TABLE C List of Extra/Additional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of 4