# Annexure C i7 FORM - 2A (See Matra RERA Order No. 5 of 2O18) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certifrcate) (To be submitted at the end of Financial Year) Date:0410712025 To, Preetansh Developers, Chhahapati Sambhaji Nagar QUALITY ASSURANCE CERTIFICATE (Certificate No | /2025-26 for the Quarter Ending June 2025) Subject: Certificate for quality materials used and quality of Construction & workmanship for the work of KINGS CITY having MahaREM Registration Number P51500045884 being Developed by Preetansh Developers. Sir, | / We Mr. Deepak Mishra have undertaken an assignment of supervision of this Real Estate Project. OUR RESPONSIBILITY | / We are responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in- situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. 111 INPUT MATERIALS, FIXTURES & FITTINGS | / We hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fiftings, etc and amenities to be provided by the Promoter in the said project, building fr l2l -WoRKMANSHIP that | / We hereby certify that the work has been carried out under our supervision. We further certify within the workmanship and quality is satisfactory and up to the mark and the work has been acceptable permissible limits of deviation as per relevant code of practice' I31 STRUCTURALENGINEER No (Reg' No' E- Promoters have engaged structural engineer Mr. Shrinivas L Karanjikar having License 210/95) having 0ffice No Cell No 9823315151 The formwork and The structural design of buildings in this Project has been done under his supervision' per other relevant codes as applicable' concrete mix design has been done as per ls 10262:2009 or as His periodic checks and certificates for STABILITY and SAFETY have been kept on record' I51 PRESERVATION OF RECORDS prescribed format and will be Record of all test results of this Project have been properly kept in the provision of preserved at least up to the Defect Liability Period or for the period as required by any other Law. Please specify deviation in quality of materials or any other item of work which were not conforming to the soecifications as mentioned in Agreement of Sale. Yours faithfully, Signature of Engineer (Site Supervis0r) Name: Mr. DeePak Mishra Oualification (Graduate) License No (if any): Mobile No:7020586173 Place: Chhatrapati Sambhaji Nagar Name: Preetansh Datei 04.07 .2025