Er.Savi Kavrani Alleaute - B ;'7 FORil-2 - [See Regulation 3] ENGINEERS CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawar of Money from Designated Bank Account) Date:04.07.2025 To, Preetansh Developers, Chhatrapati Sambhaji Nagar subject: certificate of cost rncurred for Deveropment of K'NGS ctry having MahaREM Regisfation Number p515ooo458S4 being Deveroped by preetansh Deveropers. Sir, 1 r / we Er. Ravikumar G- lhvrani have undertaken assignment of cqrtifying Estimated Krt{Gs clry having MahaREM Regisilration Numbei psrsooo4s8'4 cost for being Deveroped by Preetansh Develooers. 2' We have estimated the cost of civir, MEp and Atied works reguired for compretion of the ntemal & extemal works of the project as per the f Sale. Our estimated cost calculations are based on consurtants. eortems*n".,'.i,rtTolili1::H::ff::,ilfr:Jffrt'.I]il'fi,1 Deepak Mis Surveyor" appointed by the Developerffnginer, the assumption of the cost of mate other inputs made bv the Deveroper, and *re site Inspection canied out by us to ascertain / confirm the above analysis given to us. 3' We estimate Totar Estimated cost of compretion of the aforesaid project mentioned unoer reference at Rs. 24,82,00,000/- (Totar of rabre A & B) at the time of Registration. The estimated Totar cost of project is with reference to the civil MEp & Alied works compretion of the apartments & proportionate compretion of intemar & externar wo*s, as per the specifications mentioned in the Agrcement of sare & for the purpose of obtaining .ccupation certificate / completion certificate for the Buirding(s) / wing(s) / Layout / protted Deveropment from the clDoo being the pranning Authority under whose jurisdiction the aforesaid project is being implemented. 4 6 tit date is carcurates to Rs. 23,56,00,000/- ootar of rabre A & B). The Incurred is carcurated on the basis of input materiars / services used & 5' The Barance cost of compretion of the ciMl, MEp & AIIied works for co'pretion of Apartments & prop.rtionate compretion of internar & extemar works, as per specirications mentioned in Er. Ravi Kavrani Agrcement of sale, of the aforesaid project is estimated at Rs. 24,g2,00,000/- (Total of rable A & RJ. e t certity that the cost of civil, MEp & Alied work for apartments & proportionate internal & extemal wo|*s, as per the specifications mentioned in Agreement of sare, of the aforesaid project as completed on the date of this certificate is as given in Table A & B below: TAALE-A Building / Wing / Layout / plotted Development bearing Number called Kf NGS clrY (to be prepared separately of each Building ww / / Layout / Plotted Developnent of the Real Estate project) S. t{0. Parlieulars Amount (in Rs.) 1. Total Estimated Cost of Building / Wing / Layout i plofted 24,80,00,000.00 Development as on date of Registrztion is 2. Cost incuned as on date of Certificate 23,56,00,000.00 Work Done in Percentage (as percentage of Estimated Cost) 95% 4. Balance Cost to be incurred '* ((based on Estimated Cost) 1,24,00,000.00 Cost incuned on Additional / Extra ltsns not included in the Nil TABLE - B Intemal & Extemal Development Works in respect of Registered phase S. l{o. Parlirularc Amount (in Rs.) 1. Total Estimated Gost of Intemal & Extemal Development Works 2,00,000.00 including amenities & facilities in the Layout as on date of Cost incuned as on date of Certificate 00.00 @entag;E Estimaied Cost) 0o/o 4. Balance Cost to be incuned " ((based on Estimated Cost) 2,00,000.00 Cost incuned on Additional / Extra ltems not included in the Nil Estimated Cost Oable-C) Yours faithfully, Er. Ravikumar G. lkvrani ATERNO23/APLf,4TS2I Gy:KAVRAI{l sntjcltrD I r Qutttff tt{GIfltER rie9, ilo, SIiIVf,/20i3/ApV Signature of Promoter Name: Preetansh Datei 04.07.2025 a Er. Ravi Kavrani No[e: -'1. The scope of work is to complete Registered Real Estate project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (-) ouantig Survey can be done by the office of Engineer or can be done by an independent Quantity surveyor, who's certificate of ouantity calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, he name has to be mentioned at the place marked (") & in case quantity are being calcurated by office of Engineer, the name of person in fre office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (-). 3' (".) Balance cost to be incurred (4) may vary {rom difference between Total Estimated cost (1) & actual Cost incurred (2) due to deviation in quantity required r/ escalation of cost etc. As this is an Estimated cost any deviation quant'g required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incuned. 4. All componants of work with specifications arc indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE-C List of Extra / Additional / Deletcd ltems considered in t]le Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Erta / Additional / Iteleted ltems Amount (in Rs.) 1. NA 0 NA 0