YOGES H ZAVAR B.Arch., M.C.A., A.l t. A llr lll Architects lrl Interjor designers Reg.No. CA,i 98/23394 Landscape designers i'7 CONCEPTS office no 501, 5th floor, ABc East, Near prozone Malr, chikarthana MlDc, chh. sambhajinagar M. No. 932s678748 Annexure A FORM 1 [See Regulation 3l ARCHITEST'S CERTIFICATE (ro be submitted at the time of Registration of ongoing project & for withdrawal of Money from Designated Account) Dale- 04.07.2025 to, Preetansh Develooers. Chhatrapati Samghaji Nagar Subject: . Certificate of percentage of Completion of Construction Work of KINGS C|TY having MahaRERA Registration Number p51500045884 being Developed by Preetansh Develooers. Sir, l/ We.have undertaken assignment as Architect / Licensed Surveyor of Certifi/ing percentage of completion of construction work of KINGS llw having MahaREnn negisiration- Nurno"r. P51500045884 being Developed by preetansh Developers. Based on the site Inspection, with respect to the Layout / each Buildingiwing of the aforesaid Real Estate Project, I certiry that as on date of this certificate, the perceitage-ot wo* Done for each of the Build'ngMing of ihe Real Estate project under MahaREM is aJ per tante-n nerern !e!oy_v. T.hlpeFentage of work executed with r;spect lo each of the activity of entire phase is detailed in Table-8. i7 TABLE-A Layout / B,uilding / wing Number K|NGS crry A Buirding (to be prepared sepantery for each LayouUBuilding/Wing of project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) fl) t2l (3) 1, Excavation 1O0o/o Basements (if anv) NA Podiums (if any) NA 4. Plinth 10Oo/o 5. Stilt Floor 1000k - Slab of Super Structure 1000/o 7. Intemal Walls, Intemal@ 10oo/o windows within Flats / Premises 8. Sanitary Fittings within Flats / premises lOOo/o 9. Wetts@ Staircases, Litt 10Oo/o Overhead and Underground Water Tanks 10. Extemal elumuing@ 1000 Completion of Tenaces, with waterproofing of the 11. lOOo/o f Layout / Building i Wing Number KTNGS CtTy B Building (to be prepared separately for each LayouU.Bf ildingruing of Poect) s,- Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) 2l s) 1 Excavation 100% Basements (if any) NA Podiums (if any) NA 4. Plinih 100o/o Stilt Floor lOOo/o o. Slab of Suoer Structure lOOo/o 7. Internal Walls, Intemal Plaster, Floorings, Doors, 100% windows within Flals / Premises 8. Sanitary Fittings within Flats / Premises 850h o Staircases, Lift Wells & Lobbies at each Floor Level lOQo/o Overhead and Undergroqnd Water Tanks 10. Extemal Plumbing & External FlasGr, Ele\ration 100% Completion of Tenaces, with waterproofing of the Building / Wing 11 r Pumps, Fire Fighting Fittings 8Oo/o CFO NOC, Electricat Fittings, , Compliance lo conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinlh Proteclion, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requlrements as may be required to complete project as per specific€tions to Agreement of Sale, Any other Activity Layout / B_uilding / wing Number KINGS clw c Building (to be prepared separately for each LayouUBuilding/Vving of Project) S, Tasks / Activity Percentage of Actual Work No. Done (As on date of the Gertificate) (1) (2) (3) 1. Excavation 100% Basements (if any) NA Podiums (if any) NA 4. Plinth 1O0o/o Slilt Floor lOOo/o o. Slab of Super Structure 1000k Internal Walls, Intemal Plaster, floorings, Ooors, 100% windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 10Oo/o Staircases, Lift Wells & Lobbies at each Floor Level lOOo/o f Overhead and Underground Water Tanks 10. Fxtemal Plumbing & External Plaster, Elevation, lOOo/o Completion of Tenaces, with waterproofing of the Building / Wing 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings lOOo/o and Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing toEntrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingAr'Ving, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B common Areas (lntemal & Extemal Development works) in respect of the Registered phase / Project Number S. Gommon Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done (As on date of Certificate) (1) (21 (3) (4) (s) 1. Internal Roads & Footpalhs Yes O0o/o Water Supplv Yes 90o/o Sewerage (Chamber, Lines, Yes 90% Septic Tank, STP) 4. Landscapinq & Tree Plantino Yes O0o/o Streel Lightinq Yes 0Oo/o o- Water Conservation / Rain Water .Yes 9Oo/o Harvesting 7. Fire Protection & Fire Safetv No O0o/o requiremenls L Electrical Meter Room, Sub- Yes 80% Station, Receivino Station Overall Project Completed-95o/o Yours faithfully, & accepted Dy: nature of Promoter License Number (CA/98/23394) Name: Preetansh Developers Date: 04.07.2025 &, s\