a Er. Ravi Kavrani ArEexur€ - B r10Ru - 2 [See Regulation 3l ENGINEERS CERTIFICATE (To be submitted at the tirne of Registation of Ongoing i'roject arrd tbr Withcirawat of Money fiom Designated Bank Account) Date: 05.04.2025 To, Preetansh Developers, Chhatrapati Sambhaji Nagar Subject C,ertificate of Cnst Incuned for D,evelopment of l(lflGS GITY having MahaRERA Registration Number P51500o45884 being Developed by Preetansh Developers. Sir, 1. I / We Er. Ravilumar G- l(avrani have undertaken assignment of Certifying Estimated Cost for Kll{GS CITY having MahaRERA RegisFation Number p5150o045884 being Developed by Preetansh Developers. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of intemal & extemal works of the Project as per the specifications mentioned in the Agreement of Sale. our estimated cost calculations are based on the Drawings/Plans made available to us fof the Project under Refeieficg by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Mr. Deepak Mishra ouantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection canied out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 24,82,00,000f (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works mmpletion of the apartments & proportionate completion of intemal & extemal works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining 0ccupation Certificate / Completion Ceriificate for the Building(s) / Wng(s) I Layout / Plotted Development from the CIDCo being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimateid Cost incuned till date is calculates to Rs. 23,06,40,000/- Ootal of Table A & B). The Amount of Estimated Cost Incurred is calculated on the basis of inout materials / services used & unit cost of these items. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of intemal & extemal works, as per specifications mentioned in p Er. Ravi Kavrani Agreement of Sale, of the aforesaid Project is estimated at Rs. 24,82,00,000f (Total of Table A & p'l 6. I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate intemal & extemal works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this cerfficate is as given in Table A & B below: TABLE- A Building / Wtng / layout / Plotted Development bearing Number or called Kll{GS CITY (to be prepared separately of each Building / Wtne / Layolrt / Plotted Development of the Real Estate Project) S. l{o. Particulars Amount (in Rs.) 1 Total Estimated Cost of Building / Wing / Layout / Plotted 24,80,00,000.00 Development as on date of Reqistration is Cost incuned as on date of Certificate 23,06,40.000.00 Work Done in Percentaqe (as Percentaqe of Estimated Cost) 93% 4. Balance Cost to be incuned *' ((based on Estimated Cost) 1,73,60,000.00 Cost incuned on Additional / Exfra ltems not included in the Nil Estimated Cost (Table-C) TABLE - B Internal & External Development Works in respect of Registered Phase S. No. Pafiiculars Amount (in Rs.) I Total Estimated Cost of Intemal & Extemal Development Worfts 2,00,000.00 including amenities & facilities in the Layout as on date of Reqistration is Cost inolned as on date of Certificate 00.00 ? Work Done in Percentaqe (as Percentaqe of Estimated Cost) 0% 4. Balance Cost to be incuned .* ((based on Estimated Cost) 2,00,000.00 Cost incuned on Additional / Exba ltems not included in the Nil Estimated Cost (Table-C) r+fr n nililrKufi ilFnTEnffi IAPU04782) CIIISU[TIilG $RUCTURAI. QUAI{IIII El{GII{EIR Reg, |{o, STAIE/R/1023/APt/04182 Agreed & accepted by: fxa p Er. Ravi Kavrani Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor. who's Certificate of Quantitv Calculated. can be relied uD on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") & in case quantity are being calculated by oftice ol Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (-). 3. (.") Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (1) & actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incuned / to be incuned. 4. All components of !'/ork with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Addition.l / I}eleted ltems Amount (in Rs.) 1. NA 0 n NA 0