rll 6 ir YOGESH ZAVAR Architects B Arch , lvl C.A , A l.l A TTI Interior designers Reg No Ctu98/23394 TIT Landscape designers CONCEPTS C+2, D -Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. Mobile No. 93256787 48 Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at tl.e tirne of Regishation of Ongoing Project & for Withdrawal of Money from Designated Account) Date:- 05.04.2025 To, Preetansh Developers, Chhatrapati Sambhaji Nagar Subject: Certificate of Perc€ntage of Compl€tion of Construction Work of KINGS CITY having N4ahaRERA Registration Number P51500045884 being Developed by Preetansh Developers. Sir, I / We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Compl€tlon of Construction Work of KINGS CITY having MahaRERA Registration Number P5150m45884 being Developed by Preetansh Developers. Based on the Site Inspection, with respect to the Layout / each Buibing^/Ving of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under lVahaRERA is as per Table-A herein below, The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE.A Layout / Building / Wing Number KINGS CITY A Building (to be prepared separately for €ach LayouUBuildingMing of Proiect) S. No. Tasks /Activity P€rcentage of ActualWo Don€ (As on date of the C€rtificat€) (2) (3) 1 Excavation 100% 2. Basem€nts (if anv) NA 3. Podiums (if any) NA d 4. Plinth 100Vo 5. Stilt Floor 1004/o 6. Slab of Super Structure 1000/o 7. Internal Walls, Intemal Plaster, Floorings, Doors, windows within 100% Flats / Premises 8. Sanitarv Fittinqs within Flats / Premises 100V0 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead and 100V0 Underoround Water Tanks '10. External Plumbing & External PIaster, Elevation, Completion of 100% Terraces, with waterproofinq of the Buildinq / Winq 11 Installation of Lifts, Water Pumps, Fire Fightjng Fittings and 100Vo Equipment's as per CF0 N0C, Electrical Fittings, lvlechanical Equipment's, Compliance to conditions of Environment / CM NOC, Finishing to Entrance Lobby/s, PIinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other r€quirements as may be required to complete Project as per soecifications to Aoreement of Sale, Anv other ActivitV Layout / Building / Wing Number KINGS CITY B Building (to be prepared separat€ly for each LayouUBuildingMing of Project) S. No, Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (2) (3) 1 Excavation 1004/o 2. Basements (if any NA 3. Podiums (if anv) NA Plinth 100% 5. Stilt Floor 100% 6. Slab of Super Structure 1004/o 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 90% Flats / Premises 8. Sanitarv Fittinas within Flats / Premises 80% 9. Staircases, Lifr Wells & Lobbies at each Floor Level overhead and 80%o Underoround Water Tanks '10. Extemal Plumbing I External Plaster, Elevation, completion of 90% Terraces. with waterproofino of the Buildinq / Wing '11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 7lVo Equipment's as per CF0 N0C, Electrical Fittings, l\4echanical Equipment's, Compliance to conditions of Environment / CM NoC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Vving, Compound Wall and all other requirements as may be required to complete Project as per specifications to Aqreem€nt of Sale, Any other Activity Layout / Building i Wing Number KINGS CITY C Building (to be prepared separately for each LayouVBuildingMing of Proiect) S. No, Tasks / Activity Percentage of Actual Work Done (As on dato of tfie Certificate) (21 (3) P 1 Excavation 100Vo 2. Basements (if anv) NA 3. Podiums (if anv) NA t Plnth 100% 5. Stilt Floor 't00vo 6. Slab of Super Structure 100Vo 7. Internal Walls, Internal Plaster, Floorings, Doors, windows within 100Vo Flats / Premises 8. Sanitarv tittinos within Flats / Premises 100% 9. Staircases, Lift Wells & Lobbies at each Floor Level overhead and 100% Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 1000/o Terraces. with wateroroofin0 of the Buildino / Winq 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 100% Equipment's as per CFo N0C, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NoC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building.Ming, Compound Wall and all other requirements as may be requir€d to complete Project as per soecifications to Aoreement of Sale, Anv other Activitv TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Numbor S. No. Common Ar6as E Facilities Proposed Percentage of actralWork Done Details (Yes / 1{0) {As on dat€ of C€rtificate) (1) (21 (3) (4) (5) 1 Internal Roads & Footoaths Yes 00% 2. Water Suoolv Yes 7lVo J. Sewerage (Chamber, Lines, Septic Tank, Yes 80Vo STP) 4. Landscapinq & Tree Plantinq Yes 00%o 5. Street Liohtino Yes 00Vo o. Water Cons€rvation i Rain Water Yes 60% Harvestino 7. tire Protection & Fire safety No 00% requtremen$ 8. Electrical Meter Room, Sub-Station, Yes 60% Receivino Station overall Project Completed-g3% Yours fuithfully, Ar. Yogesh Zavar License Number (CA/g8/23394) Date:05.04.2025