f Er..Ravi Kavrani Aanexure - B FORU - 2 [See Regulatlon 3l eNGIr,IEenS CERTIFICATE (To be submitted at the tine of Registration of Ongoing project and for Withdrawal of Money from Designated Bank Accourrt) Date: 01.01.2025 To, Preetansh Developers, Chhatrapati Sambhaji Nagar subject: certificate of cost Incutred for Development of Ktt{GS Glry having MahaREM Registration Number p51500Ct45884 being Developed by preetansh Developers. Sir, 1. | / we Er. Ravikumar G. Kavrani have undertaken assignment of certifying Estimated cost for l(|l{GS CITY having MahaRERA Registration Number p51500o45884 being Developed by Preetansh Developers. l. we have estimated the cost of civil, MEP and Allied works required for completion of the apartments & proportionate completion of intemal & extemal works of the project as per the specifications mentioned in'the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / consultants. The schedule of ltems & Quantity required for the entire work as calculated by Mr. Deepak Mishra Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the site Inspection canied out by us to ascertain / confirm the above analysis given to us. we estimate Total Estimated cost of completion of the aforesaid project mentioned under reference at Rs. 24,82,00,000/- (Total of rable A & B) at the time of Registration. The estimated Total cost of Project is with reference to the civil, MEp & Altied wo*s completion of the apartments & proportionate completion of intemal & extemal worfts, as per the specifications mentioned in the Agre'ement of sale E for the purpose of obtaining occupation certificate / completion certificate for the Building(s) / wing(s) / Layout / plotted Development from the clDc0 being the, Planning Authority under whose jurisdiction the aforesaid project is being implemented. The Estimatbd cost incuned till date is calculates to Rs. 2232.00 Lakh (Total of rable A & B). The Amount of Estimated C,ost Incuned is calculated on the basis of input materials / services used & unit cost of these items. The Balance Gost of completion of the civil, MEP & Allied works for completion of Apartments & proportionate completion of interfial & extemal works, as per specifications mentioned in a Er. Ravi Kavrani Agreement of Sale, of the aforesaid Project is estimated at Rs. 24,82,00,000/- (Total of Table A & B). I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate intemal & extemal works, as per the specifications mentioned in Agreement of sale, of the aforesaid project as completed on the date of this certificate is as given in Table A & B below: TABLE -A Building / Wrrtg / t ayout / Plotted Development bearing Number or called Klt{GS GITY (to be prepared separately of each Building / WnS / Layout / Plotted Development of ttre Real Estate Project) S. No. Particulars Amount (in Rs.) I Total Estimated Cost of Building / Wing / Layout / Plofted 24,80,00,000.00 Development as on date of,Registration is Cost incuned as on date of Certificate 22,32,00,000.00 Work Done in Percentage (as Percentaoe of Estimated Cost) 9070 4. Balance Cost to be incuned -" ((based on Estimated Cost) 2,48,00,000.00 Cost incuned on Additional / Extra lterns not included in the Nil Estimated Cost (Table-C) TAALD -B Internal & External Development Works in respect of Registered phase Total Estimated Cost of Intemal & Extemal Develooment Works including amenities & facilities in the Layout as on date of Cost incuned as on date of Certificate Work Done in Percentaqe (as Percentaqe of Estimated Balance Cost to be incuned -. ((based on Estimated Cost incurred on Additional i Extra ltems not included in the Yoursfaithfully, (N/,JF., ER. RAVIKUMAR G, KAVRANI cffi t|,HHISlflueru$lstHilt EilGIt{EtR ERF'|b $rTU*/ p rryffi ltew, APU o 47 82) Agreed & accepted by: Signature of Name: Preetansh Date: 01.01.2025 t Er. Ravi Kavrani Note: 1. The scope ol work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (.) Quantity Survey can be dorie by the office of Engineer or can be done by an independent Quantity Surveyor, wtro's Certificate of Quantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) & in case quantity are being calculated by oftice ot Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (")- 3. ("") Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (1) & achal Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incuned / to be inwned. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE -C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Exba / Additional / Deleted ltems Amount (in Rs.) 1. NA 0 2. NA 0