f YOGESH ZAVAR B Arch., M.C.A., A.l.l.A lrl III Architects Interior designers Reg.No CAJ98i23394 TIT Landscape designers CONCEPTS C+2, D - Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. Mobile No. 932567A74A Annexure .lI - FORM 1 [See Regulation 3l ARCHITEEI'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Dale:- 01.01 .2025 To, Preelansh Develooers. Chhalrapati Sambhaji Nagar Subject: Certificate of Percenlage of Completion of Construclion Work of KINGS GITY having MahaREM Regisjralion Number P51500045884 being Developed by Preetansh Develooers. Sir, | / We have underlaken assignment as Archifect / Licensed Surveyor of Certifying Percentage of Complelion of Construction Work of KINGS CIW having MahaREM Registration Number p5i.500045884 being Developed by Preetansh Developers. Based on lhe Site Inspection, with respect to the Layout / each BuildingAA/ing of the aforesaid Real Estate Project, I certify thal as on dale of this Cerlificale, the Percentage of Work Done for each of the Building/\iVing of the Real Estate Projecl under MahaRERA is as per Table-A herein below. The percenlage of work execuled with respecl to each of the aCtivity of enlire Phase is delailed in Table-B. p TABLE-A Layout / Building / Wing Number KINGS CITY A Building (to be prepared separately for each LayouUBuildingM/ing of Project) S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificato) (1) (21 (3) 1. Excavalion 100% Basements (if anv) NA Podiums (if anv) NA ^ Plinth 10070 Stilt Floor 1000/o 6. Slab of Suoer Slruclure 100V0 7 Internal Walls, Inlernal Plasler, Floorings, Doors, windows 1000/o within Flats / Premises 8. Sanitarv Fitlinos within Flats / Premises 100V0 L Slaircases, Lift Wells & Lobbies at each Floor Level Overhead 1000/o and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion of 1000/o Terraces. with wateroroofinq of the Buildinq / Winq 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 100% Equipment's as per CFO NOC, Electrical Filtings, Mechanical Equipment's, Compliance to c'onditions of Environment / CRZ N0C, Finishing 1o Enlrance Lobby/s, Plinlh Protection, Paving of Areas appurlenant lo BuildingMing, Compound Wall and all olher requiremenls as may be required lo complele Project as per specifications lo Aqreemenl of Sale, Any other Activity Layout / Building / Wing Number KINGS CITY B Building (to be prepared separately for each Layo uVB u ild ingrlA/ing of Project) S. No. Tasks / Activity Percentage of Actual Wo* Done (As on date of the Gertificate) (1) (21 (3) 1 Excavation 1000/o Basements (if any) NA Podiums (if any) NA 4. Plinth 1000/o Stilt Floor 1000/o 6. Slab of SuDer Slructure 1000/o 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 800/o within Flals / Premises 8. Sanilarv Fittinqs within Flals / Premises 7jVo L Staircases, Lift Wells & Lobbies at erch Floor Level Otrerhead 700/o and Underqround Water Tanks I 10. External Plumbing & External Plaster, Elevation, Completion of 80% Terraces, with waterproofino of the Buildinq /Winq 11. Installation of Lifts, Water Pumps, .Fire Fighting Fittings and 50% Equipmenl's as per CFO NOC, Electrical Fittings, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing lo Entrance Lobby/s, Plinth Prolection, Paving of Areas appurtenanl to BuildingAl/ing, Compound Wall and all other requiremenls as may be required lo complele Projeci as per specificalions 10 Aoreemenl of Sale, Any olher Activilv Layoul / Building / Wing Number KINGS CITY C Building (lo be prepared separalely for each Layo uUB u ild ingArVin g of Project) S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) t2l (3) 1. Excavation 10070 2. Basements (if anv) NA Podiums (if anv) NA 4. Plinth 1000/o Stilt Floor 1000/o 6. Slab of Suoer Structure 100V0 7. Internal Walls, Inlernal Plaster, Floorings, Doors, windows 100% wilhin Flals / Premises 8. Sanitarv Fittinqs wilhin Flats i Premises 100% 9. Slaircases, Lift Wells E Lobbies at each Floor Level Overhead 1000/o and Underoround Water Tanks 10. Exlernal Plumbing & External Plasler, Elevalion, Completion of 1000/o Terraces, wilh walerproofinq of the Building / Wing 11. 'lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and 10070 Equipment's as per CFO NOC, Electrical Fittings, Mechanical Equipmenl's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenanl to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as oer soecifications to Aqreemenl of Sale, Anv other Activitv TABLE-B Common Areas (lnlernal & Exlernal Developmenl Works) in respect of lhe Regislered Phase / Projecl Number S. No. Gomnon Arcas & Facilities Proposed Percentage of actual Work Done Details ffes / N0) (As on date of Certificate) (1) (21 (3) (4) (5) 1 Internal Roads & Fooloaths Yes 00% 2. Water Supplv Yes 700/o Sewerage (Chamber, Lines, Septic Yes 60% I Tank, STP) 4 Landscapinq & Tree Plantino Yes 00% Street Lighting Yes 00% tt. Waler Conservation / Rain Water Yes 60% Harveslino . 7. Fire Prolection & Fire Safetv No 00% reouirements 8. Electrical Meler Room, Sub-Station, Yes 60% Receivino Slation Overall Projecl Compleled-90o/o Yours tuilhfully, Agreed & accepted by: Ar. Yogesh Zavar WwSignature of Promoter Name: Preetansh Develooers Date:01.01.2025