I Er..Ravi Kavrani A.|trterure - B FORU - 2 [sce Regulatton 3l ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Pmject aard for Withdrawal of Money from Designated Bank Account) Date: 0'1.01.2024 To, Preetansh Developers, Aurangabad Subject: Cerfificate of Cost Incuned for Development of KINSS CITY having MahaREM Registntion Number P51500045884 being Developed by Preetansh Devetopers, Sir, 1. l/ We Er. Ravilumar G. lGwani have undertaken assignment of Certifying Estimated Cost for l(lllcs CITY having MahaREM Registration Number p51500045884 being Developed by Preetansh DeveloDers. 2. We have estimated the cost of Civil, MEP and Allied Works required tor completion ol the apartments & proportionate completion of intemal & extemal works of the Project as per the specifications mentioned in the Agreement of Sale. our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Devslopers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by i/ir. Deepak Mishra ouantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost ot material, labour & other inputs made by lhe Developer, and the Site lnspection canied out by us to ascertain / conlirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under relerence at Rs. 24,80,00,000/- (Total ot Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & extemal works, as per the specifications mentioned in th€ Agreement of Sale & for th€ purpose of obtaining occupation Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the CIDCo being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. The Estimated Cost incuned till date is calculates to Rs. 1612 Lakh Ootal of Table A & B). The Amount of Estimated C,ost Incuned is calculated on the basis of inout materials / services used & unit cost of these items. The Balance Cost of completion of the Civil, MEP I Allied Works for completion of Apartments & proportionate completion ol intemal & extemal works, as per specifications menlioned in P Er."Ravi Kavrani . Agreement of Sale, ol the aloresaid Project is estimated at Rs. 24,80,00,000/- (Total ol Table A & B). 6. I Certity that the cost of Civil, MEP & Allied Work lor apartments & proportionate intemal & extemal works, as per the specitications menlioned in Agreement of Sale, of the aforcsaid Project as completed on the date of this certiticate is as given in Table A & B below: TABI.T - A Building / Wing / Layout / Plotted Development beadng Number _ or caled KfilGS CITY (to be prepared separately of each Building / Wi'rg / Layol4t I Plotted Development of the Real Estate Project) S. ilo. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building /Wing / Layout / Plotted 24,80,00,000.00 DeveloDment as on date of Reqistration is 2. Cost incuned as on date of Certificate 16.12.00.000.00 3. Work Done in Percentaqe (as Perconta0e ot Estimated Cost) 65% Balance Cost to be incuned ** ((based on Estimated Cost) 8.68.00.000.00 5. Cost incuned on Additional / Exlra ltems not includ€d in the Nil Estimated Cost fi able-C) TA'BI,T - B Intemal & Extemal Development Works in rcspect of Registered Phase S. ilo. Pa iculars Amount lin Rs,l 1. Total Estimatod Cost of Internal & External D€velopm€nt Works 2,00,000.00 including amenities & facilities in th8 Layout as on date of Reqistration is 2. Cost incuned as on dat€ of Cediticate 00.00 3. Work Done in Percenta0e (as Percentaqe of Estimated Cost) 0o/o Balance Cost to be incurred * (lbased on Estimated Cost) 2.00.000.00 5. Cost incured on Additional / Extra ltems not included in the Nil Estimated Cost fi able-C) ;ffi""iff:''ffiifiif$ifi/;;nxere License Number (STATE/R^\N APU047 82) Agreed & accepted by: ^. W --.Y Jrgnalure u rromorcr Name: Preetansh Developers Datet 01 .01 .2024 fl Er. Ravi Kavrani Note: 1. The scope ot work is to complete Registered Real Estate project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be retied up on by Engineer, In case of independent quantity surveyor b6ing appointed by Developer, the name has to be mentioned at the place marked (*) & in case quantity are being calcutat€d by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3. (t*) Balance Cost to be incuffed (4) may vary from difference between Totat Estimated Cost (1) & actual Cost incuned (2) due to deviation in quantity required I escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment ofthe cost incurred /to be incuned. 4. Ail components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / quatifications. Example: Any deviation in input material used trom specifications in Agreement of Saie. TABLE - C List of Extra / Additional / Deleted ltems considered in the Cost {Which werc not parts of the original Estimate of Total Cost) S. ilo. List ot Extla,/ Additional/ Deleted llens Amount (in Rs.) NA 0 2. NA 0