a Er. Ravi Kavrani . Auexure - B FORU - 2 [See Rcgulatton 3l ENGINEERS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project eltd for Withdrawal of Money from Designated Bank Account) Date: 05.'10.2023 To, Preetansh Developers, Aurangabad Subject: Certificate of Cost Incurred for Development of KIilGS CITY having MahaREM Registration Number P51500045884 being Developed by Preetansh Developers. Sif, 't. | / We Er, Ravikumar G. Kavrani have undertaken assignment of Certifying Estimated Cost lor KINGS Clry having MahaREM Registration Number Ps1500045884 being Developed by Preetansh Developers. 2. We have estimated the cost of Civil, [4EP and Allied Works required lor completion of the apartments & proportionate completion of internal & external works of the Project as per the specitications mentioned in the Agreement of Sale. our estimated cost calculations are based on the Drawings/Plans made available to us lor the Project under Referenc€ by the Developers / Consultants. The Schedulo of ltems & Qlantity required for the entire work as calculaled by Mr. Deepak Mishra Quantity Surveyor* appointed by the Developer/Engineer, the assumption o{ the cost of material, labouf & other inputs made by ths Developer, and the Site Inspection carried out by us to ascertain / conlirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aloresaid P.oject mentioned under reference at Rs. 24,80,00,0001 (Total ol Table A & B) at the time of Registration. The estimat€d Total Cost of Project is with reference to the Civil, MEP & Allied Works completion ot the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agroement of Sale & for the purpose ol obtaining occupation Certificate / Completion Certificate for the Building(s) / Wng(s) / Layout / Plotted Development from the CIDCo being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. The Estimated Cost incurred till date is calculates to Rs. '1488 Lakh (Total of Table A & B). The Amount ol Estimated Cost Incurred is calculated on the.basis of inDut materials / services used & unit cost ot these items. The Balance Cost of cornpletion of the Civil, MEP & Allied Works for completion ol Apartmenis & proportionate complstion of internal & external works, as per specifications mentioned in a Er; .Ravi Kavrani . Agreemont of Sale, of the aforosaid Project is estimated at Rs, 24,80,00,000/- (Total of Table A & B). 6. I Certify that the cost of Civil, MEP & Allied Work for aparlments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sal€, of the aforssaid Project as compl€ted on the date of this certilicate is as given in Table A & B below: TABLE - A Buildhg / Wing / Layout / Plotted Development be€ring Number _ or called KfilGS CITY (to be prepa.red separately of each Building / Wi')g / Layo\t / Plotted Development of the Real Estate Project) S. l{0. Pa iculars Amount (in Rs.) 1. Total Estimated Cost of Building /Wng / Layout / Plotted 24,80,00,000.00 Develooment as on date ol Reoistration is Cost incuned as on date of Certificate 14.88.00.000.00 Work Done in Percentaqe (as Percontaqe of Estimated Cost) 60% 4. Balance Cost to be incurr8d *t ((based on Estimated Cost) 9,92.00,000.00 5. Cosl incurred on Additional / Extra ltems not included in the Nil Estimated Cost (Table C) TABLE - B Internal & External Development Works in re€pect of Regietered Phase S. l{0. Particulars Anount 0n Rs.) Total Estimated Cost of lnternal & External Development Works 2,00,000.00 including amenities & facilities in the Layout as on date of Reoistration is Cost incuned as on date of Certificate 00.00 J. Work Done in Percentaoe (as Percentaoe of Estimated Cost) 0% 4. Balance Cost to be incurred ** ((based on Estimaled Cost) 2.00.000.00 Cost incurred on Additional / Extrjllqms not included in the Nil Estimated Cost (Table-C\ ,r'\ \ y-'' Yours faithlully, ER. .*ffi R G. I(AVRAI'II c0lls|Jl {6slR|JtrunAtQ|,lll lllcll{lln Er. Ravlkunar G. KavraniReg, No, SIATE/R/1023/APt/04782 License Number (STATE|R12023I APU04782) Agreed & accepted by: ur.-P,*"* Name; Preetansh Date: 05.10.2023 a Er. Ravi Kavrani Note: 1- The scope of work is to complete Registered Real Estato Project as per drawings approved Irom time to time as per specifications mentioned in th€ Agreement to Sale. 2. (-) ouantity Survey can be done by the offic€ ol Enginesr or can be done by an independent ouantity Surveyor, who's Certilicate of Quantity Calculatsd, can be r€lied up on by Engineer. In cass of independent quantity surveyof being appointed by Developer, the name has to be mentioned at the place marked (') & in case quantity are being calculated by office of Engineer, the name of person in the office ot Engine€r, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (*') Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation ol cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will resull in an amendment of the cost incurred / to be incurred. 4. AII componsnts ot work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualitications. Example: Any deviation in input material used from spocifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. Llst of Extra / Additional / Deleied ltems Amount (in Rs.) NA 0 2. NA 0