f Er; Ravi Kavrani _ All€*ure - B FORM - 2 [Se6 Regulatton 3l ENGINEER'S CERTIFICATE {To be submitted. at t1le time of Registration of Ongoing Project and for Witidrawal of Money from Designated Bank Accou4t) Date: 05.07.2023 To, Preetansh Developers, Aurangabad Subject: Certificate of Cost Incurred for Development of KINGS CITY having MahaREM Registration Number P51500045884 being Developed by Proetansh Developers, Sir, 1. l / We Er, Raviklnar G. Kavrani have undertaken assignment of Certifying Estimated Cost for lfll{Gs CITY having MahaRERA Registration Number ps1soo045884 being Devetoped by Preelansh Developers. 2. We hav€ estimated ths cost of Civil, MEP and Allied Works required for comlletion of the apartments & proportionate cornpletion of intemal & extemal vi,orks of the project as per the specifications mentioned in the Agreement of Sale. our estimated cost calculations are based on the Drawings/Plans made available to us for tha Project undor Reference by th€ D€velop€rs / Consultants. Thg Schedule of ltems & 0uantity required for the entire work as calculatsd by Mr. Deepak ltlishra Quantity Surveyor* appointed by the Developer/Engineer, the assumpflon of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carded out by us to ascertain / mnfirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mention€d und€r roference at Rs. 24,80,00,000/- (Tohl of Table A & B) at the time of Registration. The estimated Total Cost ot Projeot js with reference to the Civil, MEP & Allied Works comptetjon of the apartments & proportionate completion of intemal & extemal works, as pei the speciflcations mentioned in the Agreement of Sale & for the purpose of obtaining 0cc{lpation Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Devetopment from the CIDCO being he Planning Authority under whose jurisdiction the aforesaid project is being irnplemented. The Estimated Cost incuned till date is calculaies to Rs, 1240 Lakh (Total of Table A & B). The Amount of Estimated Cost Incuned is calculated on the basis of input materials / servicss us€d & unit cost of these items. The Balance Cost of completion of the Civil, MEP & Allied Works for comptetion of Apartments & proportionate completion of intemal & extemal works, as per spgcitications mentioned in f Er;.Ravi Kavrani . Agreement oI Sale, of the aforesaid Project is estimated at Rs. 24,80,00,0004 (Totat of Table A & B). 6. I Certity that the cost of Civil, MEP & Allied Work for apartments & prcportionate int€mal & extemal wo*s, as per the specifications mentjoned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / Wing / Layout / Plotted Development beaiing Number _ or caled KINGS CITY (to be prepared separately ofeach Building / Wing / Layout / Plotted Development of t]le Real Estate Project) S. I'lo. Parllculars Anount (in RE.) I Total Estimated Cost of Building /Wing / Layout / Plotted 24,80,00,000.00 Development as on dato of Reoistration is 2. Cost incuned as on date of Certificate '12,40,00,000.00 3. Work Done in Percentaqe (as Percentaqe of Estimated Cost) 50% Balance Cost to be incurred ** ((based on Estimated Cost) 12.40.00.000.00 Cost incuned on Additional / lxtra ltems not included in the Nil Estimated Cost (Table-C) TABLE _ B Intemal & External Development Works ilr rcspect ofRegistered Phase S. No. Particulars Amount (in Rs,) 1. Total Estimat€d Cost of lnt€mal & Ext€mal DeveloDment Works 2,00,000.00 including amenities & facilities in the Layout as on date ol Reqistration is 2. Cost incuned as on date of Certilicate 00.00 3. Work Done in Percentaqe (as Percentaqe of Estimated Cost) 0To 4. Balance Cost to be incuned .- ((based on Estimated Cost) 2.00,000.00 5. Cost incured on Additional / Extra ltems not included in the Nil Estimaied Cost fi able-C) You99Ptu\ S4r Er. Ravikumal G. Kavlanl Licensd Number (STATE RnO23 APU O 47 82\ ER. RAVII(UI{AR G. KAVRANT c0lr5llullt6 StnlJfil,Rtr ol,|fi{IrTy ${6 n{3.i$#ds/4/ffi$$8lt Signature of Promoter Name: Preetansh Devel Date:05.07.2023 (r Er; .Ravi Kavrani Note: '1. The scope of work is to complete Registered Real Estate Project as per drawings approved . from time to lime as per specifications mentioned in the Agreement to Sale. 2. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate olouantity Calculated, can be relied up on by Engineer. In case of indep€ndent quantity surveyor being appointed by Developer, thB name has to be mentioned at the place ma*ed (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*), 3. (") Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (1) & actual Cost incuned (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required tor the Development of Real Estate Project will result in an amendment ofthe cost incuned /to be incured, 4. All components of work with specifications are indicative & not exhaustive 5. Please specity if ther€ are any d€viations / qualitications. Example: Any d€viation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in tl1e Cost (Which were not paits of the original Estimate of Total Cost) S. ilo. List ot EIaa / Additional/ Deleted ltens Amou (in Rs.) 1. NA 0 2. NA 0