Er. Ravi Kavrani Annexure - B FORil - 2 [Seo Regulatioa 3l ENGINEERS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Wittrdrawal of Money from Designated Bank Account) Date:06.01.2023 To, Preetansh Developers, Aurangabad Subject: Certificate of Cost Incuned for Development of KINGS GITY having MahaREM Registration Number P51500045884 being Developed by Preetansh Developers. Sir, | / We Er. Ravi G. Kavrani have undertaken assignment of Certifying Estimated Cost for KINGS GITY having MahaRERA Registration Number P51500045884 being Developed by Preetansh Developers. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Mr.Manoj Joshi Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection canied out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 24,80,00,000! (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion df the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining 0ccupation Certificate / Completion Certificate for the Building(s) / Wing(s) I Layout I Plotted Development from the Er. Ravi Kavrani CIDCO being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. The Estimated Cost incured till date is calculates to Rs. 496 Lakh (Total of Table A & B). The Amount of ._E"s!i"r1ate!_.Q-os.!-Jncu_rred._ic.ca_l_sulaled.an"ttr_e,_b__asj.c_sf_ jnp-uL.m.aterial"s./"s.e.ryi_cps..usp__d__&_ - uni!.spsl.-ol,th-e,se.items. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 24,80,00,000f (Total of Table A & B). I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / Wne / Layout / Plotted Development bearing Number or called l(f l{GS GITY (to be prepared separately of each BuildinC / Wing / Layout / Plotted Development of the Real Estate Project) S. ilo. Pa iculars - Amount (in Rs.) 1. Total Estimated Cost of Building / Wing i Layout / Plotted 24,80,00,000.00 Develooment as on date of Reqistration is 2. Cost incurred as on date of Certificate 4,96,00,000.00 ? Work Done in Percentage (as Percentage of Estimated 20% Cost) 4. Balance Cost to be incurred .. ((based on Estimated 19,84,00,000.00 Gost) Cost incurred on Additional / Extra ltems not included in NiI the Estimated Cost (Table-C) TABLE- B Internal & External Development Works in respect of Registered Phase S. l{o. Pariiculars Amount (in Rs.) t. Total Estimated Cost of Internal & External Develooment 2,00,000.00 Works including amenities & facilities in the Layout as on date of Reqistration is Cost incurred as on date of Certificate 00.00 J. Work Done in Percentage (as Percentage of Estimated 0% Cost) 4. Balance Cost to be incurred ** ((based on Estimated 2,00,000.00 Er. Ravi Kavrani Cost) Cost incurred on Additional / Extra ltems not included in Nil the Estimated Cost (Table-C) Yours faithfully, Er. Ravi G. Kavrani P Agreed & Accepted by: 'Promoter Signature of Name: Preetansh Developers Date:06.01.2023 Note; 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. (-) Quantity Survey can be done by the office of Engineer or can be done by an independent Quanlity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). (..) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cbst (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4. All comoonents of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. Er. Ravi Kavrani . TIIBLE-C List of Exka / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. llo. List of tube / Additional / Deleted lbms Amount fin fu.} a NA 0 2. NA 0