Er. Ravi Kavrani Anaernrre - B FORil - 2 [See Regulatioa 3l ENGINEERS CERTIFICATE (To be submitted at the tinie of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:04.07.2022 To, Preetansh Developers, Aurangabad Subject; Certificate of Cost Incurred for Development of KlltlGS CITY having MahaREM Registration Number P51500045884 being Developed by Preetansh Developers. Sir, 1. I / We Er. Ravi G. Kavrani have undertaken assignment of Certifying Estimated Cost for Klt{GS GITY having MahaREM Registration Number P51500045884 being Developed by Preetansh Developers. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & e)dernal works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Mr.Manoj Joshi Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 24,80,00,000/- (Total of Table A-& B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of intemal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining 0ccupation Gertificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the CIDCo being the Planning Authority under whose jurisdiction the aforesaid Poect is being implemented. Er. Ravi Kavrani 4. The Estimated cost incurred till date is calculates to Rs. 00 Lakh (Total of rable A & B). The Amount of ,Eslinqtsd,,0p,s-t-lncu,r:red,is,-aal-c-lttaled.an -th-c",b,-as-is.9f,inp-ul-.nalgnals-1 s,e.rvrce-s-us-e..d_,& -un it.eos!.gf,th_e_se..ite_ ms. 5. The Balance cost of completion of the civil, MEP & Allied works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 24,80,00,000^ (Total of Tabte A & B). 6. I certi! that the cost of civil, MEP & Allied work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid project as completed on the date of this certificate is as given in Table A & B below: , TABLE-A Building / Wng / Layoll.t / Plotted Development bearing Number _ or called I(NGS CITY (to be prepared separately of each Building / WinS / Layo:ut / Plotted Development of the ReaI Estate project) S. lrlo. Particulars Amount (in Rs.) 1 Total Estimated Cost oT Building / Wing / Layout / Plotted 24,80,00,000.00 Development as on date of Registration is 2. Cost incurred as on date of Certificare 00.00 J. Work Done in Percentage (as Percentage of Estimated 00% Cost) 4. Balance Cost to be incurred ** ((based on Estimated 24,80,00,000.00 Cost) 5. Cost incuned on Additional / Extra ltems not included in Nil the Estimated Cost (Table-C) TABLE - B Internal & External Development Works in respect of Registered phase S. No. Particula.s Amount (in Rs.) 1. Total Estimated Cost of Internal & Extemal Develooment 2,00,000.00 Works including amenities & facilities in the Layout as on date of Registration is z. Cost incurred as on date of Certificate 00.00 ? Work Done in Percentage (as Percentage of Estimated 0% Cost) 4. Balance Cost to be incurred -- ((based on Estimated 2,00,000/- Cost) Cost incurred on Additional / Extra ltems not included in Nil the Estimated Cost (Table-C) Er. Ravi Kavrani Yours faithfully, Er. Ravi G. Kavrani Agreed & Accepted by: '\\-a'P' ------;-7 t't'' \ Signature of Promoter N?me: Preetansh Developers Datei04.07.2022 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per sp'ecifications mentioned in the Agreement to Sale. (.) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (-). (**) Balance Cost to be incuned (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Proiect will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. Er. Ravi Kavrani TIIBLE- C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. Itlo. Lbt ot Eltra / Addltlonal /Dololed lt ms Amount (ln Rs.) 1 NA 0 2. NA 0