fl YOGESH ZAVAR B.Arch., M.C.A., A.l.l.A rrl I II Architects Interior designers Re9.No. CA,/g8/23394 I TI Landscape designers CONCEPTS C+2, D - Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. Mobile No. gg?S67e7 48 An[exure A . FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawar of Money from Designated Account) to, Datei 04.07 .2024 Preetansh Developers, Chhatrapati Sambhaji Nagar subject: certificate of percentage of compretion of construction work of K|NGS having MahaREM Registration Number ps1s0o04s884 crry ueing- o;eioieo ov Preetansh Develooers. Sir, | / we.have undertaken assignment as Architect /. Licensed sTveyol of certirying percentage compretion of constructioriwork oi xiNo-s-Crrv tJJiig of P51500045884 being Developed by preetansh M"n"neRA Registration Numoer Developeri-'-- t TABI.E-A Layout / B_uilding / wing Number KINGS GITY A Buikhg (to be prepared separately for each LayouUBuildingM/ing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3 Excavation 100o/o 2. Basements (if any) NA Podiums (if any) NA 4. Plinth 100o/o Stilt Floor '|.000/o Slab of Super Structure 1O0o/o Internal Walls, Internal Plaster, Floorings, Doors, 100o/o windows within Flats / Premises 8. QqlLtary Fittings within Flats / Premises 1Qlo/o o Staircases, Lift Wells & Lobbies at each Floor Level 100o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 100% Completion of Terraces, with waterproofing of the Building / Wing 11. ps, Fire Fighting Fittings 100o/o NOC, Electrical Fittings, pliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activity Layout / Building / \Mng Number KINGS clw B Building (to be prepared separately for each LayouUBuildingMing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3 1. Excavation 10oo/o z- Basements (if any) NA ? Podiums (if any) NA 4. Plinth 1W% Stilt Floor 'lO0o/o A Slab of Super Structure 10oo/o 7. 3004 t windows within Flats / Premises n Sanitary Fittings within Flats / Prernises 00o/o 9. Staircases, Lift Wells & Lobbies at eidr Floor Level 30o/o Overhead and Underground Water Tanks 10. External Plumbing & Extemat Plaster, Elevation, 10o/o Completion of Terraces, with waterproofing of the Building / Wing 11 ps, Fire Fighting Fiftings 00% NOC, Elec{rical Fittings, pliance to conditions of Environment / CFZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activity Layout./ Building-/ wing Number KINGS clry c Building (to be prepared separately for each LayouVBuildingANing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) t. Excavation lOOo/o 2. Basements (if any) NA 4. Podiums (if any) M Plinth 10Oo/o 5. Stilt Floor 1004/0 o. Slab of Super Structure 100o/o Internal Walls, Internal Plaster, Floorings, Doors, 80% windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 30o/o o Staircases, Lift Wells & Lobbies at each Floor Level 6QYo Overhead and Underground Water Tanks 10. External Plumbing & External plaster, Eletation 50o/o Completion of Terraces, with waterproofing of the Building / Wing 11 50o/o Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activity TABLE-B common Areas (lnternal & External Development works) in respect of the Registered phase / Project Number s. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done (As on date of Gertificate) (1) (2 (3) (4) (5) 'l Internal Roads & Footpaths Yes 00o/o 2- Water Supply Yes 6o0/o 3. Sewerage (Chamber, Lines, Yes 40Yo Septic Tank, STP) 4. Landscaping & Tree Plantinq Yes 00% Street Lightinq Yes 00o/o A Water Conservation / Rain Water Yes 00o/o Harvesting Fire Protection & Fire Safetv No O0o/o requrrements 8. Electrical Meter Room, Sub- Yes 4Oo/o Station, Receiving Station Overall Project Completed- 75% Yours faithfully, by: License Number (CA/98/23394) Developers Date'.04.07.2024