rf YOG-ESH ZAVAR TIT Archilecls B.Arch., M.C,A., A.l.l.A lll Inierior designers Feg-No. Ct98/23394 TTI Landscape dssign6rs CONCEPTS C+2, D - Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. l\.4obile No. 9325678748 Annexuie A FORM 1 ISee Regulation 3l ARCHITBCT'S CERTIFICATD (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:- 05.07 2023 To, Preetansh DeveloPers, Aurangabad Subject Certificate of Percentage of Completion of Construction Work of KINGS CITY being Developed by having MahaREM Registration Number P51500045884 Preetansh DeveloPers. Sir, | /we have undertaken asslgnmem as Architect / Licensed surveyor of cerlifying Percentage of c"i""rJtii" oi.conitruaion-work of KTNGS CtTy having MahaREM Regisrration Number P515oOO458s4 being Developed by Preetansh Developers' Based on the Site lnspection, with respect to the Layout / each BlildingMing of the aforesaid n""i E"t"t" pt;"a, I certify that as on date of this Certificate, the Percentage of Work Done for e"iliti"sM/,ng of the Real Estate projgct under MahaREM is.as per Table-A herein irJJ ;il". il; ;;;;"Lge "iir," o-f work executed with respect to each of the activity of entire Phase is detailed in Table-B. |f TABLE.A Layout / Building / Wing Number KTNGS Clry A Building (to be prepared separately for each LayouVBuildingA/Ving of project) s. Task / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 1000/0 Stilt Floor 1000/0 q, Slab of Super Structure 100% 7. lnternal Walls, Intemal Plaster, Floorings, Doors, 850/. windows within Flats / Premises 8. Sanitary Fittings within Flats / premises 00% L Staircases, Lift Wells & Lobbies at eich Floor Levet 85% Overhead and Underground WaterTanks 10. External Plumbing & External plaster, Elevation 20% Completion of Terraces, with waterproofing of the Building /Wing 1'1. Installation of Lifts. Water pumps. Fire F[htr'ng fittings 00% .tqurpment s as per CFO NOC, Electrical Fittings, ano l\rechanical Equipments, Compliance to conditions of Environment / CRZ NOC. Finishing to Entrance Lobby/s, Plinth Protection, paving of Areas appurtenant to Building^/Ving, Compound Wa and all other requirements as may be required to complete proiect as per specifications to Agreement of Sale, Anv oiher &!lvity Layout / Building / Wing Number KTNGS Ctry B Buitding (to be prepared separately for each LayouVBu jldingA/Ving of project) q Tasks / Activity Percentage of Actual Work No. Done (As on date ot the Certificate) (1) t2l L3) 1. 1000/0 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor o00/. 6. Slab of Super Structure 00% tf 7. Internal Walls, Internal Plaster, Floorings, Doors, oco/" windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises oo% Staircases, Lift Wells & Lobbies at each Floor Level 00o/o Overhead and Underoround Water Tanks 10. External Plumbing & External Plaster, Elevation, ooo/o Completion of Terraces, with waterproofing of the Building / Wins 11. Installation of Ljfts, Water Pumps, Fire Fighting Fittings 0Oo/o and Equipment's as per CFO NOC, Electdcat Fittings, l\rechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/'1y'Ving, Compound Wall and a other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Layout / Building / Wing Number KINGS CtTy C Building (to be prepared separatety for each LayouuBuilding/Wing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date ofthe Certificate) (1) (21 (3) 1 Excavation 1000/0 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 1000/0 5. Stilt Floor 1007o 6. Slab of Super Structure 55% 7. lnternal Walls, Internal Plaster, Floorings, Doors, oo% windows within Flats / Premises Sanitary Fittings within Flats / Premises o0% 9. Staircases, Lift Wells & Lobbies at each Floor Level 000/0 Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 00% Completion of Teffaces, with waterproofing of the Building /Winq 11 Installation of Lifts, Water Pumps, Fire Fighting Fittings 00% and Equipment's as per CFO NOC, Electrical Fit ngs, Mechanical Equipment's, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s. Plinth Protection. Paving of Aread appurtenant to BuildingM/ing, Compound Wall and all other requarements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity tf TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered phase / Project Number s. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / No) Done (As on date of Certiticatel tll I2l (3) (41 (5) 1. Internal Roads & Footoaths Yes 00% 2. Water SuDolv Yes 00% 3. Sewerage (Chamber, Lines, Yes 000/. Seotic Tank. STP) LandscaDinq & Tree Plantinq Yes 00% Street Liqhtinq Yes 000/" 6. Water Conservation / Rain Water Yes oo% Harvestinq 7. Fire Protection & Fire Safety Yes 00% requirements 8. Electrical Meter Room. Sub- Yes 00o/o Station, Receivino Station Overall Project Completed- 50% Yours faithfully, by: ...,.ti".y' \N"\'/ es {rl r9M,t lo Aqreed & acceDted nrcctansh Oevehmens hrtne? Ar. Yoglst zavar License Number (Ctu98/23394) Developers {)ir nature of Promoter Name:Preetansh Date: 05.07.2023