YOGE,SH ZAVAR B.Arch., l\.4.C.A., A.l.l.A rll ltr Architects Interior designers Reg.No. CA,/98/23394 ITI Landscape designers CONCEPTS C+2, D - Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. Mobile No. 93256787 48 Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at t].e time of Registration of ongoing project & for withdrawal of Money from Designated Account) Date:- 06.01.2023 To, Preetansh Developers, Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of KINGS CITY having MahaREM Registration Number p51s0004s884 being Developed by Preetansh Develooers. Sir, undertaken assignment as Architect / Licensed surveyor of certifying percenrage of I^ry:,1,1y: uomptetion of construction work of KINGS clry having MahaREM Regis'iration Number P51500045884 being Developed by preetansh Developers. Based on the site Inspection, with respect to the Layout / each Buildingping of the aforesaid Real Estate Project, certify that as on date of this Certificate, the Perce-ntage-of Work-Oone -l for each of the BuildingMing of the Real Estate project under MahaREM is ai per tabtl_R herein leloyv. ]te_ne1ce$ase of wort executed witn resnect to eacn of tlre activity'o| e1tir" pitase rs detailed in Table-B. TABLF.A Layout./' Building / wing Number KtNGs ctry A Building (to be prepared separatety for each LayouUBuildingA/Ving of Project) s. Tasks / Activity Percentage of Actuat Work No. Done (As on date of the Certificate) (1) t2l (3) n Excavation 1Qlo/o z. Basements (if any) NA Podiums (if any) NA 4- Plinth 't00% Stilt Floor 100o/o b- Slab of Super Structure 3 Slab Internal Walls, Internal Plaster, Floorings, Doorq 5o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / premises O0o/o Staircases, Lift Wells & Lobbies at each Floor Level R9O/^ Overhead and Underground Water Tanks 10. External Plumbing & External plaster, Elevation 00% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fightingfittings OOo/o and Equipments as per CFO NOC, Electrical Fitting!, Mechanical Equipments, Compliance to conditions oi Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activity Layout / B.uilding / wing Number KINGS clry B Buitding (to be prepared separately for each LayouUBuildingMing of Project) s. Tasks / Activity Percentage of Actuat Work No. Done (As on date of the Certificatel (1) (2) (3) 4 Excavation 00o/o 2. Basements (if any) 00% Podiums (if any) 00o/o 4. Plinth OQo/o Stilt Floor 00o/o o- Slab of Super Structure 00o/o Internal Walls, lnternal Plaster, Floorings, Doors. lQo/o ;T$trf;)E - \orcerty- windows within Flats / Premises .'. Sanitary Fittings within Flats / Premises O0o/o o Staircases, Lift Wells & Lobbies at each Floor Level 00o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 00o/o Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 00o/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Layout / Building / wing Number KINGS clrY c Buitding (to be prepared separately for each LayouUBuilding^/r'ing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificatel (1) (2) (3t 1. Excavation 100o/o 2- Basements (if any) NA o. Podiums (if any) NA 4. Plinth SUo/o Stilt Floor Qlo/o Slab of Super Structure 00o/o Internal Walls, Internal Plaster, Floorings, Doors, 00o/o windows within Flats / Premises a Sanitary Fittings within Flats / Premises Q0o/o o Staircases, Lift Wells & Lobbies at each Floor Level 00o/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 00% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 00% and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing ,to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity ffi TABLE-B Qor.nmol Areas (lnternal & External Development works) in respect of the Registered phase / Project Number s. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done l(As on date of Certificate) (r ) (21 (3) (4) (5) 1. fnternal Roads & Footpaths Yes 00o/o 2. Water Supply Yes 0Oo/o Sewerage (Chamber; Lines, Yes O0o/o Septic Tank, STP) 4. Landscaping & Tree Plantino Yes 00% Street Lighting Yes 00o/o A Water Conservation / Rain W:t,er Yes 00% Harvesting Fire Protection &Fire Safetv Yes jQo/o requirements a Electrical Meter Room, Sub- Yes 00o/o Station, Receiving Station Overall Project Completed- 20% Yours faithfuf ly, Ar.YogeshZavar \ ,r rrtly' \\ \\ \ t ffis qw License Number (CA/98/*394) Agreed & Accepted by: --r\ o::> Signature of Promoter th* Name: Preetansh Developers Date:06.01.2023