YOGESH ZAVAR B.Arch., lV1.C.A., A.l.l.A rlr lIl Architects Interior designers Reg.No. CA,/g8/23394 TTT Landscape designers CONCEPTS C+2, D - Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. Mobile No. 9325678748 A.rrnexrrre A FORM 1 [See Regulation 3] ARCHITECT'S CERTIF'ICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date- 04.10.2022 To, Preetansh Developers, Aurangabad Subject: Certificate of Percentage of Gompletion of Gonstruction Work of KINGS CITY having MahaRERA Registration Number ps1500045884 being Developed by Preetansh Developers. Sir, | / We.have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of completion of construction work of KINGS clrY having MahaREM Registiation Number P51500045884 being Developed by Preetansh Developers. Based on the Site Inspection, with respect to the Layout / each BuildingA/Ving of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project-under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table-8. ffi TABLE.A Layout / Building / wing Number KINGS clrY A Building (to be prepared separately for each LayouVBuildingMing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (21 (3) 1. Excavation 30o/o Basements (if any) OOo/o Podiums (if any) 0Oo/o 4. Plinth 00% Stilt Floor 00o/o 6. Slab of Super Structure OOo/o Internal Walls, Internal Plaster, Floorings, Doors, QOo/o windows within Flats / Premises Sanitary Fittings within Flats / Premises 00o/o Staircases, Lift Wells & Lobbies at each Floor Level 00% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 00o/o Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings OOo/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Layout / Building / Wing Number KINGS Clry B Building (to be prepared sepa.ately for each LayouVBuildingA/Ving of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1t (21 (3) 1. Excavation 00% Basements (if any) OOo/o Podiums (if any) QOo/o 4. Plinth 0Oo/o Stilt Floor 00o/o o. Slab of Super Structure 00o/o 7. Internal Walls, Internal Plaster, Floorings, Doors, OOo/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 00% 9. Staircases, Lift Wells & Lobbies at each Floor Level 00o/o -Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation Qlo/o Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 0Oo/o and Equipmgnts as per CFO NOC, Electrical Fitting!, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingAy'y'ing, Gompound Wall and all other requirements as may be required to complete projecl as per specifications to Agreement of Sale, Any other Activity Layout./ Building /wing Number KINGS ctry c Buitding (to be prepared separately for each LayouVBuildingA/Ving of Project) s. Tasks / Activity Percentage of Actual Work No, Done (As on date of the Certificate) (1) (2) (3) t- Excavation 00o/o z. Basements (if any) O0o/o 2 Podiums (if any) 00% 4. Plinth 00o/o Stilt Floor 00% Slab of Super Structure Qlo/o Internal Walls, Internal Plaster, Floorings, Doorq 00o/o windows within Flats / Premises Sanitary Fittings within Flats / Premises 00o/o o Staircases, Lift Wells & Lobbies at each Floor Level Qlo/o Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation OQo/o Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings oo% and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other Activitv TABLE-B 7 l3 ./ lo1mon Areas (lnternal & External Development works) in respect of the Registered phase / Project'Number s. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done (As on date of Certificate) fl) (21 (3) (4) (5) 1. Internal Roads & Footoaths Yes QQo/o Water Supply Yes 00o/o Sewerage (Chamber, Lines, Yes O0o/o Septic Tank, STP) 4. Landscaping & Tree Plantinq Yes 0oo/o Street Lighting Yes 00o/o o. Water Conservation / Rain Water Yes OOo/o Harvesting Fire Protection & Fire Safety Yes 00% requirements R Electrical Meter Room, Sub- Yes 0Oo/o Station, Receiving Station Overall Project Completed- 0% Yours faithfulty, Ar. Yogesh Zavar License Number (CA/98/23394) \v" Agreed & Accepted by: Signature of Promoter Name: Preetansh Developers Da|e:04.10.2022