YOGESH ZAVAR B.Arch., M.C.A., A.l.l.A lrl T II Architects lnterior designers Reg.No. CA"/98/23394 T II Landscape designers CONCEPTS C+2, D -Wing, First Floor, Bharat Bazar, A.P.l. Corner, Aurangabad. Mobile No. 9A2567g7 48 Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawal of Money from Designated Account) Date- 04.07.2022 To, Preetansh Developers, Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of KINGS ClTy having MahaRERA Registration Number p51500045884 being Developed by Preetansh Develooers. Sir, | / We.have undertaken assignment as Architect / Licensed Surveyor of Certifying percentage of completion of construction work of KINGS clry having MahaREnn negisiration- Number P51500045884 being Developed by preetansh Developers. Based on the site Inspection, with respect to the Layout / each BuildingMing of the aforesaid Real EstateProject, I certify that as on date of this cartificate, the perce;tag;"oihioir bone ror. each of the BuildingMing of the Reat Estate project under MahaRERA is aJ per raiie_n nerein !eloy.v. ].n1oe1celtage of work executed with respe,ct to each of the activity'oi eniire ptase is detailed in Table-B. tr.9 TABLE-A Layout'/ Building / wing Number KINGS cIrY A Building (to be prepared separately for each LayouVBuilding/Wing of Project) S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) fi) (21 (3) 1, Excavation 00% Basements (if any) 00o/o ? Podiums (if any) 00o/o 4. Plinth 00o/o Stilt Floor OOo/o Slab of Super Structure 00% Internal Walls, Internal Plaster, Floorings, Doors, 00o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 00% o Staircases, Lift Wells & Lobbies at each Floor Level 00o/o Overhead and Underground Water Tanks 10. External Plumbing & Extemal Plaster, Elevation, OOo/o Completion of Tenaces, with waterproofing of the Building / Wing 1't. Installation of Lifts, Water Pumps, Fire Fightlng Fittings 00o/o and Equipments as per CFO NOC, Elechical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Layout / Building / wing Number KINGS clrY B Building (to be prepared separately for each LayouUBuildingAlVing of Project) s. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) tzl (3) 1. Excavation 00o/o z. Basements (if any) 00o/o ? Podiums (if any) O0o/o 4. Plinth Qio/o Stilt Floor 00% Slab of Super Structure 00o/o Internal Walls, Internal Plaster, Floorings, Doors, 00o/o windows within Flats / Premises o. Sanitary Fittings within Flats / Premises 00o/o Staircases, Lift Wells & Lobbies at each Floor Level 00% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, OOo/o Completion of Tenaces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings Qio/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, -Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity Layout / Building / wing Number KINGS clw c Building (to be prepared separately for each LayouVBuilding^/t/ing of Project) S. Tasks / Activity Percentage of Actual Work No, Done (As on date of the Certificate) {1) (21 (3) t. Excavation 00o/o z- Basements (if any) QOo/o a Podiums (if any) 00o/o 4. Plinth 00% Stilt Floor 00% o. Slab of Super Structure 00% Internal Walls, lnternal Plaster, Floorings, Doors, 00o/o windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 00o/o 9. Staircases, Lift Wells & Lobbies at each Floor Level 00% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 00o/o Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 00o/o and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to coinplete Project as per specifications to Agreement of Sale, Any other Activity ,@# TABLE-B common Areas (lnternal & E(ernal Development works) in respect of the Registered phase / Project Number s. Common Areas & Facilities Proposed Percentage of actual Work Details No. {Yes / NO) Done (As on date of Certificate) (r ) (21 (3) (4) (5) 1. Internal Roads & Footoaths Yes 00o/o Water Supplv Yes OOo/o Sewerage (Chamber, Lines, Yes OOo/o Septic Tank, STP) 4. Strom Water Drains No 00o/o Landscapinq & Tree Plantinq Yes 00o/o 6. Street Liqhtinq Yes 00% 7. Community Buildinqs No O0o/o 8. Treatment & Disposal of Sewage No QQo/o and Sullage Water o Solid Waste Management & No 00o/o Disposal 10. Water Conservation / Rain Water Yes 00o/o Harvestinq 11. Energy Management No OOo/o 12. Fire Protection & Fire Safetv Yes OOo/o requirements {e Elechical Meter Room, Sub- Yes 00o/o Station, Receivinq Station 14. Others (Option to Add more) No 00o/o Overall Project Completed- 0% Yours faithfully, t.^V \\r[' '\ \ Ar. Yogesh Zavar License Number (CA/98/23394) Agreed & Accepted by: \\ J?y' q$^4zr .'.<: Signature of Prombter Name: Preetansh Developers Datei 04.07.2022 -!