SARTHAK ASsOCIATES Office No.C7, 3 rd Floor, Prozon Trade Center, Prozone Mall, Aurangabad-431006, (Maharashtra) "AR CHITECIS |NT ERIO R DESIGNERS VALU ERS Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date:13/01/2024 To, Nakshatra Enterprises, Ajinkya Plaza, Gut No 107, Nr HDFCBank, 0pp RenukaMata Mandir, Beed By Pass, Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of Sai Residency Annex having MahaRERA Registration Number P51500048600 being developed by Nakshatra Enterprises. Sir, We M/s Sarthak Associates have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Sai Residency Annex having MahaRERA Registration Number P51500048600 being developed by Nakshatra Enterprises. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Tabel A-1 To Be Prepared For BUILDING Type ARow Houses Sai Residency Annex Sr.No, Tasks / Activity Percentage of Work CAI2004/ ín 34295 RCHITEC 1 Excavation 100 X number of Basement(s) and Plinth 100 3 Xnumber of Podiumns 4 Stilt Floor 50 5 Xnumber of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within Flats/Premíses, 0 Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/ Premises, Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level Connecting 0 Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipmentas perCFO NOG, Electrical fittings to Common Areas, electro, mechanical equipment, Complianceto conditions of environment /CRZ NOG, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant toBuildingWing, Gompound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A-2 To Be Prepared For BUILDING Type BRow Houses Sai Residencv Annex Sr.No. Tasks / Activity Percentage of Work 1 Excavation 100 2 Xnumber of Basement(s) and Plinth 100 3 X number of Podiums 4 Stilt Floor 100 5 Xnumber of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Floorings within 100 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/ Premises, Electrical 100 Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 100 connecting Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, 100 elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 100 Fittings and Equipment as per CFO NOG, Electrical fittings to Common Areas, electro, mechanical equipment, Complianceto conditions ofenvironment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall andall other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A-3 To Be Prepared For BUILDING Type CRow Houses Sai Residency Annex Sr.No. Tasks Activity Percentage of Work 1 Excavation 100 2 Xnumber of Basement(s) and Plinth 100 3 X number of Podiums 4 Stilt Floor 100 Xnumber of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Floorings within 100 Flats/Premises,Doors and Windows to each of the Flat/Premíses 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 100 within the Flat/Premises Staircases, Lifts Wells and Lobbjes at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks, 9 The external plumbing and external plaster, elevation, 100 completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and 100 Equipment as per CFO NOG, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance conditions of environment/CRZ NOG, Finishing toentrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal &External Development Works) in respect of the Registered Phase/ Project Number P51500048600 Sai Residency Annex Common areas and Proposed Percentage of Details Sr. No. Facilities, Amenities (Yes/No) Work done 1 Internal Roads &Footpaths No NA 2 w Water Supply Yes 50% Boaring 3 Sewerage( chamber, lines, Yes 50% Chamber lines Septic Tank,STP) 4 Storm Water Drains NO NA 5 Landscaping & Tree No NA Planting Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of No NA sewage and sludge water 9 Solid Waste management & No NA Disposal 10 Water Conservation, Rain Yes 30% As per Norms water harvesting 11 Energy management No NA 12 Fire protection and fire NO NA safety requirements 13 Electrical meter room, NO NA Substation, receiving station 14 Others( option to add more) Yours faithfully, t4295 CHITES Signature &Name (IN BLOCK LETTERS)of Land Surveyor/ Architect License Number ( Agreed &Accepted by: 4/S. RASHATR ENTERPRISES PARTNER Signature of Promoter Name: Nakshatra Enterprises Date:13/01/2024