Er. Sachin Shirsat Civil E ngg. Annexure - B FORM - 2 lsee Regulation 3I ENGINEER'S CERTIFICATE (To be submitted at the time oF Registration of Ongoing project and For Withdrawal of N4oney from Designated Bank Account) Date:03/70/?023 To, Nakshatra Enterprises, Ajinkya Plaza, Gut No 1O7, Nr HDFC Bank, Opp Renuka Mata Mandir, Beed By Pass, Aurangabad Su bject: Certificate of Cost Incurred for Development of Sai Residency Annex having f4ahaRERA Registration Number P51500048600 being devetoped by Nakshatra Enterprises Sir, I / We lvlr. Gautam Wagh have undertaken assagnment of Certifying Estimated Cost for Sai Residency Annex having l4ahaRERA Reqistration Number P515O0O4a6OO being developed by Nakshatra Enterprise 1. I Er. Sachin Shirsat have estimated the cost of Civil, l4Ep and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement oF Sale. Our estimated cost calculations are based on the Drawings/plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by Er. Sachin Shirsat euantity Surveyor* appointed by the Developer/Eng ineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 2. We estimate Total Estimated Cost of completion of the aforesaid project meitroned under reference at Rs. 4,4O,11,740l- (Total of Table A) at the tim€ oF:Registration. The estimated Total Cost of Project is with reference to the Civil, t"1Ep & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the Aurangabad Municipal Corporation Aurangabad being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. k i;'; rq r**11;, iiT*.* ii"{i"jlt .SW Er. Sachin Shirsat Civil Engg. (Total orTable 3. The Estimated cost incurred till date is calculates to Rs. 2,2O,O587O/- A),TheAmountof.EstLnet-gd..e99!.lnqqr.red.is.g?-Lcu.Lq!e-d..90-.!he.'ba'glspltnplr!naleIiaL9 l.serv. Jces. us.ed .q..u.ni!..qqs!,.qf.thege..i!-e,ms-' 4. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works' as per specificationsmentionedinAgreementofsale,oftheaforesaidProjectisestimatedat Rs. 2,20,05870/- (Total ofTable A). 5. I Certify that the cost of Civil, l4EP & Allied Work for apartments & proportionate internal&externalWorks,aspertheSpecificationsmentionedinAgreementofSale, oftheaforesaidProjectaScompletedonthedateofthisCertificateiSasgiveninTable A below: TABLE - A Building Development of the Real Estate Project Proiect Sai Residencv Annex s. Particulars Amount (in Rs,) No. 1, TotarestimaGd Co6t of Building lwing / 4t4O,LL t7 40 / - Layout / Plotted Development as on date of Reqistration is 2. cost fiiurred as on date of Certificate 2,2O,O5a7O l - 3. Work Done in Percentage (as Percentage of 500/o Estimated Cost) Sa on 28'n F@2Q??- 4. Balance Cost tote incurred ** ((based on 2,2O,O5A7O / - Estimated Cost) 5. Cost incurreO on Additional / Extra Items not included in the Estimated Cost (Table-C) zun*qUiqii-i[#ei'r(Ut,9...tqffElt',lRs]withtl"Tl:t-:Y:11. as per section 2(u) or the Actl ffidii&;it6gi;rAi+r"#ie,-diiir,e5'l+bl3#or equivatent Loca r noidi'n{ty, ii.irriii' n ii;6bl ( ir a p p ca b e ) Sirirekor lirg:i. ,':.:....;1:.r-:,.1i. I i I ! fl Agreed & Accepted bY: Signature of Promoter Name : Nakshatra Enterprises OateiO3/70/2023 llh. Xrt hrtta Entcrpriro Er. Sachin Shirsat Civil Engg. Note: 1. The scope of work is to complete Registered Real Estate Proiect as per drawings approved from time to time as per specifications mentioned in the Agreement to Sa le. 2. (*) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. In case oF independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible For the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary From difference between Total EStimatedCoSt(1)&actualcostincurred(2)duetodeviationinquantityreqUired / escalation of cost etc. As this is an Estimated Cost any deviation quantity required fortheDevelopmentofRealEstateProjectwillresultinanamendmentofthecost incurred / to be incurred, 4. All components of work with specifications are indicative & not exhaustive 5, please specify if there are any deviations / qualifications. Example: nny deiation in input material used from specifications in Agreement of Sale' TABLE - C List of Extra / Additional / Deleted ltems considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Amount (in Rs.) Items 1. 2. tl,