SARTHAK ASSOCIATES Office No.C7, 3 rd Floor, Prozon Trade Center, Prozone Mall, Aurangabad-431006, (Maharashtra) " ARCHITECIS |NT ERIO R DESI GNERSVA LUER S Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:05/04/2023 To, Nakshatra Enterprises, Ajinkya Plaza, Gut No 107, Nr HDFCBank, Opp Renuka Mata Mandir, Beed By Pass,Aurangabad Subject: Certificate of Percentage of Completion of Construction Work of Sai Residency Annex having MahaRERA Registration Number P51500048600being developed by Nakshatra Enterprises. Sir, We M/s Sarthak Associates have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Sai Residency Annex having MahaRERA Registration Number P51500048600 being developed by Nakshatra Enterprises. Based on the Site Inspection, with respect to the Layout/ each Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project per Table-A herein below. The percentage of work executed with under MahaRERA is as respect to each of the activity of entire Phase is detailed in Table-B. TabelA-1 To Be Prepared For BUILDING Type ARow Houses Nakshatra Enterprises STNo TasksAciviy TOSH SAN CAI2004/ 34295 ARCHHITES 1 Excavation 2 Xnumber of Basement(s) and Plinth () 3 Xnumber of Podiums 0 4 Stilt Floor X number of Slabs of Super Structure 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doorsand Windows to cach of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Watcr TankS. 9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, waterpumps, ire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipnment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Walland all other requirementsas may be required to Obtain ccupation /Completion Certificate TABLE-A-2 To Be Prepared For BUILDING Type B Row Houses Nakshatra Enterprises STNo. Tasks Activity Percentage oWok 1 Excavation 100 2 Xnumber of Basement(s) and Plinth 100 3 Xnumber of Podiums 4 Stilt Floor 100 Xnumber of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Floorings within 60 Flats/Premises, Doors and Windows to cach of the Flat/Premises CAI2004/ 34295 RCTHITEC Sanitary Fittingswithin the Flat/ Premises,Electrical 30 Fittings within the Flat/Premises Staircases, LiftsWells and Lobbics at cach Floor level 40 connecting Staircases and Lifts, Overhead and Underground Water Tanks. The external plumbing and cxternal plaster, 60 elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 30 Fittings and Equipment as per CFO N0C, Electrical fittings to Common Arcas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-A-3 To Be Prepared For BUILDING Type CRow Houses Nakshatra Enterprises Sr.No. TasksActivity Percenageo 1 Excavation 100 2 X number of Basement(s) and Plinth 100 3 X number of Podiums 4 Stilt Fl00r 100 5 Xnumber of Slabs of Super Structure 100 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings wíthin the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0SH SAKHA CAI2004/ 34295 RCHITEC 9 "The external plumbing and external plaster, clevation, completion of terraces with waterproofing of the Building/Wing 10 Installationof litts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Arcas, clectro, mcchanical cquipment, Compliance to conditions of enviroment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of arcas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal & External Development Works) in respect of the Phase/ Project Number P51500048600 Registered Common areas and Proposed Percentage Details Sr. No. Facilities, Amenities (Yes/No) of Work done 1 Internal Roads &Footpaths No NA 2 Water Supply Yes 50% Boring 3 Sewerage( chamber, lines, Yes 00% Chamber lines Septic Tank,STP) 4 Storm Water Drains NO NA 5 Landscaping &Tree Planting No NA 6 Street Lighting No NA Community Buildings No NA Treatment and disposal of No NA sewage and sludge water 9 Solid Waste management & No NA Disposal 10 Water Conservation, Rain Yes 00% As per Norms water harvesting 11 Energy management No NA 12 Fire protection and fire safety NO NA requirements 13 Electrical meter room, NO NA Substation, receiving station 14 Others( option to add more) SAK CAI2004/ 34295 RCHT Yours faith fully, KOSH CAI2004/ 34295 Signature &Name (IN BLOSKdTERS) f Land Surveyor / Architect License Number( Agreed &Accepted by: Signature of Promoter Name: Nakshatra Enterprises Date: 05/04/2023