R.S. JADHAV ARCHITECT A-306., CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD 431 005 INDIA CONTACT: +91 7875558825, e-mail :jbandassociate1 @gmail.com JB, ASSOEIATE ARCHITECT, INTERIOR, DESIGNER & VALUER FORM1 [See Regulation 3] ARCHITECT'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: 30/09/2025 To, Shree Hinglajmata construction, RIH No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Subject: Certificate of Percentage of Completion of Construction Work of GURUSAHANI TWIN TOWER"situated at plot No-138,S.No-15,N-4 cidco Aurangabad having MahaRERA Registration Number (P51500048239 )being Developed by shri. Hiroo Chimandas Gurusahani( promoter) &shree Hinglajmata construction (co-pormoter) Sir, 1/We have undertaken assignment as Architect /Licensed Surveyor of Certifying Percentageof Completion of Construction Work of 'GURUSAHANI TWIN TOWER" haing MahaRERA Registration Number (P51500048239) being developed by shri. Hiroo Chimandas Gurusahani (promoter) & shree Hinglajmata construction (co-pormoter ) Based on the Site Inspection, with respect to the Layout / each BuildingWing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the ativity of entire Phase is detailed in Table-B. ALLAM.C.AU Reg.No. CAI10/4C367 Layout /Building / Wing Number: Stand TABLE-A alone single building having only one wing S Tasks I Activity No. Percentage of Actual Work Done (As on date of the (1) (2) Certificate) 1. Excavation (3) 2. 100 % Basements (if any) 100% Podiums (if any) 4 Plinth 5. Stilt Floor 6 Slab of Super Structure 100 % 7 Internal 100 % Walls, Internal Plaster, Floorings, Doors, 100 % windows within Flats / Premises Sanitary Fittings within Flats/ Premises 100 % 9 Staircases, Lift Wells & Lobbies at each Floor Level 100% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Completion of Terraces, with waterproofingElevation, of the 100% Building/Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Applicable points Mechanical Equipments, Compliance to conditions of completed 100 % Environnment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingWing, Compound Wal and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal& External Development Works) in respect of the Registered Phase / Project Number S Common Areas & Facilities Proposed Percentage of Details No. (Yes /NO) actual Work Done (As on date of Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 0 AMCRoads 2 Water Supply Yes 100% As per details obtained from consultant TAJ.A M.C.A og.No. CAI10/40357), 3 Sewerage .(Chamber Lines, Yes 100% AMC chamber line Septic Tank, STP) 4. Strom Water Drains No NA |ooo 5 Landscaping &Tree Planting No NA 6. Street Lighting No NA 7. Community Buildings No NA 8 Treatment &Disposal of Sewage No NA and Sullage Water 9 Solid Waste Management & No 0 NA Disposal Water Conservation / Rain Water Yes 100 % As per details 10. from Harvesting obtained consultant 11. Energy Management No 12. Fire Protection & Fire Safety Yes 100% As per details from requirements consultant/ fire NOC 13. Electrical Meter Room, Sub- No 0 NA Station, Receiving Station 14. Others (Option to Add more) No JAD fAJJAM.C.A. Reg.No. CAI10/4C367 Yours faithfully, Signature & Name of Architect JADHAV .R.S Agreed &Accepted by: Signature shri.Hiroo Chimandas Gurusahani( promoter) oriREE, MINGLAJMAIA CONSIRUCTIONS shree Hinglajmata construction (co-pormoter) Dartnes Date:30/09/2025