-N.G. Karkhane B.E. (Hons.) (Pilani), M. Tech.,(11T, Mum.), FLE., FI.V, MISSE, MWWA, MACI (USA) * Consulting Civil Engineer Structural Designer Government Registered Property Valuer (CAT I-474) (M) 9823028081 Structural Auditor, Chartered Engineer(F-111017-5) 'MOGRA' Rana Nagar, Opp. Hotel Atithi, Jalna Road, Aurangabad -431 003. E-mail: ngkarkhane@gmail.com Annexure B FORM-2 [See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project andfor Withdrawal of Money from Designated Account-Project wise) Date: 09/07/2025 To The Shree Hinglajmata Constructions Row House No. Al/4, TirupatiPark, Gurusahani Nagar, N4 Cidco, Aurangabad. 'Subject: Certificate of Cost Incurred for Development of 'Gurusahani Twin Towers' having MahaRERA Registration Number P-51500048239 (Only Applicable after project Registration) being developed by Shree Hinglajmata Constructions. Sir, 1. IN.G. Karhane have undertaken assignment of CertifyingEstimated Cost for Gurusahani Twin Towers, having Maha RERA Registration Number P-51500048239 (Only Applicable after project Registration being developed by Shree Hinglajmata Constructions. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartnments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to (2) us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by N.G. Karhane Quantity Surveyor appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 8.0 Cr. (Total of Table A B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Buildingis) I Wingis) I Layout / Plotted Development from the 07/10/2021 being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs. 7.75 Cr Total of Table A & B). The Amount of Estimated Cost Incurred is calculated on the basis of input materials /services used& unit cost of these items. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 0.25 (AMC-59/59j16 (3) Cr (Total of Table A & 6. ICertify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE-A Building/Wing/LayoutPlotted Development bearing RERA No. P51500048239 or called 'Gurusahani Twin Towers' (to be prepared separately for each Development of the Real Estate Project). S.No Particulars Amount (in Rs) Total Estimated Cost of Building/Wing/ 8.00 Cr. LayoutPlotted Development as on date of Registration is 2 Cost incurred Certificate as date of 7.75 Cr Certificate. 3 Work Done 1n Percentage (as 96.88% Percentageof Estimated Cost) 4. Balance Cost to be incurred ((based on 0.25 Cr Estimated Cost). 5. Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C). (4) TABLE-B Internal & External Development Works in respect of Registered Phase. S.No Particulars Amount (in Rs) 1. Total Estimated Cost of Internal & External Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred Certificate as on date of Certificate. 3. Work Done in Percentage (as Percentage of Estimated Cost). 4. Balance Cost to be incurred (based on Estimated Cost). 5 Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table C). Yours Faithfully, N.G. KARKHANE Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than Bachelor's Degree Holler or equction 2(u) of the Act) NG. KARKHANZ DEH,Mh FN,PE, MSE MWAMACI (URAY 0LTNO CMENGNEFR UCTUL CTURALADTOR T. EGT. P O R Mogrr Op. WUER (1f applicable) Local Authority license no. Agreed and Accepted by: Signature for on behalf of Shree Hinglajmata Constructions Name: DEVENDRA A. DESHPANDE SHREE HINGLAJMATA CONSTRUCTIONS Date: For on behalf of Land Owner/Promoter/ Patne DR. HIROOC. GURSAHANI Darner (Personnel Capacity) Project as Note: complete Registered Real Estate is to The scope of work specifications 1. per approved fromn time to time and as per drawings sale. mentioned in agreement of office of Engineer or can be can be done by certificate of 2. () Quantity survey Surveyor, whose independent Quantity In of done by an relied upon by the Engineer. be the quantity calculated can being appointed by Developer,case surveyor in independent quantity place marked () and mentioned at the to be name of the office of Engineer, the name has calculated by quantity are being who is responsible for the quantity Engineer, person in the office of mentioned at the place marked (*). calculated should be may vary from Difference be incurred (4) 3. (**) Balance Cost to (1) and Actual Cost incurred (2) due Cost between Total estimated escalation of cost etc. As this is an required / to deviation in quantity required for development of the Real quantity estimated cost any in the cost incurred / to be Estate Project will result in amendment of incurred. with specifications are indicative and not 4. Allcomponents of work exhaustive. deviations/qualifications. Example: 5. Please specify if here are any used from specifications in in input material Any deviations agreement of sale, Table C Items considered in Cost. (which List of ExtralAdditional/Deleted Cost) Estimate of Total were not part of the original /Additional/Deletes Amount (in Rs) S.No List of Extra Items. 1. 2