R. S. JADHAV ARCHITECT A-306, CITIUS, SPACE OLYMPIA, NEAR GARKHEDA STADIUM SUTGIRNI CHOWK, GARKHEDA, AURANGABAD - 431 005 INDIA CONTACT: +91 7875558825, e-mail : jbandassociate1@gmail.com J3. ASSOCIATE ARCHITECT, INTERI0R, DESIGNER & VALUER FORM1 (See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project &for Withdrawal of Money from Designated Account) Date: 30/06/2025 To, Shree Hinglajmata construction, RH No- A4,tirupati park, Opp saraswat bank, Gurusahani nagar N-4,cidco .Chh.sambhaji nagar. Subject: Certificate of Percentage of Completion of Construction Work of TWIN TOWER" situated at plot No-138,S.No-15,N-4 'GURUSAHANI MahaRERARegistration Number (P51500048239 ) being cidco Aurangabad having shri. Hiroo Chimandas Gurusahani( promoter) & Developed by construction (co-pormoter ) shree Hinglajmata Sir, T/We have undertaken assignment Completion of Construction Work asof Architect / Licensed Surveyor of Certifying 'GURUSAHANI Registration Number (P51500048239) being developed TWIN TOWER" havingPercentageMahaRERA of Gurusahani (promoter) &shree Hinglajmata by shri. Hiroo construction (co-pormoter ) Chimandas Based on the Site Inspection, Real Estate Project, Icertify thatwithas respect to the Layout / each on date of this Certificate, theBuildingWing of the aforesaid each of the BuildingWing of the Real Estate Project under MahaRERA Percentage of Work Done for below. The percentage of work executed with is as per Table-A herein detailed in Table-B. respect to each of the activity of entire Phase is OHAVA A.LA.M.C.A Reg.No. GA/10140367y CH TABLE-A building having only one wing Lavout / Building /Wing Number :Stand alone single Percentage of Actual Work Tasks / Activity Done S. No. (As on date of the Certificate) (3) (2) 100 % (1) 1 Excavation 100 % 2 Basements (if any) 3 Podiums (if any) 4 Plinth 100 % 5 Stilt Floor 100% 6. Slab of Super Structure 99% Plaster, Floorings, Doors, 7. Internal Walls, Internal windows within Flats / Premises 100 % Sanitary Fittings within Flats /Premises 100% 8 Level & Lobbies at each Floor 9. Staircases, Lift VWells Water Tanks Overhead and Underground 100 % External Plaster, Elevation, External Plumbing & the 10. Completion of Terraces, with waterproofing of points Building / Wing Applicable Pumps, Fire Fighting Fittings completed 98% Installation of Lifts, Water 11. NOC, Electrical Fittings, and Equipments as per CFO Compliance to conditions of Mechanical Equipments, Finishing to Entrance Environment / CRZ NOC, Paving of Areas appurtenant Lobby/s, Plinth Protection, Building/Wing, Compound Wall and all other to required to complete Project requirements as may be Any other Agreement of Sale, as per specifications to Activity TABLE-B Development Works) in respect of the Registered Phase / External Common Areas (Internal & Project Number Details Proposed Percentage of Common Areas & Facilities actual Work S. (Yes / NO) No. Done (As on date of Certificate) (3 (4) (5) (1) (2) No AMC Roads Internal Roads & Footpaths As per details 1. Yes 100% Water Supply obtained from 2 Consultant ADHA A.lLA.M.C.A Reg.No. CA/M0/4C957 (Chamber Lines, Yes 100% AMC chamber line 3 Sewerage Septic Tank, STP) No NA 4. Strom Water Drains No NA Landscaping &Tree Planting No NA 6 Street Lighting 0 NA Community Buildings No 7 NA 8 Treatment & Disposal of Sewage No and Sullage Water NA Solid Waste Management & No Disposal 100 % As per details 10. Water Conservation / Rain Water Yes obtained from Harvesting Consultant No 0 11. Energy Management 95% As per details from Fire Protection & Fire Safety Yes consultant/ fire NOC 12. requirements NA 13. Electrical Meter Room, Sub- No Station, Receiving Station No 0 14. Others (Option to Add more) HAV A.J.LA.M.C.A Reg.No. CA/M0/4c367, Yours faithfully, CHYT Signature &Name of Architect JADHAV.R.S Agreed &Accepted by: Signature SHREE HINGLAJNATA CONSTRUCTIONS shri.Hiroo Chimandas Gurusahani( promoter) shree Hinglajmata construction (co-pormoter ) Dartner Datne Date:30/06/2025