-N.G. Karkhane B.E. (Hons.) (Pilani), M.Tech., (l1T, Munm.), F..E., F..V., MISSE, MwWA, MACI (USA) * Consulting Civil Engineer Structural Designer 3 Government Registered Property Valuer (CAT I-474) (M) 9823028081 4 Structural Auditor, Chartered Engineer(F-111017-5) 'MOGRA' Rana Nagar, Opp. Hotel Atithi,Jalna Road, Aurangabad -431 003. E-mail: ngkarkhane@gmail.com Annexure B FORM-2 [See Regulation 3) ENGINEER'S CERTIFICATE (Tobe submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account-Project wise) Date: 08/04/2025 To The Shree Hinglajmata Constructions Row House No. A1/4, Tirupati Park, Gurusahani Nagar, N4 Cidco, Aurangabad. Subject: Certificate of Cost Incurred for Development of"Gurusahani Twin Towers' having MahaRERA Registration Number P-51500048239 (Only Applicable after projectRegistration) being developed by Shree Hinglajmata Constructions. Sir, 1. IN.G. Karhane have undertaken assignment of Certifying Estimated Cost for Gurusahani Twin Towers, having Maha RERA Registration Number P-51500048239 (Only Applicable after project Registration being developed by Shree Hinglajmata Constructions. 2 We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers /Consultants. AM59/89) (2) The Schedule of Items & Quantity required for the entire work as calculated by N.G. Karhane Quantity Surveyor appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 8.0 Cr. (Total of Table A B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agrement of Sale & for the purpose of obtaining Occupation Certificate /Completion Certificate for the Buildingis) I Wingis) I Layout / Plotted Development from the 07/10/2021 being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. 4. The Estimated Cost incurred till date is calculates to Rs. 7.75 Cr Total of Table A & B). The Amount of Estimated Cost Incurred is calculated on the basis of input materials /services used& unit cost of these items. 5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs. 0.25 Cr (Total of Table A & 8AMC-s (3) 6. ICertify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE-A Building/ Wing/Layout/Plotted Development bearing RERA No. P51500048239 or called 'Gurusahani Twin Towers' (to be prepared separately for each Development of the Real Estate Project). S.No Particulars Amount (in Rs) 1. Total Estimated Cost of Building Wing/ 8.00 Cr. Layout/Plotted Development as on date of Registration is 2. Cost incurred Certificate as date of 7.75 Cr Certificate. 3. Work Done in Percentage as Percentage 96.88% of Estimated Cost) 4 Balance Cost to be incurred ((based on 0.25 Cr Estimated Cost). 5. Cost incurred on Additional/Extra Items not included in the Estimated Cost (Table C). 3 A M C - 5 9 / o c (4) TABLE-B Internal & External Development Works in respect of Registered Phase. S.No Particulars Amount (in Rs) 1 Total Estimated Cost of Internal & External Development Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred Certificate as on date of Certificate. 3. Work Done in Percentage (as Percentage of Estimated Cost). 4. Balance Cost to be incurred (based on Estimated Cost). 5. Cost incurred on Additional/Extra Items not included in the Estimated Cost (Table-C). Youts Faithfully, 7 N.G. KARKHANE Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than Bachelor's Degree Holler or equction 2(u)of the Act) N N.G. KARKHAN Toch FIV,FE,MSOE ,MWA °CONSULTWG CIVL ENGINEER UCTURAL DE8IGNER STRUCTURAUGITR. CHARTERED ENGINERR OVT. RGT. PROPERTY VALUER e Op. Hotnl A, Rana Aurn Nagar, ne 1006, Ph.:(0)24A-4306, !Ls1.ak.om6 Local Authority license no. (If applicable) Agreed and Accepted by: Signature for on behalfof Shree Hinglajmata Constructions Name: DEVENDRA A.DESHPANDE Date : SHREE MINGLAJMATA CONSTRUCTIONS For on behalf of Land Owner/Promoter DR. HIROO C. GURSAHANI Dartner (Personnel Capacity) Note: 1. The scope of work is to complete Registered Real Estate Project as specifications per drawings approved from time to time and as per mentioned in agreement of sale. can be 2. () Quantity survey can be done by office of Engineer or certificate of done by an independent Quantity Surveyor, whose quantity calculated can be relied upon by the Engineer. In of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked () and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3 (**) Balance Cost to be incurred (4) may vary-from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost any in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4 All components of work with specifications are indicative and not exhaustive. 5. Please specify if here are any deviations/qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional/Deleted Items considered in Cost. (which were not part of the original Estimate ofTotal Cost) S.No List of Extra /Additional/Deletes Amount (in Rs) Items. 1 2.